Charles Anthony House, Manston Road, Margate, Kent CT9 4JW Tel. 01843 821 555 DEMOLITION METHOD STATEMENT for Development House Limited Stoneleigh House Tram Road, Folkestone, Kent CT20 1QR Stoneleigh House, Folkestone Demolition Method Statement DISCLAIMER: This method statement is produced as part of the DDS Demolition Group Safe System of Works and is intended to be used as a guide only for the Health & Safety of DDS Demolition site operatives, visitors and adjacent occupiers of the site in question, so far as can be reasonably expected with the actual knowledge and information available to DDS Demolition Group at the time of issue of this document. As such no reliance should be placed (DDS Demolition Group accepts no responsibility whatsoever for the consequences of such reliance) on this method statement by any person in any contractual arrangement. This does not affect the statutory rights of any party contracting with DDS Demolition Group under general health & safety law. VERSION DETAIL: Draft For Issue REVISION RECORD: Revision No. Amendments Page No. Initials 0 Issued for Demolition This document is classified as a design document for the works described. Before issue and use it must be signed by the author, and after formal review, by a technically competent reviewer. CONTACT DETAILS: Position Name Mobile No. email Contracts Manager Eric Rosay 07815 842814 [email protected] Site Manager First Aider Ref No. TBC Revision 0 Controlled Document: DDS/Stoneleigh House/Method Statement doc/22.03.21/Demolition 1 Stoneleigh House, Folkestone Demolition Method Statement Contents INTRODUCTION ............................................................................................................................... 3 SCOPE OF WORKS ............................................................................................................................ 5 NOTIFICATION ................................................................................................................................. 6 SITE EMERGENCY PROCEDURES ...................................................................................................... 7 NEIGHBOUR LIAISON ....................................................................................................................... 9 NOISE & DUST ............................................................................................................................... 10 SITE BOUNDARY ............................................................................................................................ 12 TRAFFIC MANAGEMENT ................................................................................................................ 13 SITE SPECIFIC METHODOLOGY ...................................................................................................... 14 9.1 SCAFFOLD ERECTION ............................................................................................................. 14 9.2 ASBESTOS REMOVAL ............................................................................................................. 16 9.3 SOFT STRIP ............................................................................................................................. 18 9.4 STRUCTURAL DEMOLITION.................................................................................................... 20 STANDARD OPERATING PROCEDURES ........................................... Error! Bookmark not defined. APPENDIX A – Forms APPENDIX B – COVID-19 Procedures APPENDIX C – Health & Safety File Ref No. TBC Revision 0 Controlled Document: DDS/Stoneleigh House/Method Statement doc/22.03.21/Demolition 2 Stoneleigh House, Folkestone Demolition Method Statement INTRODUCTION Fig: Site Location With this Method Statement, DDS Demolition Ltd will illustrate how the demolition and site clearance of the redundant buildings - Stoneleigh House and George Stone House, Tram Road, Folkestone, Kent CT20 1QR will be carried out for Development House Ltd - (Client). DDS will be Principal Contractor for the demolition phase of the works. Due to the current Covid-19 pandemic the works will be carried out strictly in accordance with current Government guidelines and DDS Covid-19 Working Policy, Operating Procedures and Risk Assessment – See Appendix B. The site management will only use DDS Covid-19 Working Policy, Operating Procedures and Risk Assessment to obtain information for instructing the operatives during induction, daily briefings and toolbox talks. These Procedures will be regularly reviewed and updated in accordance with changes in Government policy / guidelines. Access has not been gained to the buildings. The internal areas are to be inspected to confirm building construction and quantity of internal debris. Ref No. TBC Revision 0 Controlled Document: DDS/Stoneleigh House/Method Statement doc/22.03.21/Demolition 3 Stoneleigh House, Folkestone Demolition Method Statement 1. INTRODUCTION (CONTINUED) Stoneleigh House fronts onto Tram Road (A260) and appears to be a traditional brick masonry structure, with a steel frame retrofitted to support a first-floor extension (which is essentially a modular unit). George Stone House appears to be constructed with traditional load bearing brick masonry however the roof frame is to be inspected and may be steel trusses. The building is built up to, and abuts, a historic wall. The historic wall and site retaining wall are to be retained and not damaged during the works. The site will be accessed from Tram Road. DDS will engage a scaffold contractor for the design and installation of a protective scaffold system to the front and side (party wall) elevations of Stoneleigh House. The scaffolding will be clad with heavy duty monarflex, protect public areas. Refurbishment and Demolition Surveys are to be carried out. Asbestos materials have been identified (corrugated asbestos cement roof sheets). In accordance with The Control of Asbestos Regulations 2012 any Licensed Works asbestos materials will be removed by a specialist Licensed contractor DDS. Environmental Ltd. The Non-Licensed Works asbestos materials will be removed by DDS. All asbestos materials will be transported by a licensed carrier and disposed of in a licensed landfill site. All necessary transfer / consignment notes will be issued as part of the completion waste file. The services to the buildings for demolition are live. The arrangements for survey, tracing, isolation and termination of the services are to be made by Development House Ltd. A temporary water supply will be maintained for damping down dust and a temporary electrical supply for the site welfare. DDS are 9001, 14001 & 45001 compliant and proud of our respected reputation within the Construction Industry for the successful completion of sensitive demolition contracts. All demolition works will be carried out in accordance with BS 6187:2011 - Code of Practice for Demolition. DDS are fully aware that the key to a successful contract will be to fully segregate and protect the General Public, client operatives and adjacent structures from the impact of the demolition works – both visually and physically, from debris, dust, noise & vibration. The site will be secured with Heras fencing prior to demolition works commencing. Gates will be incorporated into the fencing at the pavement crossover location. A banksman will protect pedestrians and road users whilst vehicles enter or leave the site. The demolition of the structures will be progressed gradually using a combination of handheld tools (adjacent to the retained historic wall) and 360° excavators. The works will always be governed by safety. The method, routes of access and techniques may change as the condition of the structures unfolds. Ref No. TBC Revision 0 Controlled Document: DDS/Stoneleigh House/Method Statement doc/22.03.21/Demolition 4 Stoneleigh House, Folkestone Demolition Method Statement SCOPE OF WORKS The works generally comprise the demolition works to the existing buildings on site and includes: • Establish site welfare, site office and tool store • Erect Heras fencing to secure the site boundary including gates • Arrange Refurbishment and Demolition asbestos survey • Remove asbestos containing materials • Arrange scaffold licences • Design and erect protection scaffold clad with monarflex to the front and side elevations • Soft strip buildings • Demolish buildings down to top of ground slab level • Break out slabs, hardstandings and foundations • Crush concrete / hardcore arising and stockpile on site • Backfill and compact void with selected crushed arisings • Remove all other materials arising • Leave site clean, tidy and safe on completion Ref No. TBC Revision 0 Controlled Document: DDS/Stoneleigh House/Method Statement doc/22.03.21/Demolition 5 Stoneleigh House, Folkestone Demolition Method Statement NOTIFICATION Prior to commencing on site, the following arrangements will have been made by Development House Ltd: • All necessary Planning Consents • Party wall agreements • Notification to Folkestone & Hythe District Council - Section 80 of the Building Act 1984 regarding the commencement of demolition works • Technical Approvals with Highways • Temporary propping requirements for the Historic Wall • Services disconnections and provision of temporary supplies • F10 notification Prior to commencing on site, the following arrangements will be made by DDS: • Refurbishment and Demolition asbestos surveys • Employ Asbestos contractor – Licensed asbestos works removal
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages130 Page
-
File Size-