It's Getting Serious Presentation to Mine Africa December 2011 Rupert

It's Getting Serious Presentation to Mine Africa December 2011 Rupert

Power – it’s getting serious Presentation to Mine Africa December 2011 Rupert Soames, Chief Executive, Aggreko plc | 2 Why listen to Aggreko? • One of the world’s largest providers of generation capacity in developing economies • Over the last five years – > 1,000 MW of additional capacity brought on-line in Africa – > 1,000 MW of additional capacity brought on-line in Asia – > 800 MW of additional capacity brought on-line in Latin America • >$600m of new fleet investment in 2011 alone • Currently delivering large scale power in 50 countries • World-wide power fleet of around 8,000 MW • One of the largest sponsors of research into power supply & demand in emerging countries | 3 Aggreko in mining • Temporary power and temperature control • Some key customers: – BHP – Chile, W A – Vale – Mozambique and Brazil – Barrick – Africa & Carribean – Bisha – Eriteria – Ivanhoe – Mongolia – Rio Tinto – Australia – Xtrata - Australia – Anglo American – Australia & South Africa • Typical applications of temporary power and temperature control – Project acceleration: guaranteeing power before permanent generation is available – Managing through temporary interruptions – Managing volatility in demand Mine cooling, South Africa| 4 Mine power, Mongolia | 5 Mine power, Australia | 6 | 7 Grid Power: 100 MW at Embakasi, Kenya | 8 Grid Power: 30 MW Gas at Batam, Indonesia Volatility is a fact of life: copper 2004 - 2011 | 9 Volatility is a fact of life: nickel 2004 - 2011 | 10 | 11 THE WORLD HAS A PROBLEM | 12 Demand for power growing fast Rolling 3-average Growth in Electricity Consumption 1988-2008 9.0% 8.0% 7.0% 6.0% 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 World OECD Non-OECD Source: IEA | 13 Investment is not enough to meet new demand and ageing plant MW Installed 1979-2009 vs Plant >40 years old 600,000 500,000 400,000 300,000 200,000 100,000 - 1981 1979 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 World Installed by Year Plant >40 years excl China Installed excl China Source: Platts | 14 25% of World’s Generating Capacity >40 years old by 2015 Capacity Worldwide >40 years old 1,200,000 1,000,000 800,000 N AMERICA MIDEAST LATIN AMERICA EUROPE 600,000 Mw CIS CHINA ASIA 400,000 ANZ-OCEANIA AFRICA 200,000 - 2000 2005 2010 2015 Source: Platts | 15 Case Study: Sub-Saharan Africa • Demand continues to grow – Annual average consumption growth 2000 – 2006: 5-7% source: EIA / World Bank • Supply is growing far more slowly – Annual average capacity growth 2000 – 2006: 2% source: EIA • African manufacturing enterprises report power outages on an average of 56 days a year source: World Bank • Lack of power the single greatest source of lost productivity in African business source: World Bank | 16 Case Study: Sub-Saharan Africa • Existing infrastructure deteriorating rapidly – >25% of SSA’s plant is not currently in operating condition source: World Bank – Amount of installed plant >40 years old will increase by 70% in next 6 years source: Platts • Transmission & Distribution as much a problem as generation – Average age of transmission infrastructure in SSA ~44 years, some >60 years source: World Bank – Example: new 100 MW gas plant operating at approximately 50% capacity due to transmission constraints source: Orca Energy – Example: new 500 MW hydro plant delivering <50% of plan to capital city due to transmission constraints | 17 $158bn required – at current access rates World Bank Africa Infrastructure Country Diagnostic (AICD) MW 2005 MW Refurb MW new MW 2015 Cost $bn Reported Financing SAPP 17,136 28,029 31,297 76,462 $ 64 $ 2 3% EAPP 22,132 1,369 23,045 46,546 $ 40 $ 6 15% WAPP 4,096 5,530 15,979 25,605 $ 47 $ 2 4% CAPP 260 906 3,856 5,022 $ 7 $ 1 14% Total 43,624 35,834 74,177 153,635 $ 158 $ 11 7% Scenario: current rates of access + population growth + historic consumption growth Output: $158bn of investment required over 10 years 2005-2015 Source World Bank, Africa Energy | 18 Case Study: UK - $300bn required over next 10 years • ~ 25% of current capacity coming out of service in next 10 years • Demand likely to increase by 50% by 2050 • Renewables need to increase from 7% of capacity to 30% by 2020 • Estimated gross impact of climate change policies on UK Electricity Bills – Consumer: 33% – Business: 43% Source: DECC, OFGEM | 19 International Capital Markets will set the rules • Poor countries cannot rely on Global Institutions to finance their power infrastructure. They don’t have enough money. – World Bank funding capacity ~ $2bn; Africa needs ~$158 bn • Governments and Utilities don’t have enough money • New and replacement generation capacity will need to be financed by international capital markets • Capital markets have enormous choice as to where to invest – Hugely sensitive to project and country risk • Risk aversion and past history of poor returns mean that many resource-rich countries will not be able to access international capital markets for long-term infrastructure finance | 20 Consequences for the Mining Sector • Grid power in many developing markets is going to become increasingly unreliable as demand exceeds supply • In conflict between giving energy to people and energy to corporates, people power will increasingly win – Miners will have to self-provide • Volatility of metals & minerals prices will not reduce • Power requirements need to be given careful thought – How fast can it be mobilised – How much do we need permanently, and how much peaking? .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us