SHEFFIELD CITY COUNCIL Development, Environment and Leisure Directorate REPORT TO WEST AND NORTH DATE 15/01/2008 PLANNING AND HIGHWAYS AREA BOARD REPORT OF DIRECTOR OF DEVELOPMENT SERVICES ITEM SUBJECT APPLICATIONS UNDER VARIOUS ACTS/REGULATIONS SUMMARY RECOMMENDATIONS SEE RECOMMENDATIONS HEREIN THE BACKGROUND PAPERS ARE IN THE FILES IN RESPECT OF THE PLANNING APPLICATIONS NUMBERED. FINANCIAL IMPLICATIONS N/A PARAGRAPHS CLEARED BY BACKGROUND PAPERS CONTACT POINT FOR ACCESS Vernon Faulkner TEL NO: 0114 2734183 AREA(S) AFFECTED CATEGORY OF REPORT OPEN 2 Application No. Location Page No. 07/04384/FUL L Furness & Sons 6 Thompson Hill High Green Sheffield S35 4JS 07/04357/FUL 222-224 Middlewood Road 16 Sheffield S6 1TE 07/04260/FUL Thorn View 23 New Mill Bank Bolsterstone Sheffield S36 3ZG 07/04200/OUT Land Adjacent 227 32 Southey Green Road Sheffield 07/04191/FUL 604 Stannington Road 37 Stannington Sheffield S6 6AE 07/04145/OUT Land To The Rear Of 425 To 443 45 Manchester Road Stocksbridge Sheffield S36 1DJ 07/03368/OUT 182 School Road 52 Sheffield S10 1GL 07/03345/OUT Land Between 37 And 43 57 Storrs Hall Road Sheffield S6 5AW 3 07/03298/FUL New Hall Farm 62 New Hall Lane Stocksbridge Sheffield S36 4GH 07/03176/FUL Site Of Former Grenoside Primary School 70 Norfolk Hill Grenoside Sheffield S35 8QB 07/02409/FUL Land Opposite 3 To 7 84 Staindrop View Chapeltown Sheffield S35 2YS 07/00268/CHU 162 Infirmary Road 91 Sheffield S6 3DH 4 5 SHEFFIELD CITY COUNCIL Report Of The Direction of Development Services, Development, Environment And Leisure To The NORTH & WEST Planning And Highways Area Board Date Of Meeting: 15/01/2008 LIST OF PLANNING APPLICATIONS FOR DECISION OR INFORMATION *NOTE* Under the heading “Representations” a Brief Summary of Representations received up to a week before the Area Board date is given (later representations will be reported verbally). The main points only are given for ease of reference. The full letters are on the application file, which is available to members and the public and will be at the meeting. Case Number 07/04384/FUL Application Type A Full Planning Application Proposal Erection of 18 dwellinghouses and 4 apartments and laying out of associated access - resubmission of planning permission Location L Furness & Sons Thompson Hill High Green Sheffield S35 4JS Date Received 09/11/2007 Team NORTH & WEST Applicant/Agent Elite Homes (Yorkshire) Ltd Recommendation Grant Conditionally subject to Legal Agreement Subject to: 1 The development shall be begun not later than the expiration of three years from the date of this decision. In order to comply with the requirements of the Town and Country Planning Act. 2 Before any work on site is commenced, a comprehensive and detailed hard and soft landscape scheme for the site shall have been submitted to and approved by the Local Planning Authority. The landscape works shall be implemented prior to the development being brought into use or within an 6 alternative timescale to be first agreed in writing with the Local Planning Authority Thereafter the landscaped areas shall be retained and they shall be cultivated and maintained for a period of 5 years from the date of implementation and any plant failures within that five year period shall be replaced unless otherwise agreed by the Local Planning Authority In the interests of the amenities of the locality. 3 The soft landscaped areas shall be managed and maintained for a period of 5 years from the date of implementation and any plant failures within that period shall be replaced to the satisfaction of the Local Planning Authority. In the interests of the amenities of the locality. 4 Before the development is commenced a Phase 1 and 2 Risk Assessment, to characterise the contamination on site and propose a remediation scheme to ensure safe redevelopment, shall have been submitted to and approved in writing by the Local Planning Authority. Should any previously unsuspected contamination be encountered during the development, the Local Planning Authority shall be notified within one working day of its discovery, together with any proposed amendments to the proposed remediation scheme. The development shall then be carried out in accordance with the approved scheme and the applicant shall provide written verification that the remediation has been completed as approved, within 21 days of the approved scheme being completed. In order to protect the health and safety of future occupiers and users of the site. 5 Before any work on site is commenced, a report shall have been submitted to and approved in writing by the Local Planning Authority identifying how the predicted energy needs of the development will be reduced by at least 10% through the use of on-site renewable energy equipment. Before any part of the development is occupied, the renewable energy equipment shall have been installed and thereafter retained and used. In order to ensure that new development makes energy savings in the interests of mitigating the effects of climate change. 6 Before the development is commenced, full construction details of the proposed access road and junction onto Thompson Hill (including cross- sections, long-sections, drainage details, proposed street lighting, 700mm margins, geometric standards, any accommodation works to the existing system of street lighting along Thompson Hill shall have been submitted to and approved in writing by the Local Planning Authority. The access road shall have been constructed in accordance with the approved details prior to the accommodation becoming occupied, and retained/maintained thereafter. In the interests of traffic safety and the amenities of the locality. 7 7 The gradients within the site shall not exceed 1 in 12, unless otherwise agreed in writing by the Local Planning Authority. To ensure safe and adequate vehicular and pedestrian access. 8 The development shall not be used unless 2.0 metres x 2.0 metres vehicle/pedestrian intervisibility splays have been provided on both sides of the means of access such that there is no obstruction to visibility greater than 600 mm above the level of the adjacent footway and such splays shall be retained thereafter. In the interests of traffic safety and the amenities of the locality. 9 The dwellings shall not become occupied unless the car parking accommodation has been provided, surfaced, sealed, drained, illuminated and formally marked out in accordance with the approved plan, to the satisfaction of the Local Planning Authority and thereafter retained for the sole purpose intended. In the interests of traffic safety and the amenities of the locality. 10 The development shall not be used unless all redundant accesses have been permanently stopped up and reinstated, and means of vehicular access shall be restricted solely to those access points indicated in the approved plans. In the interests of traffic safety and the amenities of the locality. 11 Before the development is commenced, details of the means of ingress and egress for vehicles engaged in the construction of the development shall have been submitted to and approved in writing by the Local Planning Authority. Such details shall include the arrangements for restricting the vehicles to the approved ingress and egress points. Ingress and egress for such vehicles shall be obtained only at the approved points. In the interests of traffic safety and the amenities of the locality. 12 At all times that construction works are being carried out equipment shall be provided to the satisfaction of the Local Planning Authority for the effective cleaning of the wheels and bodies of vehicles leaving the site so as to prevent the depositing of mud and waste on the highway but before the development is commenced full details of such equipment shall have been submitted to and approved by the Local Planning Authority. When the above-mentioned equipment has been provided thereafter such equipment shall be used for the sole purpose intended in all instances and be properly maintained. In the interests of the safety of road users. 8 13 Unless otherwise agreed in writing by the Local Planning Authority prior to the development becoming occupied, arrangements shall have been entered into securing the installation/improvement of bus stops/shelters in the immediate vicinity of the development, with raised footway and tactile paving to assist boarding/alighting. In the interests of delivering sustainable forms of transport, in accordance with the Transport Policies in the adopted Unitary Development Plan for Sheffield and PPG13. 14 Within 3 months of the development becoming occupied, the footway abutting the development site shall have been resurfaced to the satisfaction of the Local Planning Authority (owing to damage caused by trenches dug for connections to services, hoardings, provision of pedestrian paths to the new properties and construction plant) with new pin kerbs and full face kerbing provided if necessary. In the interests of pedestrian safety. Attention is drawn to the following justifications: 1. The decision to grant planning permission and impose any conditions has been taken having regard to the policies and proposals in the Sheffield Unitary Development Plan set out below, and to all relevant material considerations, including Supplementary Planning Guidance. H14 - Conditions on Development in Housing Areas This informative is intended as a summary of the reasons for grant of planning permission. Attention is drawn to the following directives: 1. It is noted that your planning application involves the construction or alteration of an access crossing to a highway maintained at public expense. This planning permission DOES NOT automatically permit the layout or construction of the access crossing in question, this being a matter which is covered by Section 184 of the Highways Act 1980, and dealt with by: Assistant Head of Highways Development Services Howden House 1 Union Street Sheffield S1 2SH For access crossing approval you should contact the Highway Development Control Section of Sheffield City Council on Sheffield (0114) 2736136, quoting your planning permission reference number.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    95 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us