ART COMMISSION PUBLIC MEETING TUESDAY, OCTOBER 12, 2004 10:05 a.m. Consent Agenda 21984: Reconstruction of the Charles Gay Clarke Thomas Building, One Wards Island, Manhattan. (Preliminary and Final) (CC 22, CB 11) DDC 21985: Construction of Two Additions to Queens Theater in the Park, Phase II, Flushing Meadows Corona Park, 56-05 Grand Central Parkway, Queens. (Final) (CC 21, CB 4) DDC/DPR 21986: Installation of historic lighting, Coney Island Boardwalk between West 37th Street and Brighton 15th Street, Brooklyn. (Preliminary and Final) (CC 47, CB 13) DPR 21987: Construction of a wild dogs exhibit, Bronx Zoo, 2300 Southern Boulevard, Bronx. (Preliminary and Final) (CC 14, CB 6, 11) DCultA 21988: Conservation of Acrobats by Mary Callery, George W. Wingate High School, 600 Kingston Avenue, Brooklyn. (Preliminary) (CC 40, CB 9) DOE 21989: Conservation of Education-Aspiration by Gwen Lux, George W. Wingate High School, 600 Kingston Avenue, Brooklyn. (Preliminary) (CC 40, CB 9) DOE 21990: Replacement of Baptist Church Road Bridge, Baptist Church Road over Hunters Brook, adjacent to Croton Reservoir, between Croton Avenue and Hunter Brook Road, Westchester. (Preliminary and Final) DEP 21991: Construction of an electrical control building and odor control system enclosure, Warnerville Pumping Station, Brookville Boulevard and Broadway, Queens. (Preliminary) (CC 31, CB 13) DEP 21992: Reconstruction of Avenue V Pumping Station, 76 Avenue V, Brooklyn. (Preliminary) (CC 47, CB 13) DEP 21980: Installation of four F-pole street lights, West 104th Street between Riverside Drive and West End Avenue, Manhattan. (Preliminary and Final) (CC 9, CB 7) DOT 21993: Installation of new stoop and fenced area, 336 West 23rd Street, Manhattan. (Preliminary and Final) (CC 3, CB 4) DOT Public Meeting/ Tuesday, October 12, 2004/ Page 2 22007: Installation of a distinctive sidewalk, 810 Seventh Avenue, Manhattan. (Preliminary and Final) (CC 10, CB 5) DOT 22010: Installation of a bronze sculpture by Tom Otterness, Glasshouses for Living Collections, New York Botanical Garden, 200th Street and Kazimiroff Boulevard, Bronx. (Preliminary) (CC 11, CB 7) DCA Public Meeting 10:10 a.m. 21994: Installation of a Korean War Veterans Memorial by William Crozier, Kissena Park, Rose Avenue and Parsons Boulevard, Queens. (Conceptual) (CC 20, CB 7) DPR 10:40 a.m. 21995: Construction of landscape setting for Korean War Veterans’ Memorial by William Crozier, Kissena Park, Rose Avenue and Parsons Boulevard, Queens. (Preliminary) (CC 20, CB 7) DPR 11:00 a.m. 21996: Construction of landscape setting for the Jackie Robinson and Pee Wee Reese Memorial by William Behrends, Keyspan Stadium main entrance, 1904 Surf Avenue, Brooklyn. (Preliminary) (CC 47, CB 13) DPR 11:25 a.m. 21997: Reconstruction of Sutton Place Park, above the FDR Drive, East 56th Street to East 57th Street between Sutton Place and the East River, Manhattan. (Preliminary and Final) (CC 5, CB 6) DPR 12:50 p.m. 21998: Reconstruction of Williamsbridge Square Park, Gun Hill Road north and south between White Plains Road southbound, White Plains Road northbound and East 212th Street, Bronx. (Preliminary and Final) (CC 12, CB 12) DPR/NYCTA 1:10 p.m. 21999: Construction of Harlem River Bikeway and Promenade, Phase II, Harlem River Drive between 139th Street and 143rd Street, Manhattan. (Preliminary) (CC 9, CB 11) DPR WITHDRAWN Public Meeting/ Tuesday, October 12, 2004/ Page 3 1:15 p.m. 22000: Masterplan for Seaside Nature Park, Nelson Avenue, Cleveland Avenue, Tennyson Drive and the bulkhead line, Staten Island. (Conceptual) (CC 51, CB 3) DPR 1:45 p.m. 22001: Masterplan for Seaside Nature Park, Phase I, Nelson Avenue, Cleveland Avenue, Tennyson Drive and the bulkhead line, Staten Island. (Preliminary) (CC 51, CB 3) DPRWITHDRAWN 1:35 p.m. 22002: Construction of a shelter and fence, Socrates Sculpture Park, Vernon Boulevard, Broadway and 31st Road, Queens. (Preliminary) (CC 26, CB 1) DPR 1:55 p.m. 22003: Construction of Keltch Park Restaurant, Keltch Park, Jerome Avenue and 170th Street, Bronx. (Preliminary) (CC 16, CB 4) DPR 2:15 p.m. 22004: Restoration of Columbus Monument, Columbus Circle, Eighth Avenue, Broadway and Central Park West, Manhattan. (Preliminary) (CC 6, CB 7) DDC/DPR 2:40 p.m. 22005: Renovation of a façade, Brooklyn House of Detention for Men, 275 Atlantic Avenue, Brooklyn. (Final) (CC 33, CB 2) DDC 3:00 p.m. 22008: Installation of a distinctive sidewalk and new street trees, Museum of Modern Art, 11 West 53rd Street, Manhattan. (Preliminary and Final) (CC 3, 4, CB 5) DOT 3:20 p.m. 22009: Installation of a distinctive sidewalk, Liberty Plaza Park, Liberty Street, Broadway, Cedar Street and Trinity Place, Manhattan. (Preliminary and Final) (CC 1, CB 1) DOT 3:40 p.m. 22006: Installation of sidewalk planters, 101-360 Willoughby Street, Metrotech Center, Brooklyn. (Preliminary and Final) (CC 33, CB 2) DOT Public Meeting/ Tuesday, October 12, 2004/ Page 4 THE ART COMMISSION PUBLIC HEARING TUESDAY, OCTOBER 12, 2004 WILL BE HELD IN CITY HALL PLEASE NOTE, ALL TIMES ARE APPROXIMATE. ANY PERSON REQUIRING REASONABLE ACCOMMODATION IN ORDER TO PARTICIPATE IN THE HEARING SHOULD CALL OR WRITE THE ART COMMISSION NO LATER THAN FIVE (5) BUSINESS DAYS PRIOR TO THE MEETING. ART COMMISSION CITY HALL, THIRD FLOOR NEW YORK, NEW YORK 10007 T. 212.788.3071 F. 212.788.3086 Public Meeting/ Tuesday, October 12, 2004/ Page 5 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-