Greening of MPSEZ, Naidupeta- Revised Master Plan

Greening of MPSEZ, Naidupeta- Revised Master Plan

Implemented by Greening of MPSEZ, Naidupeta Revised Master Plan 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Context of site Source: Landsat 2014, Google Earth Site Boundary Human Settlements 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Salient features of site: ▪ Total area of site 1114 ha ~ 11.14 sq.km. (as per drawing) ▪ Nearest Highway- ‘NH5’ , 9 km E connecting Nellore with Sulurpet ▪ Nearest Railway station - Naidupet -8 km E ▪ Nearest Airport - Rengunta Airport- 44 km SW ▪ Chennai at distance of 85 km, Nellore at distance of 65 km Rainfall Wind ▪ Predominant rainy season June to ▪ Predominant wind direction from September North East ▪ Annual total rainfall - 1022.3 mm ▪ Average wind speed – 5.15 m/sec ▪ Number of annual rainy days -46.4 ▪ Rainfall in Nellore occurs between the months of October and December. 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Cyclone Hazard map of State District/ Town Site Very High Damage Risk zone – C (50m/s) Moderate Damage Risk zone – A (44m/s) Moderate Damage Risk zone – B (38m/s) Low Damage Risk zone – B (33m/s) Probable Max. Surge Height (m) S.C.S SevereProbable Cyclonic Max. Wind StormSpeed (m/s) only C.S Cyclonic Storm Crossing 1st Latitude R.F.= H Risk factor = High R.F.= L Risk factor = Low Source: http://disastermanagement.ap.gov.in/website/cyclone.htm 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Seismic Hazard map of State Source: http://asc- india.org/maps/hazard/haz-andhra- pradesh.htm 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Contours of site 130 100 134 102 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Previous Master plan of site Allotted plot 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Type of industries / sectors proposed in MPSEZ Contd. 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Source: Draft Environmental Impact Assessment Report for the proposed Multiproduct SEZ Nellore 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Special Economic Zone – Physical concept Source: http://www.ilfsindia.com/sez_mumbai.pdf 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Minimum land requirement Source: http://www.ilfsindia.com/sez_mumbai.pdf 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Area distribution 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Road network Concept 45 M Primary Collector road 36 M Distributor road Source: http://en.wikipedia.org/wiki/Fused_Grid 24 M Access road 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Circulation plan 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Green network concept ▪ Provision of buffer along Processing zone boundary ▪ Creation of visual axis with Hillock as a node ▪ Lateral connections as a route to central recreation zone 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Parks and open spaces 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Roads and greens integration 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Scenic integration and art 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Implemented by Zoning Concept ▪ Hillock as a central facility/ recreation node ▪ Centrally located Chemical industry ▪ Orange industry towards boundary ▪ Green industries towards Southern edge near Mamdikalava drain ▪ Common facility near entrance 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 04/05/2017 Training Programme for WBIDC, Dec. 15-17, 2015 Fire station, Implemented by Police Check Post Parking, Automobile service station, Weight bridge, Petrol Pump, Dormitory and other Entry/Exit point, Customs Residential Zone Zone level Parking Renewable energy and Canteen, WareHouses other Public Toilets, Health Care, Sports, Green Belt/ Services Buffer Zone CETP After Revision 04/05/2017 OrientationTraining Programme programme for WBIDC,for APIIC, Dec. May 15- 17,4-6, 2015 2015 Implemented by As a federal enterprise, GIZ supports the German Government in Responsible achieving its objectives in the field of international cooperation for N. Raghu Babu sustainable development. Author(s) Published by N.Raghu Babu, Anshika Gupta Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Photo credits Registered offices, Bonn and Eschborn, Germany © GIZ Sustainable and Environment-Friendly Industrial Production Project Layout GIZ Corporate Design Centre Indo- German Environment Partnership Programme for Urban and Industrial Development 1st Floor, B 5/1, Safdarjung Enclave New Delhi 110029 T +91 11 49 49 53 53 F +49 11 49 49 53 51 E [email protected] I www.giz.de, www.igep.in 04/05/2017.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us