Nuapada Establishment of DTU at DHH DHH, Nuapada DHH New Const

Nuapada Establishment of DTU at DHH DHH, Nuapada DHH New Const

Details of Upgradation & New Construction under NRHM taken up during 2005-2013 Sl Name of the New Const/ Up- Approved in PIP Approved Executing Block Name of the work Category Physical Status no institution gradation PIP Year amount Agency 1 Nuapada Establishment of DTU at DHH DHH, Nuapada DHH new const. 2005-06 2.00 ZSS COMPLETED 2 Nuapada New Const. of DPMU at DHH Nuapada DHH, Nuapada DHH New const. 2005-06 3.42 NRHM COMPLETED 3 Nuapada New Const. of DWH at DHH Nuapada DHH, Nuapada DHH New const. 2005-06 25.64 IDCO COMPLETED 4 Nuapada New Const. of Waiting Hall at Khariar Road CHC Khariar CHC New const. 2005-06 5.33 Block COMPLETED 5 Nuapada Major Up-gradation at Beltukri PHC(N) Beltukuri PHC (N) Up-gradation 2005-06 3.00 Block COMPLETED PHC(N) 6 Nuapada Major Up-gradation at Dharambandha PHC (N) Up-gradation 2005-06 3.75 Block COMPLETED Dharambandha 7 Komna Major Up-gradation at Tarbod PHC(N) Tarboad PHC (N) Up-gradation 2005-06 3.00 Block COMPLETED 8 Komna Major Up-gradation at Budhikomna PHC(N) Budhikomna PHC (N) Up-gradation 2005-06 3.00 Block COMPLETED 9 Boden Major Up-gradation at Karangamal PHC(N) Karangamal PHC (N) Up-gradation 2005-06 3.00 Block COMPLETED 10 Sinapali Major Up-gradation at Sinapalli CHC Sinapali CHC Up-gradation 2005-06 3.00 Block COMPLETED 11 Nuapada Up-gradation of Dharmabandh Sub-Centre SC Dharambandha SC Up-gradation 2006-07 0.50 Block COMPLETED 12 Nuapada Up-gradation of Beltukri Sub-Centre SC Beltukuri SC Up-gradation 2006-07 0.50 Block COMPLETED 13 Komna Up-gradation of Tikarpada Sub-Centre Tikarpada Sub-Centre SC Up-gradation 2006-07 0.50 Block COMPLETED 14 Komna Up-gradation of Rajna Sub-Centre SC Rajana SC Up-gradation 2006-07 0.50 Block COMPLETED 15 Komna Up-gradation of Bisibahal Sub-Centre SC Bisibahal SC Up-gradation 2006-07 0.50 Block COMPLETED 16 Boden Up-gradation of Damjhar Sub-Centre Damjhar Sub-Centre SC Up-gradation 2006-07 0.50 Block COMPLETED 17 Boden Up-gradation of Karangmal Sub-Centre SC Karangamal SC Up-gradation 2006-07 0.50 Block COMPLETED 18 Sinapali Up-gradation of Gorla Sub-Centre Gorla Sub-Centre SC Up-gradation 2006-07 0.50 Block COMPLETED 19 Khariar Up-gradation of Tukla Sub-Centre SC Tukla SC Up-gradation 2006-07 0.50 Block COMPLETED 20 Khariar Up-gradation of Lanji Sub-Centre SC at Lanji. SC Up-gradation 2006-07 0.50 Block COMPLETED 21 Khariar Up-gradation of Duajhar Sub-Centre SC Duajhar SC Up-gradation 2006-07 0.50 Block COMPLETED 22 Up-gradation of SC at SC at SC Up-gradation 2006-07 0.50 Block COMPLETED 23 Khariar Up-gradation of AYUSH OPD at Khariar CHC Khariar CHC Up-gradation 2006-07 0.30 NRHM COMPLETED 24 Nuapada Up-gradation of AYUSH OPD at Khariar road CHC Khariar CHC Up-gradation 2006-07 0.30 NRHM COMPLETED 25 Sinapali Up-gradation of AYUSH OPD at Sinapali CHC Sinapali CHC Up-gradation 2006-07 0.30 NRHM COMPLETED 26 Komna Up-gradation of AYUSH OPD at Komna CHC Komna CHC Up-gradation 2006-07 0.30 NRHM COMPLETED 27 Boden Up-gradation of AYUSH OPD at Boden CHC Boden CHC Up-gradation 2006-07 0.30 NRHM COMPLETED 28 Nuapada Up-gradation of BPMSU at Khariar road CHC Khariar CHC Up-gradation 2006-07 0.36 NRHM COMPLETED 29 Sinapali Up-gradation of BPMSU at Sinapali CHC Sinapali CHC Up-gradation 2006-07 0.36 NRHM COMPLETED 30 Komna Up-gradation of BPMSU at Komna CHC Komna CHC Up-gradation 2006-07 0.36 NRHM COMPLETED 31 Boden Up-gradation of BPMSU at Boden CHC Boden CHC Up-gradation 2006-07 0.36 NRHM COMPLETED 32 Khariar Up-gradation of BPMSU at Khariar CHC Khariar CHC Up-gradation 2006-07 0.36 NRHM COMPLETED 33 Nuapada New Const. Of DTU at DHH Nuapada DHH, Nuapada DHH new const. 2006-07 6.83 NRHM COMPLETED 34 Nuapada Up-gradation ( IPHS) work at DHH Nuapada DHH, Nuapada DHH Up-gradation 2006-07 20.00 PWD COMPLETED 35 Nuapada New Const. Of DSU at DHH Nuapada DHH, Nuapada DHH new const. 2006-07 1.40 NRHM COMPLETED 36 Nuapada New Const. Of DPH Lab. at DHH Nuapada DHH, Nuapada DHH new const. 2006-07 1.40 NRHM COMPLETED 37 Boden New consto of SC at Faresara under Buden block SC Farsara SC new const. 2007-08 6.00 NRHM COMPLETED 38 Khariar New Const. of Kirkita Sub-centre SC Kirketa SC new const. 2007-08 6.00 NRHM COMPLETED Details of Upgradation & New Construction under NRHM taken up during 2005-2013 Sl Name of the New Const/ Up- Approved in PIP Approved Executing Block Name of the work Category Physical Status no institution gradation PIP Year amount Agency 39 Khariar Up-gradation of SC at Birighat under Khariar block SC Birighata SC Up-gradation 2007-08 1.00 NRHM COMPLETED 40 Nuapada Up-gradation Kendubahara Sub-Centre SC Kendubahara SC Up-gradation 2007-08 1.00 NRHM COMPLETED 41 Nuapada Up-gradation of Beltukuri Sub-Centre SC Beltukuri SC Up-gradation 2007-08 1.00 NRHM COMPLETED 42 Nuapada Up-gradation of SC at kotenchun under nuapada block SC Kotenchua SC Up-gradation 2007-08 1.00 NRHM COMPLETED 43 Boden Up-gradation of SC at Karangamal under nuapada block SC Karangamal SC Up-gradation 2007-08 1.00 NRHM COMPLETED 44 Nuapada Up-gradation of SC at koliabandha under nuapada block SC Kuliabandha SC Up-gradation 2007-08 1.00 NRHM COMPLETED 45 Komna Up-gradation of SC at kandetara under komna block SC Kandeitara SC Up-gradation 2007-08 1.00 NRHM COMPLETED 46 Sinapali Construction of Sub Centre at Makhapadar SC Makhapadar SC new const. 2008-09 6.00 NRHM COMPLETED 47 Sinapali Construction of Sub Centre at Kendumunda. SC Kendumunda SC new const. 2008-09 6.00 NRHM COMPLETED 48 Khariar Construction of Sub Centre at kirkita. SC Kirketa SC new const. 2008-09 6.00 NRHM COMPLETED 49 Sinapali Construction of Sub Centre at Bharuamunda. SC Bharuamunda SC new const. 2008-09 6.00 NRHM COMPLETED 50 Boden Up-gradation of Sub Centre at Bahaisadhani SC Bhaisadani SC Up-gradation 2008-09 1.00 NRHM COMPLETED 51 Boden Up-gradation of Sub Centre at Nagapada. SC Nagpada SC Up-gradation 2008-09 1.00 NRHM COMPLETED 52 Sinapali Up-gradation of Sub Centre at Kendumunda. SC Kendumunda SC Up-gradation 2008-09 1.00 NRHM COMPLETED 53 Khariar Up-gradation of Sub Centre at Duajhar. SC Duajhar SC Up-gradation 2008-09 1.00 NRHM COMPLETED 54 Khariar Up-gradation of Sub Centre at Tukla. SC Tukla SC Up-gradation 2008-09 1.00 NRHM COMPLETED 55 Khariar Up-gradation of Sub Centre at Lanji. SC Lanji SC Up-gradation 2008-09 1.00 NRHM COMPLETED 56 Nuapada Up-gradation of Sub Centre at Dharmabandha. SC Dharambandha SC Up-gradation 2008-09 1.00 NRHM COMPLETED 57 Nuapada Up-gradation of Sub Centre at Beltukri. SC Beltukuri SC Up-gradation 2008-09 1.00 NRHM COMPLETED 58 Nuapada Up-gradation of Sub Centre at Kuliabandha. SC Kuliabandha SC Up-gradation 2008-09 1.00 NRHM COMPLETED 59 Komna Up-gradation of Sub Centre at Dalipada. SC Darlipada SC Up-gradation 2008-09 1.00 NRHM COMPLETED 60 Komna Up-gradation of Sub Centre at Suklimundi. SC Suklimundi SC Up-gradation 2008-09 1.00 NRHM COMPLETED 61 Komna Up-gradation of Sub Centre at Bisibahal. SC Bisibahal SC Up-gradation 2008-09 1.00 NRHM COMPLETED 62 Boden Construction of Labour room at Boden. CHC Boden CHC new const. 2008-09 5.00 NRHM COMPLETED 63 Nuapada Furnishing of District Data Centre DHH, Nuapada DHH new const. 2008-09 8.00 NRHM COMPLETED 64 Sinapali Construction of Block level Medicine Godown at Sinapali. CHC Sinapali CHC new const. 2008-09 7.00 NRHM COMPLETED 65 Nuapada Construction of Block level Medicine Godown at Khariaroad. CHC Khariar CHC new const. 2008-09 7.00 NRHM COMPLETED 66 Komna Construction of Block level Medicine Godown at Komna. CHC Komna CHC new const. 2008-09 7.00 NRHM COMPLETED 67 Nuapada Construction of Bleaching shed at DHH Nuapada. DHH, Nuapada DHH new const. 2008-09 2.00 NRHM COMPLETED 68 Nuapada Electrical Fitting at DHH Nuapada DHH, Nuapada DHH Up-gradation 2008-09 0.28 NRHM COMPLETED 69 Nuapada Plumbing Works at DHH Nuapada DHH, Nuapada DHH Up-gradation 2008-09 0.16 NRHM COMPLETED 70 Nuapada Up-gradationing Works at DHH Nuapada DHH, Nuapada DHH Up-gradation 2008-09 1.30 NRHM COMPLETED 71 Nuapada Up-gradationing Works at DHH Nuapada DHH, Nuapada DHH Up-gradation 2008-09 1.00 NRHM COMPLETED 72 Khariar Up-gradation renovation of Khariar CHC. CHC Khariar CHC Up-gradation 2008-09 59.81 OPHC COMPLETED 73 Sinapali Up-gradation renovation of Sinapali CHC. CHC Sinapali CHC Up-gradation 2008-09 90.32 OPHC COMPLETED 74 Nuapada Up-gradation of DHH DHH, Nuapada DHH Up-gradation 2009-10 12.50 PWD COMPLETED 75 Nuapada Up-gradation of PHC/CHC at Khairaroad. CHC Khariar CHC Up-gradation 2009-10 10.00 PWD COMPLETED 76 Komna Up-gradation/Renov. Of PHC,PHC(N)/AH at Tarbod. PHC (N) Tarbod PHC (N) Up-gradation 2009-10 5.00 ZSS COMPLETED 77 Nuapada Up-gradation/Renov. Of PHC,PHC(N)/AH at Beltukri. PHC(N) Beltukuri PHC (N) Up-gradation 2009-10 5.00 ZSS COMPLETED 78 Sinapali Repair/Renov.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us