Fort Lauderdale Elected Officials Briefing

Fort Lauderdale Elected Officials Briefing

Fort Lauderdale Elected Officials Briefing GROUP 1 FAA December 17, 2019 www.faa.gov Surrounding Airport Flight Tracks Fort Lauderdale Elected Officials Briefing FLL Fort Lauderdale International BCT Airport BCT Boca Raton Airport Authority PMP Pompano Beach Airpark FXE Fort Lauderdale Executive Airport HWO North Perry Airport OPF Miami-Opa Locka Executive PMP Airport MIA Miami International Airport Arrivals and Departures FXE July 7-13, 2018 FLL HWO OPF MIA FAA December 17, 2019 www.faa.gov Fort Lauderdale Arrivals and Departures Fort Lauderdale Elected Officials Briefing FLL Fort Lauderdale International BCT Airport Arrivals and Departures July 7-13, 2018 PMP FXE FLL HWO OPF MIA FAA December 17, 2019 www.faa.gov Fort Lauderdale Elected Officials Briefing GROUP 2 FAA December 17, 2019 www.faa.gov Airport Operations Fort Lauderdale Elected Officials Briefing FLL Airport Operations and Seasonality Source: FAA Air Traffic Activity System (ATADS), 2019 Surrounding Airport Flight Metrics Airport JuLY7-13, July 7-13, July 7-13, % Change November 3- 2014 2018 2019 2014-2019 9, 2019 ** BCT 507 659 690 +36% 653 PMP 480 607 708 +48% 449 FXE 1637 1813 1852 +13% 1589 FLL 4614 6242 5868* +27% 6179 HWO 475 677 691 +45% 660 OPF 1319 1414 1508 +14% 1391 MIA 7506 7724 7752 +3% 7643 * Period of FLL single Runway Operation ** Excluded from % Change as it is not valid comparison FAA December 17, 2019 www.faa.gov Fort Lauderdale Elected Officials Briefing GROUP 3 FAA December 17, 2019 www.faa.gov Fort Lauderdale East Arrivals Fort Lauderdale Elected Officials Briefing FLL Fort Lauderdale International Airport Arrival Operations July 7-13, 2018 Weston Runway 10L Runway 10R FLL Southwest Ranches FAA December 17, 2019 www.faa.gov Fort Lauderdale Instrument Approaches Fort Lauderdale Elected Officials Briefing FLL Fort Lauderdale International Airport Instrument Approaches ILS LOC Runway 10L and Runway 10R Weston HOLID PIONN NOVAE PAKEE ILS LOC RWY10L ILS LOC RWY10R BUNKR BEZER BLAIM LORII ZALAL FLL Southwest Ranches FAA December 17, 2019 www.faa.gov Overflights At or Below 2,900 ft Fort Lauderdale Elected Officials Briefing FXE FLL Fort Lauderdale International Airport FXE Fort Lauderdale Executive Airport HWO North Perry Airport OPF Miami-Opa Locka Executive Airport Overflights at or Below 2,900ft July 7-13, 2018 Weston FLL Southwest Ranches HWO OPF FAA December 17, 2019 www.faa.gov Fort Lauderdale Elected Officials Briefing GROUP 4 FAA December 17, 2019 www.faa.gov FLL Airport Layout Fort Lauderdale Elected Officials Briefing October 2012 July 2018 Before runway extension After runway extension July 2019 November 2019 North runway closure Current state FAA December 17, 2019 www.faa.gov Fort Lauderdale Elected Officials Briefing GROUP 5 FAA December 17, 2019 www.faa.gov Fort Lauderdale Elected Officials Briefing Metroplex Project Goals WHAT DOES THIS PROJECT HOPE TO ACHIEVE? WHY ARE WE DOING THIS PROJECT? Take advantage of Performance Based Navigation by The existing departure and arrival procedures do not take full implementing procedures that will help enhance the safety advantage of modern technology. The project will replace and efficiency of the airspace. outdated systems with satellite-based technology. Provide deconfliction of arrivals and departures for airports in Improve the predictability of air traffic flows to enhance safety close proximity to one another, allowing for independent and efficiency while reducing the workload for air traffic operations at each airport. controllers and pilots. Reduce conflicts in routes between Florida airports, and in Reduce airspace constraints associated with restricted military routes connecting Florida to other national and international airspace, general aviation operations, space vehicle launches, destinations. and drones. Improve air traffic flow and efficiency, in order to keep pace Provide environmental benefits by reducing carbon emissions with the growth in aviation and tourism in Florida. and aircraft fuel consumption. FAA December 17, 2019 www.faa.gov Fort Lauderdale Elected Officials Briefing Metroplex Project Phases • Approximately 9 months Study Phase • Coordination with airports Design and • Approximately 12 months Procedure • Public workshops and comments Development Operational, • Approximately 12 months Environmental, • Draft Environmental Assessment (EA) and Safety We are here • Public workshops and comments Review • Approximately 12 months Implementation • Final EA/Record of Decision and public notification and Training • Training, procedure publication and implementation • Approximately 7 months Post- • Post-implementation analysis Implementation • Procedure adjustments For more information please visit: https://www.faa.gov/air_traffic/community_involvement/florida/ FAA December 17, 2019 www.faa.gov.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us