Euston Express - Petition

Euston Express - Petition

C221-MMD-CV-REP-010-200019 |P02 | 06th May 2015 Euston Express - Petition Revision Date Issued for/Revision details Revised by P01 22/01/2015 Initial issue I Grace P02 06/05/2015 HS2 comments included I Grace Name Data MDL Ref B320 FOI / EIR HS2 to advise Document type Report Directorate London West Midlands WBS HS2 to advise Keywords Report, Template Authors ian.grace-mm Owner Mike Prosser Review Directorate HS2 to advise Employer’s Lead Reviewer HS2 to advise Authorised for use HS2 to advise INTERNAL London West Midlands Euston Express - Petition Contents Page number Executive summary ...................................................................................................... 1 1 Abbreviations and descriptions .............................................................................. 4 2 Introduction .......................................................................................................... 4 2.1 HS2 scheme ............................................................................................................. 4 2.2 Euston Tunnels ........................................................................................................ 4 2.3 Petition to the Hybrid Bill scheme .......................................................................... 5 3 Petition Proposals ................................................................................................. 5 4 Operational Review ............................................................................................... 8 4.1 Overview ................................................................................................................. 8 4.2 Queens Park to South Hampstead .......................................................................... 8 4.3 Primrose Hill and South Hampstead Tunnels ......................................................... 9 4.4 Camden Area........................................................................................................... 9 4.5 Euston Area ........................................................................................................... 10 4.6 Journey Time ......................................................................................................... 10 4.7 Conclusions ........................................................................................................... 11 5 Track Alignment Review ...................................................................................... 12 5.1 Overview ............................................................................................................... 12 5.2 Revised HS2 Tunnel Alignment ............................................................................. 12 5.3 Grade Separation between Watford DC Lines and new WCML Up Slow/Up Watford DC connection ................................................................................................... 12 5.4 WCML Fast Slews .................................................................................................. 14 5.5 GC Gauge Clearance .............................................................................................. 14 5.6 Conclusion ............................................................................................................. 14 6 Civil Engineering Review ...................................................................................... 16 6.1 Existing infrastructure ........................................................................................... 16 6.2 Key scheme requirements .................................................................................... 16 6.3 HS2 Portal ............................................................................................................. 19 Euston Express - Petition i Uncontrolled when printed C221-MMD-CV-REP-010-200019 Printed 7/5/2015 Revision - P02 Date approved – 06th May 2015 INTERNAL 6.4 Alternative HS2 Portal location............................................................................. 21 6.5 Grade separation / Dive Under structure ............................................................. 21 6.6 Primrose Hill Tunnel (Fast) .................................................................................... 25 6.7 Park Street Tunnels ............................................................................................... 33 6.8 South Hampstead Tunnels .................................................................................... 41 6.9 Other Structures ................................................................................................... 49 6.10 Adoption of GB gauge instead of GC gauge .......................................................... 55 7 Electrification and Signalling Discussion ............................................................... 56 7.1 Electrification Implication ..................................................................................... 56 7.2 Signalling Implications .......................................................................................... 60 8 Construction ........................................................................................................ 61 8.1 Introduction .......................................................................................................... 61 8.2 Overview phasing .................................................................................................. 61 8.3 Civil works construction ........................................................................................ 65 9 Rail Systems Construction .................................................................................... 92 9.1 Overview ............................................................................................................... 92 9.2 General Notes relating to the Rail Systems Construction Works ......................... 92 10 Environmental ................................................................................................. 94 10.1 Introduction .......................................................................................................... 94 10.2 HS2 Portal ............................................................................................................. 94 10.3 Alternative HS2 Portal location............................................................................. 95 10.4 Grade separation / Dive Under structure ............................................................. 96 10.5 Primrose Hill Tunnel (Fast) .................................................................................... 96 10.6 Park Street Tunnels ............................................................................................... 97 10.7 DC line Tunnels ..................................................................................................... 97 10.8 Other Structures ................................................................................................... 98 10.9 Operations ............................................................................................................ 98 10.10 Conclusion ......................................................................................................... 98 11 Programme ..................................................................................................... 100 12 Costs ............................................................................................................... 104 13 Comparison of the proposed scheme to Hybrid Bill .......................................... 105 14 Conclusions ..................................................................................................... 107 Appendix A................................................................................................................ 109 A.1 Petition Document .............................................................................................. 109 Appendix B ................................................................................................................ 111 Euston Express - Petition ii Uncontrolled when printed C221-MMD-CV-REP-010-200019 Printed 7/5/2015 Revision - P02 Date approved – 06th May 2015 INTERNAL B.1 Track Schematics ................................................................................................. 111 Appendix C ................................................................................................................ 113 C.1 Alignment Drawings: ........................................................................................... 113 C241-PBR-RT-DPL-01A-000001-PET001794................................................................... 113 C241-PBR-RT-DSE-01A-000001-PET001794 .................................................................. 113 C241-PBR-RT-DPL-01A-000002-PET001794................................................................... 113 C241-PBR-RT-DSE-01A-000003-PET001794 .................................................................. 113 Appendix D ............................................................................................................... 115 D.1 Portal locations ................................................................................................... 115 Appendix E ................................................................................................................ 117 E.1 Dive under structure ..........................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    259 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us