Roads Reconstruction Project M-2 Tivat-Jaz Road Section Stakeholder

Roads Reconstruction Project M-2 Tivat-Jaz Road Section Stakeholder

Montenegro: Main Roads Reconstruction Project M -2 Tivat-Jaz Road Section Stakeholder Engagement Plan Prepared for: European Bank of Reconstruction and Development July 2020 Tranche 3 ESIA Disclosure Package / Stakeholder Engagement Plan Table of Contents 1 Introduction........................................................................................................................... 1 1.1 Background ........................................................................................................................... 1 1.2 SEP Objectives ...................................................................................................................... 1 1.3 SEP Scope ............................................................................................................................. 2 2 Project Description ................................................................................................................ 3 3 Legal and Policy Framework for Stakeholder Engagement ................................................... 5 3.1 National regulatory requirements ......................................................................................... 5 3.2 International standards and commitments ............................................................................ 8 3.2.1 EBRD PR10 ............................................................................................................................ 8 4 Stakeholder Identification and Analysis ............................................................................... 10 4.1 Introduction......................................................................................................................... 10 4.2 Stakeholder Identification and Analysis ............................................................................... 10 5 Summary of Stakeholder Engagement Activities .................................................................15 5.1 Introduction..........................................................................................................................15 5.2 Engagement methods and implementation .........................................................................15 5.3 Stakeholder Engagement to Date ....................................................................................... 16 5.4 Outcomes of engagement ................................................................................................... 22 5.5 Future Engagement ............................................................................................................. 24 5.5.1 Environmental and Social Impact Assessment (ESIA) Disclosure ......................................... 30 5.5.2 Responsibilities for Engagement ......................................................................................... 30 5.5.3 Construction Phase Engagement ........................................................................................ 30 5.5.4 Operation Phase Engagement.............................................................................................. 31 6 Grievance Response Mechanism ......................................................................................... 32 6.1 Introduction......................................................................................................................... 32 6.2 Grievance process ............................................................................................................... 32 7 Monitoring and Reporting .................................................................................................... 33 7.1 Introduction.......................................................................................................................... 33 7.2 Monitoring and Reporting .................................................................................................... 33 8 Contact Details .................................................................................................................... 34 July 2020 Page i Tranche 3 ESIA Disclosure Package / Stakeholder Engagement Plan List of Figures Figure 1: Route of the Proposed Project ............................................................................................ 4 Figure 2: EIA Procedure in Montenegro ............................................................................................ 7 List of Tables Table 1: Construction Phasing Schedule ........................................................................................... 3 Table 2: List of identified stakeholder groups .................................................................................. 11 Table 3: Engagement Methods Used ...............................................................................................15 Table 4: Stakeholder Engagement to Date ..................................................................................... 18 Table 5: Issues raised and TA response ............................................................................................ 22 Table 6: Future engagement………………………… July 2020 Page ii Tranche 3 ESIA Disclosure Package / Stakeholder Engagement Plan List of Acronyms Acronym Explanation EBRD European Bank of Reconstruction and Development EIA Environmental Impact Assessment ESIA Environmental and Social Impact Assessment GRM Grievance Response Mechanism NEPA Nature and Environmental Protection Agency of Montenegro PAA Project Affected Area PAP Project Affected People / Parties PRs EBRD Performance Requirements REA Real Estate Administration of Montenegro SEP Stakeholder Engagement Plan SES Socio-Economic Survey TA Transport Administration of Montenegro July 2020 Page iii Tranche 3 ESIA Disclosure Package / Stakeholder Engagement Plan 1 Introduction 1.1 Background The European Bank of Reconstruction and Development (EBRD) is considering providing finance to the Transport Administration (TA) of Montenegro to finance the rehabilitation and upgrade, and works supervision, of a 16 km section of the M-2 road between Tivat and Jaz in the south west of the country (“the Project”). Given the scale and nature of the Project, EBRD has assigned the Project to Category A under its Environmental and Social Policy 2014. As such a comprehensive Environmental and Social Impact Assessment (ESIA) is required, followed by public disclosure of the ESIA for a minimum of 120 days. An Environmental Impact Assessment has already been undertaken in accordance with Montenegrin law and guidance (the “national EIA”) and submitted to the Montenegrin Nature and Environmental Protection Agency (NEPA). The national EIA was subject to public disclosure and consultation in December 2019, NEPA Commission’s first review in early 2020, and subsequent clarifications by the TA. Following a final review NEPA awarded the ecological permit (a precondition for the construction permit) in April 2020. This SEP describes the engagement activities being undertaken for the Project during planning, construction and operation. It has been prepared alongside the ESIA documentation prepared for the purposes of the Project. Stakeholder engagement refers to a process of sharing information and knowledge, seeking to understand the concerns of others, and building relationships based on trust and collaboration. It is essential for the successful implementation of the ESIA and the Project itself. This SEP is designed to meet both Montenegrin national legislative requirements and the EBRD’s Performance Requirements (PRs), specifically PR10: Information Disclosure and Stakeholder Engagement (see Section 3). 1.2 SEP Objectives This SEP has been developed to provide a robust framework for stakeholder engagement throughout the life of the Project that is effective, meaningful, consistent, comprehensive, coordinated and culturally appropriate. Stakeholder engagement is an ongoing process and this SEP will continue to be updated and adjusted as the Project progresses. Through the implementation of a well-planned stakeholder engagement process, the Project aims to: • generate a good understanding of the Project amongst stakeholders; • ensure timely information disclosure and engagement opportunities on an ongoing basis, including for those who may be more sensitive to Project impacts; • engage with stakeholders regarding the Project’s environmental and social risks and impacts; and the proposed measures to mitigate and manage them; • manage expectations about the Project; July 2020 Page 1 Tranche 3 ESIA Disclosure Package / Stakeholder Engagement Plan • discuss the grievance process for the Project, identifying the most appropriate mechanisms and providing feedback on issues raised; • monitor stakeholder engagement activities, responding to feedback and comments; and • create positive relationships with Project stakeholders. COVID-19 Restrictions on Stakeholder Engagement Restrictions associated with COVID-19 in Montenegro, including social distancing measures, may rule out some traditional stakeholder engagement and consultation approaches, which may exclude some stakeholders such as vulnerable people and/or those without internet and mobile phones. The TA is taking protective measures concerning COVID-19, and as the pandemic evolves is seeking advice from local and international health authorities while implementing stakeholder engagement and consultations required by national laws and EBRD. Relevant sections of this document (namely 5.5 Future Engagement) present alternative engagement measures accounting

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    39 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us