
Historic environment assessment ©MOLA 2019 Historic environment assessment ©MOLA 2019 the site the site Fig 3 John Norden's 250 years of map making in the County of Surrey, sheet no. 3b, 1594. Fig 5 Ordnance Survey 1st edition 6”:mile map of 1873 (not to scale). the site the site Fig 4 John Roque's map of Surrey, 1768. Fig 6 Ordnance Survey 2nd edition 6”:mile map of 1896 (not to scale). SURR2016HEA19#03&04_Egley Road SURR2016HEA19#05&06_Egley Road Historic environment assessment ©MOLA 2019 Egley Road APPENDIX E: Information for Inclusion within an ES – Way Finding the site Fig 7 Ordnance Survey 25”:mile map of 1935/6 (not to scale). SURR2016HEA19#07_Egley Road Egley Road Egley Road Information for Inclusion in Environmental Statements, How the EIA will address the Information Information for Inclusion in Environmental Statements, How the EIA will address the Information as Specified in Schedule 4 of the EIA Regulations 2017 Specifications as Specified in Schedule 4 of the EIA Regulations 2017 Specifications 1. A description of the development, including in particular: Chapter 5: Demolition and Construction; (a) ES Volume 1: 2. A description of the reasonable alternatives (for example in ES Volume 1: a description of the location of the development; terms of development design, technology, location, size Chapter 3: Alternatives and Design Evolution; Chapter 1: Introduction; and scale) studied by the developer, which are relevant to (b) a description of the physical characteristics of the whole ES Volume 1: the proposed project and its specific characteristics, and an indication of the main reasons for selecting the chosen development, including, where relevant, requisite Chapter 4: The Proposed Development; demolition works, and the land-use requirements during option, including a comparison of the environmental the construction and operational phases; Chapter 5: Demolition and Construction; effects. (c) a description of the main characteristics of the operational ES Volume 1: 3. ES Volume 1: A description of the relevant aspects of the current state of phase of the development (in particular any production Chapter 2: EIA Methodology; Chapter 4: The Proposed Development; the environment (baseline scenario) … process), for instance, energy demand and energy used, Technical Chapters 6 – 7; …nature and quantity of the materials and natural ES Volume 1: …and an outline of the likely evolution thereof without ES Volume 1: resources (including water, land, soil and biodiversity) Chapter 4: The Proposed Development; implementation of the development as far as natural Chapter 2: EIA Methodology; used; and Chapter 5: Demolition and Construction; changes from the baseline scenario can be assessed with reasonable effort on the basis of the availability of Technical Chapters 6 – 7; (d) ES Volume 1: environmental information and scientific knowledge. Chapter 2: EIA Methodology (Summary of ‘Topics 4. ES Volume 1: an estimate, by type and quantity, of expected residues Scoped Out From EIA); Chapter 2: EIA Methodology (Summary of ‘Topics and emissions (such as water, … ES Volume 2: A description of the factors specified in regulation 4(2) Scoped Out From EIA); EIA Scoping Report (refer Scoping Report (Topics likely to be significantly affected by the development: Chapter 4: The Proposed Development; Scoped Out From EIA)). population, human health, … ES Volume 2: ES Volume 1: EIA Scoping Report (refer Scoping Report (Topics Chapter 6: Air Quality; Scoped Out From EIA)); …air, … ES Volume 2: ES Volume 1: Air Quality; Chapter 2: EIA Methodology (Summary of ‘Topics ES Volume 1: Scoped Out From EIA); Chapter 2: EIA Methodology (Summary of ‘Topics Chapter 4: The Proposed Development; Scoped Out From EIA); Chapter 7: Ecology; ES Volume 2: ES Volume 2: …biodiversity (for example fauna and flora), … …soil and subsoil pollution,… EIA Scoping Report (refer Scoping Report (Topics EIA Scoping Report (refer Scoping Report (Topics Scoped Out From EIA)); Scoped Out From EIA)); Preliminary Risk Assessment (Scoping Report – Preliminary Ecological Appraisal (Scoping Report - Appendix); Appendix A); Standalone Documents ES Volume 1: Light Pollution Report; Chapter 2: EIA Methodology (Summary of ‘Topics ES Volume 1: Scoped Out From EIA); …noise, vibration, … Chapter 2: EIA Methodology (Summary of ‘Topics ES Volume 2: Scoped Out From EIA); EIA Scoping Report (refer Scoping Report (Topics ES Volume 2: Scoped Out From EIA)); …land (for example land take), …. EIA Scoping Report (refer Scoping Report (Topics ES Volume 1: Scoped Out From EIA)); Chapter 2: EIA Methodology (Summary of ‘Topics Preliminary Risk Assessment (Scoping Report - Scoped Out From EIA); Appendix); ES Volume 2: …light, … EIA Scoping Report (refer Scoping Report (Topics ES Volume 1: Scoped Out From EIA)); Chapter 2: EIA Methodology (Summary of ‘Topics Standalone Documents Scoped Out Form EIA); Light Pollution Report; …soil (for example organic matter, erosion, compaction, ES Volume 2: EIA Scoping Report (refer Scoping Report (Topics ES Volume 1: sealing), … Scoped Out From EIA)); Chapter 2: EIA Methodology (Summary of ‘Topics Scoped Out From EIA); Preliminary Risk Assessment (Scoping Report - …heat, radiation and … ES Volume 2: Appendix); EIA Scoping Report (refer Scoping Report (Topics ES Volume 1: Scoped Out From EIA)); Chapter 2: EIA Methodology (Summary of ‘Topics …water (for example hydromorphological changes, ES Volume 1: Scoped Out From EIA); …quantities and types of waste produced during the quantity and quality), … construction and operation phases; Chapter 4: The Proposed Development; ES Volume 2: EIA Scoping Report (refer Scoping Report (Topics Egley Road Egley Road Information for Inclusion in Environmental Statements, How the EIA will address the Information Information for Inclusion in Environmental Statements, How the EIA will address the Information as Specified in Schedule 4 of the EIA Regulations 2017 Specifications as Specified in Schedule 4 of the EIA Regulations 2017 Specifications Scoped Out From EIA)); (c) ES Volume 1: Standalone Documents Chapter 2: EIA Methodology (Summary of ‘Topics Flood Risk Assessment Scoped Out From EIA); Surface Water and Foul Drainage Strategy; Chapter 6: Air Quality; the emission of pollutants, … ES Volume 1: ES Volume 2: Chapter 6: Air Quality; EIA Scoping Report (refer Scoping Report (Topics …air, … Scoped Out From EIA)); ES Volume 2: Air Quality; Air Quality ES Volume 1: ES Volume 1: Chapter 2: EIA Methodology (Summary of ‘Topics …climate (for example greenhouse gas emissions, Chapter 4: Proposed Development Scoped Out From EIA); impacts relevant to adaptation), … …noise, vibration,… ES Volume 2: ES Volume 2: Greenhouse Gas Assessment; EIA Scoping Report (refer Scoping Report (Topics ES Volume 1: Scoped Out From EIA)); Chapter 2: EIA Methodology (Summary of ‘Topics ES Volume 1: Scoped Out From EIA); Chapter 2: EIA Methodology (Summary of ‘Topics ES Volume 2: Scoped Out From EIA); …material assets, cultural heritage, including architectural EIA Scoping Report (refer Scoping Report (Topics ES Volume 2: …light, … and archaeological aspects, and landscape… Scoped Out From EIA)); EIA Scoping Report (refer Scoping Report (Topics Historic Environment Assessment (Scoping Report - Scoped Out From EIA)); Appendix); Standalone Documents Standalone Documents Light Pollution Report Landscape and Visual Impact Appraisal ES Volume 1: 5. A description of the likely significant effects of the Chapter 2: EIA Methodology (Summary of ‘Topics development on the environment resulting from, inter alia: Scoped Out From EIA); …heat and radiation, … (a) the construction and existence of the development, ES Volume 1: ES Volume 2: including, where relevant, demolition works. Chapter 5: Demolition and Construction; EIA Scoping Report (refer Scoping Report (Topics Scoped Out From EIA)); (b) ES Volume 1: the use of natural resources, in particular land, soil, … Chapter 4: The Proposed Development; ES Volume 1: Chapter 5: Demolition and Construction; Chapter 2: EIA Methodology (Summary of Topics Scoped Out From EIA); …the creation of nuisances, … ES Volume 1: ES Volume 2: Chapter 2: EIA Methodology (Summary of ‘Topics EIA Scoping Report (refer Scoping Report (Topics Scoped Out Form EIA); Scoped Out From EIA)); ES Volume 2: ES Volume 1: …water and … EIA Scoping Report (refer Scoping Report (Topics Scoped Out From EIA)); Chapter 2: EIA Methodology (Summary of Topics …and the disposal and recovery of waste; Scoped out from EIA); Standalone Documents Chapter 4: The Proposed Development; Flood Risk Assessment; Chapter 5: Demolition and Construction; Surface Water and Foul Drainage Strategy; (d) ES Volume 1: ES Volume 1: Chapter 2: EIA Methodology (Summary of ‘Topics Chapter 4: The Proposed Development; Scoped Out From EIA); Chapter 7: Ecology; Technical Chapters 6 – 7; ES Volume 2: the risks to human health, cultural heritage or the ES Volume 2: Ecology environment (for example due to accidents or disasters); …biodiversity, … EIA Scoping Report (refer Scoping Report (Topics Preliminary Ecological Appraisal (Scoping Report - Scoped Out From EIA)); Appendix); Standalone Documents Flood Risk Assessment; Standalone Documents Surface Water and Foul Drainage Strategy; Light Pollution Report; (e) the cumulation of effects with other existing and/or ES Volume 1 ES Volume 1: approved projects, taking into account any existing Technical Chapters 6 – 7; environmental problems relating to areas of particular …considering as far as possible the sustainable availability Chapter 4: The Proposed
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages77 Page
-
File Size-