Implementation Status & Results

Implementation Status & Results

The World Bank Report No: ISR12197 Implementation Status & Results Honduras Second Land Administration Project (P106680) Operation Name: Second Land Administration Project (P106680) Project Stage: Implementation Seq.No: 5 Status: ARCHIVED Archive Date: 20-Nov-2013 Country: Honduras Approval FY: 2011 Public Disclosure Authorized Product Line:IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Board Approval Date 30-Jun-2011 Original Closing Date 30-Jan-2017 Planned Mid Term Review Date 08-Sep-2014 Last Archived ISR Date 24-Apr-2013 Public Disclosure Copy Effectiveness Date 21-Nov-2011 Revised Closing Date 30-Jan-2017 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) Provide the population in the Project Area with improved, decentralized land administration services, including better access to and more accurate information on property records and transactions. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost Policy and Institutional Strengthening 9.00 Cadastral Surveying and Land Regularization 18.00 Demarcation of Protected Areas 0.50 Strengthening of Miskito People's Land Rights 1.80 Project Management and Monitoring and Evaluation 3.50 Overall Ratings Previous Rating Current Rating Public Disclosure Authorized Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Substantial Substantial Implementation Status Overview Public Disclosure Copy The Project is the second phase of a long-term program of the Government of Honduras aimed at modernizing the land administration system of the country. Project activities are advancing rapidly. To date, 32,000 families (close to 65 per cent of total target) in urban and rural areas have benefited from new titles to their properties, while 339,000 parcels have Page 1 of 7 Public Disclosure Authorized The World Bank Report No: ISR12197 been surveyed. Moreover, Miskito communities of the territorial council of Katainasta and Auhya Yari received collective title to their lands in August 2012 and May 2013 respectively, setting a historic precedent for the country, while the demarcation process of two more territorial councils is underway. Locations Country First Administrative Division Location Planned Actual Honduras Departamento de Yoro Departamento de Yoro ✔ Honduras Not Entered Yoro Honduras Not Entered Wampusirpi Honduras Not Entered Villanueva Public Disclosure Copy Honduras Not Entered Valle de Angeles Honduras Not Entered Trujillo Honduras Not Entered Tocoa Honduras Not Entered Santa Rosa de Copan Honduras Not Entered Santa Cruz de Yojoa Honduras Not Entered San Pedro Sula Honduras Not Entered San Manuel Honduras Not Entered Puerto Lempira Honduras Not Entered Potrerillos Honduras Not Entered Pimienta Honduras Not Entered Omoa Honduras Departamento de Olancho Departamento de Olancho ✔ Honduras Not Entered Olanchito Honduras Not Entered Juticalpa Honduras Departamento de Gracias a Dios Departamento de Gracias a Dios ✔ Honduras Departmento de Francisco Morazan Departmento de Francisco Morazan ✔ Honduras Not Entered El Progreso Public Disclosure Copy Honduras Departamento de El Paraiso Departamento de El Paraiso ✔ Page 2 of 7 The World Bank Report No: ISR12197 Country First Administrative Division Location Planned Actual Honduras Not Entered Danli Honduras Departamento de Cortes Departamento de Cortes ✔ Honduras Departamento de Cortes Departamento de Cortes ✔ Honduras Departamento de Copan Departamento de Copan ✔ Honduras Departamento de Comayagua Departamento de Comayagua ✔ Honduras Departamento de Colon Departamento de Colon ✔ Public Disclosure Copy Honduras Choluteca Departamento de Choluteca ✔ Honduras Not Entered Choluteca Honduras Not Entered Choloma Honduras Not Entered Distrito Central Honduras Not Entered La Lima Honduras Not Entered Puerto Cortes Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target At least 70% of clients rate modernized registry Percentage Value 68.00 69.00 70.00 services as "satisfactory" (third-level on a four Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 level scale) Comments Based on periodical surveys. At least 70% of women rate modernized Percentage Value 0.00 68.00 70.00 registry services as "satisfactory" (third-level on Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 a four-level scale) Comments Based on periodical surveys. Avg no. of days to complete recordn of Number Value 23.00 0.00 18.00 purchase/sale of property in land adm systm Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Comments First measurement planned for Mid-Term Review. Rapid analysis suggest further Public Disclosure Copy reductions in time in some of Page 3 of 7 The World Bank Report No: ISR12197 the modernized registries under the Project. Avg no. of days to complete recordn of Number Value 0.00 0.00 0.00 purchase/sale of property–Rural Sub Type Date Breakdown Comments N/A for this project The Honduran Government N/A for this project does not differentiate between rural and urban. Ratio of Public Services Government Percentage Value 0.00 1.00 Revenues over Costs (%) Date 30-Aug-2013 30-Jan-2017 Comments First formal measurement Indicator represents planned for Mid-Term Review. sustainability of property Public Disclosure Copy registry services. Government revenues sub- indicator has a target of 2,519,053 per year for modernized registries. Government revenues from the main public Amount(USD) Value 0.00 2519053.00 service targeted by the project Sub Type Supplemental System (SURE-SINAP) maintains 96% Percentage Value 94.00 94.00 96.00 accuracy rate in the registry of land titles in Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 folio real Comments At least 50,000 families in rural and urban Number Value 0.00 32106.00 50000.00 areas complete process to obtain new land Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 titles through the Project (of which at least30% are women) Comments At least 30% are women. Target popln with use or ownership rights Number Value 0.00 1729996.00 2004850.00 recorded as a result of the project Date 30-Aug-2013 Comments Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Policy and master plan for the development of Number Value 0.00 0.00 1.00 the national cadastral system prepared Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Comments Preparation of master plan underway. Public Disclosure Copy Page 4 of 7 The World Bank Report No: ISR12197 At least 5 property registries modernized by the Number Value 0.00 1.00 5.00 Project Date 05-Sep-2011 30-Aug-2013 30-Jan-2017 Comments Modernization of two more registries underway. At least 8 municipalities established as IP's Number Value 0.00 0.00 8.00 associated centers Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Comments Process to make the first municipality (El Progreso) an associated center of IP is well advanced. Value Public Disclosure Copy 700 people from private and public sector Number 0.00 457.00 700.00 trained to use SURE Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Comments 1168 completed in phase I The Property Institute has fully implemented its Percentage Value 0.00 85.00 100.00 financial (SIAF) transparency and Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 accountability systems Comments System's installation was completed. Information in some of the modules still being uploaded. Land parcels with use or ownership rights Number Value 0.00 339215.00 390000.00 recorded as a result of the project Date 31-Jan-2011 30-Aug-2013 06-Sep-2017 Comments Target ahead of schedule. Land parcels with use/ownership rights Number Value 0.00 91022.00 156000.00 recorded as a result of project-female Sub Type Date 31-Jan-2011 30-Aug-2013 06-Sep-2017 Breakdown Comments Target land area with use or ownership rights Hectare(Ha) Value 166312.00 246694.55 recorded as a result of project Date 30-Aug-2013 30-Jan-2017 Comments Target ahead of schedule. At least 70% of population in survey-target Percentage Value 70.00 areas participates during cadastral surveying Date 30-Aug-2013 30-Jan-2017 and public disclosure of information, with 70% of participants rating the process as Comments First formal measurement will "satisfactory" be conducted for the Mid- Term Review. Administrative limits of at least 10 Number Value 0.00 6.00 10.00 municipalities surveyed Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Public Disclosure Copy Comments 25 completed in Phase I Page 5 of 7 The World Bank Report No: ISR12197 At least 4 municipalities prepare, through a Number Value 0.00 5.00 4.00 participatory process, territorial planning maps Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Comments Target surpassed. 90,000 urban and rural parcels in the Project Number Value 0.00 48936.00 90000.00 area are registered in folio real Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Comments 100,000 completed in Phase I The average cost to register a land transaction Amount(USD) Value 15.00 0.00 12.00 through the modernized registries under the Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Project is USD12.0 Comments value after phase I was First formal measurement will USD15 be conduced for the Mid-Term Public Disclosure Copy Review. The Buffer Zones of at least 4 Protected Areas Number Value 2.00 0.00 4.00 are delimited and demarcated Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 Comments value after Phase I was 2 Demarcation activities underway in 3 protected areas. Following participatory and culturally Number Value 0.00 48.00 25.00 acceptable processes, the lands of at least 25 Date 06-Sep-2011 30-Aug-2013 30-Jan-2017 communities in La Moskitia are delimited, demarcated,titled, and registered Comments Following Phase I, the titling Target surpassed.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us