Brighton and Hove Draft City Plan

Brighton and Hove Draft City Plan

Contents Part One: Introduction page no. Introduction and Overview 4 A profile of Brighton & Hove – context and challenges 10 Part Two: The Strategy Vision and Objective 16 The Strategy 22 Part Three: Development and Special Area policies DA1 – Brighton Centre and Churchill Square Area 28 DA2 – Brighton Marina, Gas Works and Black Rock Area 32 DA3 – Lewes Road Area 39 DA4 – New England Quarter and London Road Area 46 DA5 – Eastern Road and Edward Street Area 53 DA6 – Hove Station Area 60 DA7 – Toad’s Hole Valley 65 DA8 – Shoreham Harbour 71 SA1 – The Seafront 76 SA2 – Central Brighton 83 SA3 – Valley Gardens 88 SA4 – Urban Fringe 92 SA5 – The South Downs 95 SA6 – Sustainable Neighbourhoods 98 Part Four – City Wide Policies A Strong and Prosperous City CP1 Housing Delivery 106 CP2 Sustainable Economic Development 112 CP3 Employment Land 116 CP4 Retail Provision 121 CP5 Culture and Tourism 124 CP6 Visitor Accommodation 128 CP7 Infrastructure CIL and Developer Contributions 131 A Sustainable City CP8 Sustainable Buildings 134 CP9 Sustainable Transport 139 CP10 Biodiversity 149 CP11 Flood Risk 152 An Attractive City CP12 Urban Design 155 CP13 Public Streets and Spaces 158 CP14 Housing Density 160 CP15 Heritage 163 CP16 Open Space 165 CP17 Sports Provision 170 Healthy and Balanced Communities CP18 Healthy City 176 CP19 Housing Mix 178 CP20 Affordable Housing 182 CP21 Student Housing and Housing in Multiple Occupation 185 CP22 Traveller Accommodation 189 Appendix 1 Glossary of terms 192 Appendix 2 Key Diagram 200 Annexes (published separately) Annex 1: Implementation and Monitoring Annex 2: Infrastructure Delivery Plan Annex 3: Housing Implementation Strategy List of Tables Table 1 – City Plan part 1 preparation timetable 5 Table 2 – One Planet Principles of Sustainability 23 Table 3 – Summary of Development Proposals 26 Table 4 – Housing Delivery, Supply Breakdown 2010-2030 110 Table 5 – City Plan Employment Floorspace 117 Table 6 – Estimated Retail Need 123 Table 7 – Definition of Development Size 137 List of Figures Figure 1 Relationship of City Plan to other Strategies 6 Figure 2 – Housing Trajectory 2010 – 2030 109 List of Key Illustrations DA1 – Brighton Centre and Churchill Square Area 28 DA2 – Brighton Marina, Gas Works and Black Rock Area 32 DA3 – Lewes Road Area 39 DA4 – New England Quarter and London Road Area 46 DA5 – Eastern Road and Edward Street Area 53 DA6 – Hove Station Area 60 DA7 – Toad’s Hole Valley 65 DA8 – Shoreham Harbour 71 SA1 – The Seafront 76 SA2 – Central Brighton 83 SA3 – Valley Gardens 88 SA4 – Urban Fringe 92 SA5 – The South Downs 95 SA6 – Sustainable Neighbourhoods 98 2 Part 1 Introduction 3 Introduction & Overview What is the City Plan? 1.1 The City Plan is the first Development Plan Document (DPD)1 to be produced as part of a wider set of local planning policy documents known as the Brighton & Hove’s Local Development Framework. Its purpose is to provide the overall strategic and spatial vision for the future of Brighton & Hove through to 2030. It will help shape the future of the city and plays an important role in ensuring that other citywide plans and strategies achieve their objectives. 1.2 The City Plan Part 1 sets out how the council will respond to local priorities; how it will meet the social, economic and environmental challenges that face the city; and how it will work with partners to reduce inequalities. It identifies the broad locations, scale and type of development and supporting infrastructure that will take place in the city. The City Plan also responds to, and provides for, the needs of a growing population and a growing local economy and reflects the role and importance of the city in the sub region and the south east. 1.3 The City Plan Part 1: • Sets out a vision and objectives for the development and growth of Brighton & Hove up to 2030; identifies broad locations for development and allocates strategic sites and employment sites; • Sets clear policies that guide decisions on planning applications; • Indicates how the plan will be implemented and shows how progress will be monitored; • Sets out the infrastructure requirements for the city up to 2030 and how these will be addressed. Other Local Development Framework Documents 1.4 The policies in all the other documents forming the Brighton & Hove LDF have to be in line with the City Plan Part 1, so it is the most important part of the LDF. • The City Plan part 2 will contain site allocations and the remaining development management policies. • A Joint Area Action Plan (JAAP) is being developed with Adur District Council and West Sussex County Council that will set out a comprehensive, deliverable plan for the future revitalisation of Shoreham Harbour. • Supplementary Planning Documents will provide guidance on specific areas or topics. • Waste and Minerals Plan - the Council, working in partnership with East Sussex County Council and the South Downs National Park Authority, is preparing a Waste and Minerals Plan that will provide planning policies to guide the management of waste and production of minerals in the plan area until 2026. 1 Development Plan Document (DPDs). DPD's are the key statutory documents within Local Development Framework's and will set out the vision, strategy and policies for the area. They are subject to Sustainability Appraisal and to a formal examination in public. The City Plan Part 1 is Brighton & Hove’s Core Strategy. 4 • The South Downs National Park was formally designated in April 2010 and the National Park Authority brought into effect in April 2011. This is now the planning authority for the administrative area of Brighton & Hove that falls within the National Park. This area will no longer be covered by Brighton & Hove City Plan Part 1 policies but will be covered by the Core Strategy for the National Park. Table 1 City Plan Part 1 Preparation Timetable Stage Date Reg 18: Options Consultation October-November 2011 Reg 18: Draft City Plan May - July 2012 Consultation Publication of the Document January – February 2013 Date for submission to Secretary of April 2013 State Pre-examination meeting with June 2013 Inspector Examination in Public (estimated) Early September 2013 Estimated date for adoption by the January 2014 council Relationship to other Strategies 1.5 The City Plan Part 1 has been informed the aims of the city’s Sustainable Community Strategy, other citywide plans and strategies and national planning policy and feedback from consultation. Figure 1 shows the relationship to these documents. Policies in the City Plan are in conformity with the National Planning Policy Framework and apply it at the local level. 1.6 The Localism Act sets out the government’s intention to revoke regional spatial strategies. It is acknowledged that any move to revoke existing regional strategies is subject to the outcome of the consultation on the related environmental assessments that ended 20 January 2012. Whilst the South East Plan) remains part of the list of documents which local authorities must have regard to when preparing their development plans the government has indicated that subject to the assessment process they expect the orders revoking the existing Regional Plans to take effect Spring 2012. Therefore although it is considered that the draft City Plan remains in conformity with the South East Plan it is not referred to explicitly within the City Plan. 5 Figure 1 Relationship of the City Plan to other Strategies Links to neighbouring areas 1.7 Brighton & Hove provides jobs, entertainment, shops and leisure, health and education facilities for people living in neighbouring areas. The city is a regionally significant visitor economy and a transport hub. Brighton & Hove’s Travel to Work Area (TTWA), stretches north through Burgess Hill and towards Haywards Heath and Crawley, east to Newhaven and Lewes and west as far as Shoreham and to a lesser extent Worthing. In 2001, census data shows that the city had a relatively self-contained labour market with 75% of the workforce living within the City’s boundaries in 2001. The major commuting flows into the City were from Lewes District (representing 7% of the City’s workforce), Adur (5%), Mid Sussex (3%) and Worthing (3%). In 2001, 7% of the City’s resident working population commuted to London for work. 1.8 Brighton and Hove forms part of a Sussex Coast housing market which includes Lewes District as well as Coastal West Sussex. A key feature of the housing market dynamic in Brighton & Hove particularly is movement of households from London to Brighton with movement of over 4000 people per annum, many of whom continue to commute to the capital supported by the strength of the rail links. This reflects the City’s strategic accessibility. 6 1.9 Brighton & Hove is also a member of the Coast to Capital Local Enterprise Partnership which sees international trade activity as the core economic driver that determines the functional economic area, which is reliant on Gatwick Airport. Recognised as one of the south east’s key growth areas, the Gatwick diamond is linked to Brighton and Hove, as well as the West Sussex coast. The inclusion of Croydon in the LEP establishes a link to the London economy, and an opportunity for increased business growth and the potential for collaboration between Coast to Capital and those in London. 1.10 The preparation of the City Plan has had regard to the duty to cooperate and the council will continue to engage constructively, actively and on an ongoing basis with neighbouring authorities and public bodies with regard to strategic planning matters. 7 Annexes 1.11 The City Plan Part 1 is accompanied by 3 annexes: Annexe 1 - Implementation and Monitoring – sets out the key monitoring indicators and targets and identifies how the City Plan will be implemented.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    202 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us