Mekong River Commission P.O

Mekong River Commission P.O

Mekong River Commission P.O. Box 6101, 184 Fa Ngoum Road, Unit 18 Ban Sithane Neua, Sikhottabong District, Vientiane 01000, Lao PDR Telephone: (856-21) 263 263. Facsimile: (856-21) 263 264 The ISH 0306 Study Development of Guidelines for Hydropower Environmental Impact Mitigation and Risk Management in the Lower Mekong Mainstream and Tributaries Volume 4 – Final Case Study Report Mainstream Dams Assessment Including Alternative Scheme Layouts March 2018 The Final Reports constitutes six volumes: Volume 1: Version 3.0 – Hydropower Risks and Impact Mitigation Guidelines and Recommendations Volume 2: Version 3.0 – Hydropower Risks and Impact Mitigation MANUAL – Key Hydropower Risks, Impacts and Vulnerabilities and General Mitigation Options for Lower Mekong Volume 3: Version 2.0 – Final Knowledge Base and Supporting Documents Volume 4: Version 2.0 – Final Case Study Report – Mainstream Dams Assessment Including Alternative Scheme Layouts Volume 5: ISH0306 Proposed Update of the Preliminary Design Guidance (PDG) and Hydropower Development Strategy Volume 6: Final Closure Report TABLE OF CONTENTS Abbreviations ...................................................................................................................................................... 8 Executive Summary ........................................................................................................................................... 10 1 Introduction ............................................................................................................................................. 33 1.1 Overview.......................................................................................................................................... 33 1.2 Specific Objective of the Case Study ................................................................................................. 33 1.3 Specific Case Study Activities, Outputs and Deliverables .................................................................. 35 1.3.1 2nd Interim Phase ......................................................................................................................... 35 2 1.3.2 Final Phase ................................................................................................................................... 37 2 Case Study ................................................................................................................................................ 39 2.1 The Context of the Study Base Case ................................................................................................. 39 2.1.1 The Historic Conditions and Basin Scale Management ................................................................. 40 2.1.2 The BDP 2030 Scenario and Council Study 2040 Scenario ............................................................ 40 2.1.3 Development of the Base Case for Assessment of Mitigation Effectiveness ................................. 41 2.2 Description of the Mainstream Dams ............................................................................................... 44 2.2.1 The Lao Cascade .......................................................................................................................... 44 2.2.2 The Mainstream Dams below Pakse ............................................................................................ 47 2.3 Description of Risks .......................................................................................................................... 49 2.3.1 Hydrology and Flow ..................................................................................................................... 49 2.3.2 Sediments and Geomorphology ................................................................................................... 50 2.3.3 Water Quality .............................................................................................................................. 51 2.3.4 Fisheries and Aquatic Ecology ...................................................................................................... 52 2.4 Description of Mitigation Options .................................................................................................... 56 2.4.1 2nd Interim Phase Mitigation Options ........................................................................................... 56 2.4.2 Final Phase Mitigation Options .................................................................................................... 62 2.5 Description of Scenarios ................................................................................................................... 66 2.5.1 2nd Interim Phase – Northern Lao PDR Cascade ............................................................................ 66 2.5.2 Final Phase – Council Study Hydropower Sub-Scenarios .............................................................. 72 3 Methods to Assess Mitigation and Economics .......................................................................................... 74 3.1 General Overview ............................................................................................................................ 74 3.1.1 Multicriteria Assessment and Indicator Framework – 2nd Interim Phase – Northern Lao Cascade 74 3.1.2 Phase 4 Multicriteria Assessment Approach: Lower Mekong Dams.............................................. 76 3.1.3 Hydropower Design Criteria of Lao Cascade and Downstream Dams ........................................... 77 3.1.4 Criteria for Different Modes of Hydropower Operation ............................................................... 82 3.2 Sites for criteria assessment ............................................................................................................. 84 3.2.1 2nd Interim Phase – Northern Lao PDR Cascade ............................................................................ 84 3.2.2 Final Phase – Lower Mekong Dams .............................................................................................. 85 3.3 Methods to Assess Hydrologic and Flow Changes ............................................................................ 86 3.3.1 2nd Interim Phase – Northern Lao PDR Cascade ............................................................................ 86 3.3.2 Final Phase ................................................................................................................................... 92 3.4 Methods to Assess Sediment Impact Mitigation ............................................................................... 95 3.4.1 2nd Interim Phase – Northern Lao PDR Cascade ............................................................................ 95 3.4.2 Final Phase ................................................................................................................................... 98 3.5 Methods to Assess Water Quality Impact Mitigation........................................................................ 99 3.5.1 2nd Interim Phase ......................................................................................................................... 99 3 3.5.2 Final Phase ................................................................................................................................. 100 3.6 Methods to Assess Fisheries and Aquatic Ecology Impact Mitigation ............................................. 101 3.6.1 2nd Interim Phase – Northern Lao PDR Cascade .......................................................................... 101 3.6.2 Final Phase ................................................................................................................................. 118 3.7 Economic Evaluation ...................................................................................................................... 121 3.7.1 Valuation of Sediment Trapped/Flushed .................................................................................... 121 3.7.2 Valuation of Fisheries ................................................................................................................ 121 3.7.3 Valuation of energy loss ............................................................................................................. 122 4 Description of Modelling System and Approach ..................................................................................... 125 4.1 Description of Mekong system to be modelled .............................................................................. 125 4.1.1 Geographical subdivision ........................................................................................................... 125 4.1.2 Dominant processes to be modelled .......................................................................................... 127 4.2 Modelling approaches for specific processes and functions ........................................................... 127 4.2.1 MRC Decision Support Framework (DSF) ................................................................................... 127 4.2.2 Rainfall-runoff in the tributaries and the UMB (Chinese dams) .................................................. 128 4.2.3 Sediment input from the various tributaries .............................................................................. 129 4.2.4 Reservoir cascade modelling ...................................................................................................... 129 4.2.5 Flow routing through the main channels

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    370 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us