Bullapura Sand Block

Bullapura Sand Block

FORM-I, PRE-FEASIBILTY & ENVIRONMENT MANAGEMENT PLAN of BULLAPURA SAND BLOCK (Block No:-30) Extent - 15.00 Acres At TUNGABHADRA RIVER BED Opposite to Sy No. – 32 to 40 Rampura Village, Honnali Taluka, Davangere District, Karnataka Of Bashua Ali 16 th Cross, 3 rd Main, J C Layout Harihar – 577601, Davanagerei Dist Karnataka State Government Land Method of Quarrying - Manual Period: 2017-18 to 2021-22 Prepared By GLOBAL Environment & Mining Services (Consulting Engineers, Mine Designers, Geologists & Surveyors) 3rd Main Road, Basaveswara Badavane HOSPET – 583201 , Bellary Dist. (Karnataka) Tel/Fax : +918394 651111/229433 e-mail : [email protected] Website : globalmining.in FORM 1 I. Basic Information: Sl. Item Details No. 1 Name of Project “Bullapura Sand Block” (Block No. 29 ) in Tungabhadra River Bed, opposite to Survey No. 3 - 40 Bullapura Village, Honnali Taluk, Davangere District, Karnataka. 2 Sl. No in the Sc hedule As per the MOEF notification J -13012/12/2013/ -IA -II ( I) dated 24th December 2013, the project is classified as Category “B2” under item 1(a). 3 Proposed Capacity/Length tonnage to be Proposed Capacity: 10691 Tonnes/ year. handled/command area/ Lease area/ Tonnage to be handled : 14734T (includes 10691T sand & number of wells to be drilled. 4043T waste) Lease area: 6.07 Ha.(15-00Acres) No wells need to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity /Area etc Not Applicable 6 Category of Project i.e. ‘A’ or ‘B’ B2 7 Does it attract the specific condition? If No, yes, Pleased specify. 8 Does it attract the general condition? If Yes yes, Pleased specify. As the lease area is 6.07 (15-00Acres), 9 Location Latitude : N 14 008’ 0 3.3” to N 14 0 09’04 .1” Longitude: E 75 0 40’57.4” to E 75 0 41’59.8” Khasra No Opposite Sy.No. 3- 40 Plot/ Toposheet No Map sheet Index 4 8 N /1 2 Village Bulla pura Tehsil Honnali District Davangere State Karnataka 10 Nearest railway s tation/ airport along Nea rest Railway Station: Harihara (54 km) with district in Kms. Nearest Airport: Mangalore (270 km) 11 Nearest Town, City, District Neare st town: Chennagiri (29 km) Headquarters along with distance in Nearest City: Honnali (11 km) Kms. Nearest Dist.: Davangere (42km) 1 12 Village Panchayts , Zilla Parishad, Villag e Panchayt : Bullapura u, Village, H onnali Taluk, Muncipal corporation, Local body Davangere. (Complete Postal Address with Zill Parishad : ZP office, Honnali Taluk, Davangere. Telephone Nos. to be given ) Muncipal Corporation : MC office, Main Road, Honnal Taluk, Davangere. 13 Name of the applicant SRI. BASHUA ALI 14 Registered Address SRI. BASHUA ALI S/o Abdul Nabi Sab, 16 th Cross, 3 rd Main, J C Layout, Harihar – 577601, Davanagere Dist Karnataka State, Ph No. : +919449977405 15 Address for correspondence : SRI. BASHUA ALI S/o Abdul Nabi Sab, 16 th Cross, 3 rd Main, J C Layout, Harihar – 577601, Davanagere Dist Karnataka State, Ph No. : +919449977405 Name SRI. BASHUA ALI Designation ( Owner/Partner/CEO) Owner Address SRI. BASHUA ALI S/o Abdul Nabi Sab, 16 th Cross, 3 rd Main, J C Layout, Harihar – 577601, Davanagere Dist Karnataka State, Ph No. : +919449977405 Pin Code - Email - Telephone - Fax - 16 Details of alternative Sites examined, if The River Sand Quarrying Project is site specific. any Location these sites should be Location Map showing the lease area is enclosed vide Plate shown on topo sheet. No 1 17 Interlinked Project No Interlinked Projects 18 Whether separate application of Not applicable Interlinked projects has been submitted? 19 If yes, date of submission No t applicable 20 If. No reason No i nterlink projects are required for sand mining and production. 21 Whether the proposal involves approval / The sand quarry lease does not fall under any Forest area or clearance under; if yes details of the Wild Life Sanctuary area. same and their status to be given. The Forest (Conservation) Act, 1980 The wild life (Protection) Act, 1972 The C.R.Z Notification, 1991 22 Whether there is any Government The area is granted by Sr. Geologist , Department of M ines order/Policy relevant? Relating to the & Geology, Davanagere vide The Letter of Intent No. site? DMG/SG/DVG/RSLOI/2017-18/287 Dated 15/04/2017 in this regards is enclosed as Annexure-I. 23 Forest land involved (hectares) No 24 Whether there is any litigation pending No against the project and / or land in which The project is propose to be set up? (a)Name of the Court - (b)Case No. - (c)Order / directions of the court, if any - and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc: Yes/ 2.0m Sl. No. Information/Checklist confirmation No 1.1 Permanent or temporary change in land No This is a River Sand Mining and hence there use, land cover or topography including will be some change in land use during active to local land use plan quarrying of sand. However natural replenishment of sand is a continuous process and therefore there shall not be any permanent change in the land use. 1.2 Clearance of existing land, ve getation No No and building? 1.3 Creation of new land uses? No No 1.4 Pre -construction investigation e.g bore No Not required. houses, soil testing? No pre construction investigation is involved in Sand Quarry. 1.5 Construction works? No A small office will be hir ed or constructed in the Bullapura village to supervise work. 3 1.6 Demolition works? No Not applicable . As there are no construction activities. 1.7 Te mpo rary sites used for construction No No construction work or housing of works or housing of construction construction work is involved in this project. workers? The labour requirement for the project shall be obtained from the nearest village. 1.8 Above ground buildings, structures or No No building, structures are required in this earthworks including linear structures, sand quarrying project. cut and fill or excavations The quarrying of river sand shall be restricted to 1.0m depth from the surface or up to the water level, whichever is less. 1.9 Underground works including mining or No Not applicable. tunneling? 1.10 Reclamation works? No The natural replenishment of sand is a continuous process and therefore the reclamation of the worked out pit shall be done naturally. 1.11 Dredging? No No dredging shall be done in this project . 1.12 Offshore structures? No Not required. 1.13 Production and manufacturing process No There is no requirement of any production & manufacturing process 1.14 Facilities for storage of goods or No The manually excavated sand shall be loaded materials? to tippers and transported outside. 1.15 Facilities for treatment or disposal of No There is no top soil to be generated in this solid waste or liquid effluents? area. About 20215 tonnes waste is expected to generate during these five years period of mining. The waste is in basaltic gravel form. 1.16 Facilities for long term housing of No There is no proposal for any housing in this operational workers? project. Local workers will be deployed for quarrying of the sand. 1. 17 New road, rail or sea traffic during No No new roads, rails etc are required. construction or operation? 1. 18 New road, rail, air waterborne or other No Not required transport infrastructure including new or altered routes and stations, ports, airports etc? 1. 19 Closure or diversion of existing No Not required transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No No pipelines? 1.2 1 Impoundment, damming, converting, No No Impoundment, damming, converting, realignment or other changes to the realignment or other changes to the hydrology of watercourses or aquifers? hydrology of watercourses or aquifers is required. 1.22 Stream cros sings? No No 1.23 Abstraction or transfers of water from No No ground or surface waters? 1.24 Changes in water bodies or the land No There will be no change in the water bodies surface affecting drainage or run-off? or land surfaces 1.25 Transport of pe rsonnel or materials for No Local labours will be deployed for quarrying . construction, operation or decommissioning which could have an impact on the environment? 1.26 Long -term dismantling or No Not applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either No There shall not be any influx of people to the temporarily or permanently? area as only Local labours will be deployed 1.29 Introduction of alien species? No No such Introduction of alien species 1.30 Loss of native species or genetic No No, as such no loss of native species or diversity? genetic diversity is expected. 1.31 Any other actions? No Not appl ic able 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities / Sl. Yes/ Information/checklist confirmation rates, wherever possible) with source of No No information data 2.1 Land especially undeveloped or agricultural No The quarrying of sand shall be carried out in land (Ha) the river bed upto the depth of 1.0m from surface.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    38 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us