DKASC Array Cleaning

DKASC Array Cleaning

1st Clean 2nd Clean (where required) SITE # Technology Date Time Date Time 1A Large Scale Trackers, DEGERenergie Thursday 21/11/2019 5.55am - 6.15am 1B Large Scale Trackers, DEGERenergie Thursday 21/11/2019 5.55am - 6.15am 2 Large Scale Tracking, ADES Not cleaned -in stall mode 3 Roof Mounted Polycrystalline, BP Solar Monday 18/11/2019 9.10am - 9.45am 4 Solar Forest Hydraulic Trackers, Kyocera Monday 18/11/2019 6.45am - 7.15am 5 Solar Forest 1 Axis Trackers, Kyocera Sunday 17/11/2019 6.55pm - 7.15pm Monday 18/11/2019 5.40am - 6.25am 6 Solar Forest 2 Axis Trackers, Kyocera Sunday 17/11/2019 6.55pm - 7.15pm Monday 18/11/2019 5.40am - 6.25am 7 CdTe Thin Film, First Solar Sunday 17/11/2019 6.10pm - 6.55pm 8 Amorphous Silicon, Kaneka Sunday 17/11/2019 8.25am - 9.30am Sunday 17/11/2019 5.50pm - 6.10pm 9A CIGS Thin Film, Solibro Hanergy Sunday 17/11/2019 7.05am - 7.35am 9B TBD (has old CIGS Thin Film modules) Sunday 17/11/2019 7.45am - 8.05am 10 Monocrystalline Silicon, SunPower (215W) Sunday 17/11/2019 8.10am - 8.25am 11 Polycrystalline Silicon, BP Solar Sunday 17/11/2019 5.30pm - 5.50pm 12 Monocrystalline Silicon, BP Solar Sunday 17/11/2019 6.10am - 7.00am 13 Monocrystalline Silicon, Trina Saturday 16/11/2019 6.10pm - 6.35pm 14 Polycrystalline Silicon, Kyocera Saturday 16/11/2019 5.15pm - 6.05pm 15 Solar Water System, Trunz Saturday 16/11/2019 6.05pm - 6.10pm 16 Solar Compass, BP Solar Thursday 21/11/2019 6.40pm - 7.15pm 17 HIT Hybrid Silicon, Sanyo Monday 18/11/2019 7.15am - 7.45am 18 Monocrystalline Silicon, SunPower (238W) Monday 18/11/2019 7.50am - 8.15am 19 Monocrystalline Silicon, Sungrid Monday 18/11/2019 6.45am - 7.15am 20 Polycrystalline Silicon, Sungrid Monday 18/11/2019 8.15am - 8.45am 21 Polycrystalline Silicon, Evergreen Solar Monday 18/11/2019 8.45am - 9.05am 22 Concentrated Photovoltaics, SolFocus Wednesday 20/11/2019 5.35am - 5.50am 23 CdTe Thin Film, Calyxo Tuesday 19/11/2019 9.05am - 9.40am 24 Polycrystalline Si, Hanwha Q-Cells Tuesday 19/11/2019 9.50am - 10.15am 25 Polycrystalline Si, Hanwha Solar Tuesday 19/11/2019 2.00pm - 2.30pm 26 Polycrystalline Si, Hanwha Q-Cells Tuesday 19/11/2019 2.30pm - 2.55pm 27 CIGS Thin Film, Solibro Tuesday 19/11/2019 5.55pm - 6.30pm 28 CdTe Thin Film, First Solar Thursday 21/11/2019 8.00am - 8.45am 29 Polycrystalline Si, China Sunergy Wednesday 20/11/2019 8.05am - 8.45am 30 Polycrystalline Si, Hanwha Q Cells Wednesday 20/11/2019 5.25pm - 5.55pm 31 Monocrystalline Si, TDG Wednesday 20/11/2019 5.55pm - 6.20pm 32 Polycrystalline Si, Canadian Solar Wednesday 20/11/2019 5.55pm - 6.20pm 33 Polycrystalline Si, REC Thursday 21/11/2019 8.50am - 9.10am 34 Polycrystalline Si, Winaico Thursday 21/11/2019 7.20pm - 7.40pm 35 Polycrystalline Silicon, Elkem Wednesday 20/11/2019 7.15pm - 7.40pm 36 Polycrystalline Si, Novopolymers Wednesday 20/11/2019 6.20pm - 6.45pm 37 Polycrystalline Si, Tindo Wednesday 20/11/2019 11.25am - 12.00pm 38 Monocrystalline Si, Hanwha Q-Cells Wednesday 20/11/2020 6.15am - 6.45am 39 TBD TEL Solar 1 TEL Solar Test System - 1 Bosch Thursday 21/11/2019 6.35am - 7.00am Thursday 21/11/2019 7.25am - 7.50am TEL Solar 2 TEL Solar Test System - 2 Oerlikon Thursday 21/11/2019 6.35am - 7.00am Thursday 21/11/2019 7.25am - 7.50am.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us