MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/2886 Jabalpur, dated:30.10.2019 To As per distribution list Sub: Minutes of 71st meeting of Operation and Coordination Committee of MP. … The Minutes of 71st meeting of the Operation and Coordination Committee of MP held on 20th September 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail- [email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail- [email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M- 9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected]. 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected], 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected] 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] MINUTES FOR 71st MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 20th SEPTEMBER 2019 AT 11:00 AM AT Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The 71st meeting of Operation & Coordination Committee of MP was held on 20th September 2019 at 11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure -1.0. Shri K.K.Parbhakar, C.E.(SLDC) & Chairman OCC welcomed all the guests & participants to 71st OCCM of MP. Chairman OCC stated that 50% of maximum demand of the state is being met by RE and Hydel as Hydel is about 2800-2900 MW, hence thermal units are under backing down. During the last months the Grid operations and system was smooth but the upcoming months might be crucial as there may be shortfall of about 600-700MW for the demand forecasted by Discoms, even after purchasing from all the availability sources. During peak hours, SLDC & MPPMCL is planning to manage the shortfall and met the demand by power purchase from open access & other sources. Another challenge is the shortage of coal in thermal units of MPPGCL, seeing to their coal shortage/supply pattern of last months and it is an area of concern as during peak period it will not be feasible to stop the unit due to coal shortage. Hence MPPGCL is requested to kindly resolve the coal shortage problem and ensure the required coal supply and maintain adequate coal stocks during the peak season and approximately 3800MW power will be required to mitigate the forecasted Demand from the month of November 2019 onwards. Representative from MPPGCL informed the committee that the coal companies have restricted the coal supply due to pending bill. Further Chairman OCC stated that MPPGCL shall take up the matter with Govt. and ensure to maintain the adequate coal stock. Chairman OCC informed the committee that SLDC has to submit a Detailed Operating Procedure for backing down of SSGS units in line with CERC guidelines after discussing/providing copy of the procedure to all the entities. Where in Discom have to pay compensation to generating companies if the generators are taken ON BAR below normative PLF. It will be implemented after the approval by the commission. Thereafter he requested Shri. R.A.Sharma, Addl. CE, SLDC & Member Secretary OCCM to take up the agenda points. ShriR.A.Sharma, Addl. CE, SLDC stated that Chairman OCCM has discussed the complete gist in his opening remarks, especially regarding the demand and supply management in MP Grid. He shown his concern about the voltage management in the ensuing Rabi season. He also mentioned his concern to identify the pockets in advance where load management will be required as load diversion will also be required from Discom sides for the critical pockets during rabi season. The load diversion shall also be planned in advance to maintain uninterrupted 24X7 supply. Thereafter he requested the guests & participants for introduction. Thereafter the agenda points were taken up, which are narrated here under :- ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 70th meeting of Operation & Coordination Committee of MP held on 09th July 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2432 Jabalpur dated 12.09.2019. No comments have been received. Committee confirms the minutes. Minutes of 71st OCCM of MP 1 ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS JUNE 2019 TO JULY 2019. 2.1. Frequency Particulars: The committee was apprised that during JUNE 2019 the system frequency was below 49.90 Hz for 9.87% of time against 7.09% of time during JULY 2019. The system frequency was above 50.05 Hz for 19.79% of time during JUNE 2019 against 24.64 % of time during JULY 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 70.34 % of the time during JUNE 2019 against 68.27 % of time during JULY 2019. The average monthly frequency was 50.00 Hz during month of JUNE 2019 and 50.00 Hz during month of JULY 2019. The detailed frequency particulars for the month of JUNE 2019 and JULY 2019 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:- Minimum Maximum Instantaneous Instantaneous Average Integrated integrated Month Minimum Maximum frequency frequency over frequency over an Frequency Frequency an hour hour JUNE 2019 50.00 Hz 49.80 Hz 50.23 Hz 49.63 Hz 50.31 Hz JULY 2019 50.01 Hz 49.83 Hz 50.16 Hz 49.64 Hz 50.32 Hz 2.2 Operational Matters 2.2.1 Operational Discipline: The committee was apprised that system operated in terms of frequency profile for the months JUNE 2019 & JULY 2019 is as given below for discussion by the committee: % of time % of time frequency % of time Frequency Average monthly Month Frequency within the permissible above 50.05 Hz frequency Below 49.90 Hz range of 49.90-50.05 Hz.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages98 Page
-
File Size-