EVERSENDAI ENGINEERING QATAR W.L.L Eversendai Introduction EVERSENDAI ENGINEERING QATAR W.L.L INTRODUCTION ¾ Over the past 30 years, EVERSENDAI has built an impressive track record, capable of boasting invaluable construction experience, by executing more than 100 different projects spanning over seven countries. ¾ The following is intended to acquaint you with EVERSENDAI's resources and capabilities to take part in the design, supply, fabrication, installation and painting of the structural steel works. ¾ Our development has been achieved by our commitment and dedication of the well- managed and resourceful team of professional engineers and managers. For each and every project that we undertake, we strongly emphasize on our strength in employing sound engineering practices, providing a systematic and organized approach in order to ensure client satisfaction. ¾ Being renowned as an IS0 9001:2008 certified company in Malaysia, Singapore, Dubai, Qatar, Sharjah & India. The Company's ultimate goal is to provide consistent quality performance. ¾ Our Design Department consists of qualified and experienced engineers equipped with Staad Pro, AutoCAD, X-Steel and BOCAD design and detailing software packages. ¾ The fundamental precepts incorporated into our basic management philosophy are: 1. Adherence to safety 2. Adherence to Quality 3. Adherence to Time Schedule 4. Client Satisfaction ¾ EVERSENDAI is well-known to be the structural steel fabrication and erection specialist. To date, the Group owns Five structural fabrication workshops, x Rawang, Malaysia – With annual fabrication capacity of 24,000 Tonnes. x Al Quasis Industrial, Dubai - With annual fabrication capacity of 18,000 Tonnes. x Hamriyah Free Zone, Sharjah - With annual fabrication capacity of 53,000 Tonnes. EVERSENDAI ENGINEERING QATAR W.L.L INTRODUCTION x Industrial Area, Doha, Qatar - With annual fabrication capacity of 24,000 Tonnes. x Trichy , India - With annual fabrication capacity of 24,000 Tonnes. x Ras Al Khaimah – FZE – UAE (Under Construction) ¾ EVERSENDAI is further expanding to CIS Countries in Oil and Gas / Petro Chemical & Plant Construction. Eversendai also occupied 200,000 SQ.M area with 550 Meters water front facility in Ras al Khaimah - UAE in order to Develop the new ventures. ¾ We were actively involved with, and have successfully executed an extensive number of high profile projects through out the Middle East and South East Asia. Multifarious projects such as High Rise buildings, Industrial and Infrastructure projects, as well as special ‘one -off ‘ Structures. Our primary aim is to support the construction industry through the execution of complex steel structures, undertaking the engineering, fabrication and installation works ¾ Our production facility, employing over 4000 fabrication personnel, is capable of undertaking the fabrication of all classes of materials, sizes, shapes and complexities in compliance with all International Standards and Codes of Practice. We also operate within the Integrated Management System, independently certified in accordance with Integrated Management System in Compliance with IS0 9001: 2008, ISO 14001: 2004 & OHSAS 18001:2007. ¾ Our site installation teams undertake the site assembly and erection of structural steelwork, metal deck and associated works, meeting all recognized International Standards, with the emphasis on Safe Working Practices. ¾ Our exponential progress has been achieved through our commitment to our projects and more importantly, by the dedicated performance of our resourceful team of professional engineers, managers and employees. ¾ The Company's goal is to provide consistent quality of performance to our clients. At the same time allowing for a structured base to support the local industry of the country we are operating in. EVERSENDAI ENGINEERING QATAR W.L.L QHSE Policy EVERSENDAI ENGINEERING QATAR W.L.L Commercial registration certificate EVERSENDAI ENGINEERING QATAR W.L.L Accreditation Certificates EVERSENDAI ENGINEERING QATAR W.L.L Major Projects Executed in QATAR in Last Five Years EVERSENDAI ENGINEERING QATAR W.L.L Major Projects Executed in Last Five Years - Qatar Tonnage ProjectValue Date Contractual Sl.No. Project Name / Location Date Completed Owner Consultant Location (MT) (in AED) Commenced Completion Date 1 DOHA LAND PHACE 1C 500 13,586,000.00 Feb-13 Sep-13 UNDER CONSTRUCTION BROOKFIELD MULTIPLEX QATAR DAR AL HANDASAH / KEO 2 LUSAIL MPSH - PACKAGE 02 800 9,600,000.00 Apr-13 Dec-13 UNDER CONSTRUCTION QATAR OLYMPIC COMMITTEE QATAR CONSULTANT 3 QATAR RESEARCH CENTRE 2,975 39,441,000.00 May-13 Dec-13 UNDER CONSTRUCTION QATAR FOUNDATION DAR AL-HANDASH QATAR 4 EDUCTAION CITY - ISLAMIC STUDIES 6,643 46,500,000.00 Jul-11 Apr-13 UNDER CONSTRUCTION QATAR PETROLEUM / CCC ARUP QATAR 5 HQ & STRATEGIC STUDIES 1,800 37,200,000.00 Aug-11 May-13 UNDER CONSTRUCTION QATAR FOUNDATION ARUP QATAR 6 QATAR NATIONAL MUSEUM 26,500 278,440,000.00 Nov-11 Dec-13 UNDER CONSTRUCTION QATAR PETROLEUM ARUP QATAR DOHA CONVENTION CENTRE & 7 734 6,800,000.00 Apr-13 Sep-13 UNDER CONSTRUCTION SMJV NA QATAR TOWERTEMPORARY CRANE PLATFORM NEW DOHA INTERNATIONAL AIRPORT NORTH 8 35,500 336,000,000.00 Dec-10 Feb-12 Feb-12 NDIA STEERING COMMITTEE - LOUIE INTERNATIONAL / PARSONS QATAR NODE CP 51, PHASE - 3 9 QATAR DIAR - CONVENTION CENTER & TOWER 13,500 173,000,000.00 Nov-10 Dec-11 Dec-11 QATAR DIAR MAGNUSOON KLEMENCIC QATAR NAKILAT SHIPYARD PHASE-4A - 10 7,000 160,000,000.00 Jul-11 Jul-12 Jul-12 QATAR PETROLEUM ROYALHASKONING QATAR ERHAMA BIN JABER AL JALAHMA SHIPYARD NAKILAT SHIPYARD PHASE- 5 11 1,000 24,000,000.00 Aug-11 Dec-12 Dec-12 QATAR PETROLEUM ROYALHASKONING QATAR ERHAMA BIN JABER AL JALAHMA SHIPYARD NEW DOHA INTERNATIONAL AIRPORT PHASE 1 & 12 65,000 565,000,000.00 Apr-06 Jul-09 Jul 10 NDIA STEERING COMMITTEE LOUIE INTERNATIONAL/ BECHTEL QATAR 2 - CP 18 7 CP 27 13 AGL - SUBSTATION AT NDIA CP 10 500 5,080,639.00 Dec-08 Aug-09 .Aug -09 NDIA STEERING COMMITTEE LOUIE INTERNATIONAL/ BECHTEL QATAR MAGNUSSON KLEMENIC/ KEO 14 NORTH SIDE CENTRAL PLANT CP3 & CP6 750 10,114,027.00 Jan-10 Oct-10 Dec-10 QATAR PETROLEUM QATAR CONSULTANT CENTRAL UTILITY PLANTS CUPS 2,3 & 4 NDIA CP 15 1,200 19,493,092.00 May-10 Nov-10 Apr-11 NDIA STEERING COMMITTEE LOUIE INTERNATIONAL/ BECHTEL QATAR 60 NAKILAT SHIPYARD PHASE-4 AERHAMA BIN 16 16,000 406,111,688.00 Apr-08 Nov-09 Sep-10 QATAR PETROLEUM ROYALHASKONING QATAR JABER AL JALAHMA SHIPYARD 17 QIPCO TOWER 4,000.00 45,000,000.00 Apr-06 Apr-08 Apr-08 QATAR PETROLEUM Mein Hardt Singapore QATAR CONVENTION CENTER LINK BRIDGE ADVANCE MAGNUSSON KLEMENIC/ KEO 18 15,000.00 176,000,000.00 Apr-09 May-10 May-10 QATAR PETOLEUM QATAR WORKS CONSULTANT EVERSENDAI ENGINEERING QATAR W.L.L Major Projects Executed in UAE in Last Five Years EVERSENDAI ENGINEERING QATAR W.L.L Major Projects Executed in Last Five Years - Middle East Tonnage Date Contractual Sl. No Project Title Project Value Date Completed Client Location (MT) Commenced Completion Date Consultant 1 CAPITAL MARKET AUTHORITY 25,000 290,000,000.00 Sep-10 May-13 UNDER CONSTRUCTION SAUDI BINLADIN GROUP HYDER SAUDI ARABIA KING ABDULLAH PETROLEUM STUDIES 2 12,500 203,000,000.00 Dec-10 May-13 UNDER CONSTRUCTION SAUDI ARAMCO ARUP SAUDI ARABIA & RESEARCH CENTRE MINISTRY OF TRANSPORT - 3 SALALAH INTERNATIONAL AIRPORT 4,250 70,000,000.00 Aug-11 Jun-13 UNDER CONSTRUCTION COWILARSON OMAN OMAN 4 KAIA RAWILAWY STATION 12,500 193,045,525.50 Apr-12 Dec-13 UNDER CONSTRUCTION SAUDI BINLADIN GROUP ARUP SAUDI ARABIA 5 YAS MALL 5,250 41,482,131.00 Jan-12 Sep-13 UNDER CONSTRUCTION ALDAR /BESIX AECOM DUBAI 6 ADNOC HQ COLUMN & OUT RIGGER 2,000 12,000,000.00 Jan-12 Apr-13 UNDER CONSTRUCTION ABU DHABI OIL COMPANY /BESIX HALCROW YOLLES/WSP ABUDHABI 7 AL JALILA CHILDRENS HOSPITAL 4,000 44,000,000.00 Mar-12 Mar-13 UNDER CONSTRUCTION DUBAI HEALTH AUTHORITY/AFC STUDIO ALTIERI S.P.A DUBAI 8 ADNOC HQ ROOF STEEL WORK 1,600 25,000,000.00 Jun-12 Dec-13 UNDER CONSTRUCTION ABU DHABI OIL COMPANY/BESIX HALCROW YOLLES/WSP ABUDHABI ABU DHABI INTERNATIONAL 9 25,91625,916 389,894,451.04389,894,451.04 JanJan-1 133 MayMay-1 155 UNDERUNDER CONSTRUCTIONCONSTRUCTIONTAV TAV-ARABTE ARABTECC- CCC KPF ABUDHABIABUDHABI AIRPORTPack age 2&4 2 & 4 10 MASDAR HEAD QUARTERS 2,623 28,950,000.00 Dec-12 Aug-13 UNDER CONSTRUCTION MULTIPLEX WOODS BAGOT DUBAI ETHIHAD SEA FOOD FLOATING ARABIAN CONSTRUCTION 11 157 2,905,853.00 Apr-11 Jan-12 Jan-12 ABUDHABI RESTAURANT COMPANY ARABIAN CONSTRUCTION 12 EMIRATES PEARL HOTEL 2,500 28,000,000.00 Apr-11 Feb-12 Feb-12 HP LEE CONSULATNT ABUDHABI COMPANY 13 GATE DISTRICT TOWER 3-8, AL SHAMS 4,500 85,250,000.00 Apr-10 Jan-12 Jan-12 ARABIAN CONSTRUCTION CO HILL INTERNATIONAL ABUDHABI HYDER CONSULTING 14 DUBAI FESTIVAL CITY PROJECT 6,200.00 73,000,000.00 Feb-05 Apr-07 Apr-07 AL FUTTAIM CARLLION DUBAI ME LTD. EMMAR PROPERTIES PJSC / MEINHARDT 15 DUBAI MALL - ROOF STRUCTURES 13,000.00 190,000,000.00 Jul-05 Oct-08 Oct-08 DUBAI DBB/Al GHANDI/ CCIC JV / ALICO SINGAPORE 16 THE INDEX BUILDING 6,200.00 66,000,000.00 Apr-06 Apr-07 Apr-07 NASA MULYIFLEX L.L.C BG & E DUBAI EVERSENDAI ENGINEERING QATAR W.L.L Major Projects Executed in Last Five Years - Middle East Tonnage Date Contractual Sl. No Project Title Project Value Date Completed Client Location (MT) Commenced Completion Date Consultant NAKHEEL / TAISEI 17 AL MAS TOWER 3,700.00 32,300,000.00 Mar-06 Mar-08 Mar-08 ATKINS DUBAI CORPORATION / ACC JV 18 ANANTARA & TIARA RESIENDENCES 1,000.00 14,660,000.00 Dec-07 Mar-08 Mar-08 ARABTEC CONSTRUCTION LLC DAR-AL-HANDASHAH DUBAI 19 MOTOR CITY - AUTOMALL SHOWROOM 2,200.00 35,000,000.00
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages27 Page
-
File Size-