(Rs. in Cr.) S.No. Name of the Projects Implementing Agency Date Of

(Rs. in Cr.) S.No. Name of the Projects Implementing Agency Date Of

List of Ongoing Infrastructure projects with loan assistance from NCRPB (as on 30th June 2019) (Rs. in Cr.) Actual Loan Implementing Date of Estimated Loan Balance Loan S.No. Name of the Projects Amount released Agency sanction Cost Sanctioned to be released (till Jun-19) Haryana Sub Region Transport Sector project Construction of 2 lane ROB at Hodal Hassanpur road on PWD (B&R), Dec-12 24.10 13.76 1 10.88 2.88 Delhi Palwal Mathura Railway line at L/C No. 553 Haryana Two lane ROB at Sonepat Purkhas road near sugar mill PWD (B&R), Dec-12 40.37 16.42 2 13.21 3.21 on Delhi Ambala Railway line L/C No. 29 Haryana Construction of Road from NH-10 to NH-71 at southern PWD (B&R), Dec-13 / May- 27.66 20.75 3 16.30 4.45 Bye Pass in Rohtak district Haryana 15 Four lanning of Jhajjar Farukhnagar-Gurgaon road in PWD (B&R), Dec-13/Jan-16 115.11 86.33 4 59.53 26.80 Jhajjar/Gurgaon district Haryana Up gradation of 3 roads in Rewari Division (Haily mandi Dec-13 / May- 83.53 62.65 PWD (B&R), 5 to Pahlawas road, kosli-Guryani to Pahlawas NH-71 and 15 28.26 34.39 Haryana Dahina-Jatusana Road Construction of 4 lane ROB at Lakhanmajra Meham road 56.04 23.15 PWD (B&R), 6 at L/C 79 on Delhi Bhatinda Railway line in Rohtak Jan-16 9.26 13.89 Haryana District Construction of 2 lane ROB at L/C No. 54 on Jind 32.58 11.18 Panipat section (location 66/9-10) crossing road along PWD (B&R), 7 Jan-16 9.47 1.71 with Delhi water carrier link channel in Panipat district Haryana Construction of 2 lane ROB at LC No. 55 on Jind Panipat 29.46 11.29 PWD (B&R), 8 Section Location 67/10-11 over road on Panipat Kabri Jan-16 9.52 1.77 Haryana road in Panipat district Construction of additional 2 lane ROB at LC no. 3 on 74.67 56.00 PWD (B&R), 9 Hisar Sadalpur Railway line crossing old DHS at RD Jan-16 22.40 33.60 Haryana 164.60 at Dabra Chowk, Hisar Construction of Elevated Road on National Highway No 152.83 114.62 PWD (B&R), 10 10 from Chottu ram Chowk to Old bus stand (KM 74.00 Jan-16 45.85 68.77 Haryana to 75.86) in Rohtak city Portion” 2 Lane ROB at LC No. 564 of Mumbai Delhi Railway line Nov-17 47.78 23.41 PWD (B&R), 8.19 15.22 11 on Palwal Hassanpur (Rasulpur) Road in Palwal District Haryana 2 Lane ROB at LC No. 561 of Mumbai Delhi Railway line Nov-17 48.88 22.06 PWD (B&R), 7.72 14.34 12 on Palwal Bamni Khera Hassanpur Road in Palwal Haryana District Upgradation of existing Sonepat-Rathdhana Narela road Nov-17 101.81 76.36 30.54 45.82 from Km 2.310 to 14.800 in Sonepat District (from ITI PWD (B&R), 13 Chowk to Safiabad village upto Sonepat District Haryana Boundary), Sonipat Construction of link road from Rewari-Narnaul road to Nov-17 176.00 132.00 52.80 79.20 Rewari Jhajjar via Rewari Dadri road and Rewari PWD (B&R), 14 Mohindergarh Road including 3 no. ROBs (Proposed Haryana Bye-pass), Rewari Construction of 2 lane Relief Road from Ghogripur to Jun-19 200.00 150.00 150.00 Haryana-Delhi Border near Hareveli Village along the PWD (B&R), 15 banks of Westrern Yamuna Canal (WYC) falling in Haryana Sonipat District 1210.82 819.98 323.93 496.05 Sewerage Sector Projects Providing sewerage facilities in village kosli, Bhakli and 16 PHED Haryana Oct-07 8.70 6.53 5.22 1.31 Railway station area of Kosli, Dist. Rewari Providing renovation of existing 7 MLD STP based on Nov-17 5.64 4.08 17 MBBR technology followed by tertiary treatment and PHED Haryana 1.23 2.86 chlorination, Ganaur town in Sonipat district Providing renovation of existing 4.5 MLD STP based on Nov-17 4.54 3.26 18 MBBR technology followed by tertiary treatment and PHED Haryana 0.98 2.28 chlorination, Kharkhoda town in Sonipat district Upgradation and renovation of existing 5 MLD STP Nov-17 7.14 5.19 19 based on MBBR technology followed by tertiary PHED Haryana 1.56 3.63 treatment in Samalkha town in Panipat district Upgradation of existing 5.5 MLD STP & 5 MLD STP Nov-17 11.00 7.91 (MBBR technology) followed by tertiary treatment 20 &chlorination at Kosli Road &Sampla road respectively PHED Haryana 2.37 5.53 alongwith some balance pipeline laying, Jhajjar town Sewerage network in left out colonies & newly approved Nov-17 4.66 3.50 21 colonies and tapping of drains to implement NGT PHED Haryana 1.05 2.45 guidelines in Hodal town in Palwal district Sewerage scheme in left out areas & recently approved Nov-17 8.26 6.19 colonies in Kalanaur town and renovation of the existing 22 3.5 MLD STP based on MBBR technology followed by PHED Haryana 1.86 4.33 tertiary treatment and chlorination, Kalanur town in Rohtak district Sewerage scheme in left out areas & recently approved Nov-17 7.93 5.95 colonies in Sampla town and upgradation & renovation of 23 the existing 4 MLD STP based on MBBR technology PHED Haryana 1.78 4.16 followed by tertiary treatment in Sampla town in Rohtak district Actual Loan Implementing Date of Estimated Loan Balance Loan S.No. Name of the Projects Amount released Agency sanction Cost Sanctioned to be released (till Jun-19) Modification of existing STP with Tertiary Treatment, Nov-17 13.66 10.24 Effluent Disposal from STP Sohna to Nuh Drain and 24 PHED Haryana 3.07 7.17 Laying of Sewerage System for Balance approved colonies as well as taping of drains of Sohna town Providing sewerage system in left out approved colonies Nov-17 9.28 6.96 of Beri town and construction of 2.6 MLD STP based on SBR technology followed by chlorination in place of 25 PHED Haryana 2.09 4.87 existing 2 MLD STP based on water stabilization pond complete in all respect at Beri in Jhajjar district 80.80 59.80 21.20 38.60 Water Sector Projects Water Supply scheme for Nalhar Medical College and Aug-11/May- 150.00 26 PHED Haryana 112.50 90.13 22.37 Nuh Town 15 Augmentation of Water Supply for Pataudi and adjoining 41.15 30.86 Nov-11/May- 27 town of Haily Mandi along with surrrounding seven PHED Haryana 23.88 6.98 15 villages. Augmentation of Water Supply for Farrukh Nagar Town Nov-11/May- 13.90 10.43 28 PHED Haryana 6.78 3.65 & Five Villages, Gurgaon District. 15 205.05 153.79 120.79 33.00 Power Sector Projects 29 Strengthening of Sub-transmission& distribution network UHBVN Nov-17 19.74 5.93 including metering in Jhajjar, Rohtak, Panipat&Sonipat 4.15 1.78 Circles of Haryana (under IPDS) by UHBVN 19.74 5.93 4.15 1.78 Haryana Sub Total 1516.41 1039.50 470.07 569.43 Uttar Pradesh Sub Region Transport Sector project 30 Project of Metro connection between Noida and Greater NMRC Jan-16 5503 1587.00 1130.00 457.00 Noida (29.707 km) 31 Development of Six lane Elevated Road (Hindon) in GDA Jan-16 1147.60 700.00 630.00 70.00 Ghaziabad, Uttar Pradesh by GDA 6650.60 2287.00 1760.00 527.00 Water Sector project 0.00 32 Raw Water Conveyance Main from Intake at Dehra 183.19 137.39 (Ghaziabad) to WTP site at Palla (Greater Noida) Clear GNIDA Aug-13 83.00 54.39 Water Main from WTP site to Master Reservoir 33 Primary Treatment Works at Dehra (Ghaziabad), 210 121.48 87.16 MLD Water Treatment Plant at Palla (Greater Noida) and GNIDA Aug-13 87.16 0.00 Allied Works 304.67 224.55 170.16 54.39 Sewerage Sector project 34 Construction of 20 MLD Sewage Treatment Plant and 28.15 GNIDA Aug-13 21.10 17.70 3.40 Pumping Station at Ecotech-III, Greater Noida 35 Construction of 15 MLD Sewage Treatment Plant and 21.17 GNIDA Aug-13 15.87 14.36 1.51 Pumping Station at Ecotech-II, Greater Noida 49.32 36.97 32.06 4.91 UP Sub Total 7004.59 2548.52 1962.22 586.30 Rajasthan Sub Region Water Sector PHED Rajasthan Aug/Oct 2013 36 Alwar Water Supply Upgradation Project 174.86 131.14 94.72 36.42 37 Tijara Water Supply Upgradation Project PHED Rajasthan Aug/Oct 2013 16.46 12.35 9.19 3.16 38 Rajgarh Water Supply Upgradation Project PHED Rajasthan Aug/Oct 2013 20.24 15.18 10.96 4.22 39 Behror Water Supply Upgradation Project PHED Rajasthan Aug/Oct 2013 26.02 19.51 14.49 5.02 40 Bhiwadi Water Supply Improvement Project PHED Rajasthan Aug/Oct 2013 40.69 30.52 30.52 0.00 Reorganization of Urban Water Supply Scheme PHED Rajasthan Nov-17 36.26 27.19 41 14.00 13.19 Khairthal, Alwar District from PHED, Rajasthan Reorganization of Urban Water Supply Scheme PHED Rajasthan Nov-17 21.0551 15.78 42 Kishangarh Bas, Alwar District from PHED, Rajasthan 7.00 8.78 335.59 251.67 180.88 70.79 Transport Sector Upgradation Strengthening & Development work on PWD, Rajasthan Nov-17 22.78 17.08 5.12 11.96 Barod to Shahjhanpur Road C.C.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us