Extension of Igang Seawall Bacacay, Albay Igang, Bacacay, Albay LIMITS: Sta

Extension of Igang Seawall Bacacay, Albay Igang, Bacacay, Albay LIMITS: Sta

Page 1 of 6/BILL OF QUANTITIES Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Office of the District Engineer Albay 1st District Engineering Office Airport Site, Legazpi City 18FA0001 - CLUSTER 1 REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT BAYBAY & BOLO, TIWI, ALBAY AND AT IGANG, BACACAY, ALBAY IST LD BILL OF QUANTITIES BB1 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 1 REHABILITATION/EXTENSION OF BAYBAY SEAWALL ( PHASE 3) , TIWI, ALBAY ( L=177m) Part-A Facilities for the Engineer A.1.1 (8) Prov. of Field Office for the Engr. (Rental Basis) per month 5.30 month A.1.2(4) Prov. Of Service Vehicle for the Engr. On Bare Rental Basis per month 0.76 month Part-B Other General Requirements B.5 Project Billboard/Signboard per ea. 2.00 ea B.7 Occupational Safety and Health Program per month 5.30 month B.9 Mobilization / Demobilization per l.s. 1.00 l.s. CONSTRUCTION OF SEAWALL & ANCHORAGE Part -1A Earthworks 1701(5) Removal of Structures & Obstruction per l.s. 1.00 l.s. 1702(5)b Shoring, Cribbing & Related Works (cribbing & cofferdamming) per l.s. 1.00 l.s. 1702(2) Surplus common excavation per cu.m. 636.00 cu.m. Part -1B Bank and Slope Protection 1712(2) Concrete Slope Protection per cu.m.-in-place 860.00 cu.m.-in-place 1710(5) Grouted Riprap, Class A (15-25kg) per cu.m. 742.00 cu.m. TOTAL AMOUNT IN FIGURES Total Amount in Words CONTRACTOR: SIGNATURE: Page 2 of 6/BILL OF QUANTITIES Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Office of the District Engineer Albay 1st District Engineering Office Airport Site, Legazpi City 18FA0001 - CLUSTER 1 REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT BAYBAY & BOLO, TIWI, ALBAY AND AT IGANG, BACACAY, ALBAY IST LD BILL OF QUANTITIES BB1 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 1710(2) Riprap, Class B (30-70kg) per cu.m. 1,921.50 cu.m. 1717(2)a Steel Sheet Piles, (furnished & driven) per l.m. 3,144.00 l.m. 1715(1) Filter Materials per sq.m. 2,212.50 sq.m. CONSTRUCTION OF ROADS Part-C Earthworks 104(2)a Selected Borrow, for Toppings, case 1 per cu.m. 3,483.00 cu.m. 105(1)a Subgrade Preparation (common materials) per sq.m. 1,611.00 sq.m. Part-D Subbase and Basecourse 200(1) Aggregate Subbase Course per cu.m. 161.00 cu.m. Part-E Surface Courses 311(1)c1 PCC Pavement (Unreinforced), 0.23 m thk, 14days per sq.m. 1,611.00 sq.m. SUBTOTAL-1 TOTAL AMOUNT IN FIGURES Total Amount in Words CONTRACTOR: SIGNATURE: Page 3 of 6/BILL OF QUANTITIES Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Office of the District Engineer Albay 1st District Engineering Office Airport Site, Legazpi City 18FA0001 - CLUSTER 1 REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT BAYBAY & BOLO, TIWI, ALBAY AND AT IGANG, BACACAY, ALBAY IST LD BILL OF QUANTITIES BB1 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 2 REHABILITATION/EXTENSION OF BOLO SEAWALL ( PHASE I) , TIWI, ALBAY ( L=49.30m) Part-A Facilities for the Engineer A.1.1 (8) Prov. of Field Office for the Engr. (Rental Basis) per month 4.03 month A.1.2(4) Prov. Of Service Vehicle for the Engr. On Bare Rental Basis per month 0.34 month Part-B Other General Requirements B.5 Project Billboard/Signboard per ea. 2.00 ea B.7 Occupational Safety and Health Program per month 4.03 month B.9 Mobilization / Demobilization per l.s. 1.00 l.s. CONSTRUCTION OF SEAWALL & ANCHORAGE Part -1A Earthworks 1702(5)b Shoring, Cribbing & Related Works (cribbing & cofferdamming) per l.s. 1.00 l.s. 1702(2) Surplus common excavation per cu.m. 423.64 cu.m. Part -1B Bank and Slope Protection 1712(2) Concrete Slope Protection per cu.m.-in-place 533.09 cu.m.-in-place 1710(5) Grouted Riprap, Class A (15-25kg) per cu.m. 318.28 cu.m. TOTAL AMOUNT IN FIGURES Total Amount in Words CONTRACTOR: SIGNATURE: Page 4 of 6/BILL OF QUANTITIES Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Office of the District Engineer Albay 1st District Engineering Office Airport Site, Legazpi City 18FA0001 - CLUSTER 1 REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT BAYBAY & BOLO, TIWI, ALBAY AND AT IGANG, BACACAY, ALBAY IST LD BILL OF QUANTITIES BB1 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 1710(2) Riprap, Class B (30-70kg) per cu.m. 1,135.28 cu.m. 1717(2)a Steel Sheet Piles, (furnished & driven) per l.m. 1,128.00 l.m. 1715(1) Filter Materials per sq.m. 591.60 sq.m. CONSTRUCTION OF ROADS Part-C Earthworks 104(2)a Selected Borrow, for Toppings, case 1 per cu.m. 970.20 cu.m. 105(1)a Subgrade Preparation (common materials) per sq.m. 449.00 sq.m. Part-D Subbase and Basecourse 200(1) Aggregate Subbase Course per cu.m. 44.86 cu.m. Part-E Surface Courses 311(1)c1 PCC Pavement (Unreinforced), 0.23 m thk, 14days per sq.m. 448.63 sq.m. SUBTOTAL-2 TOTAL AMOUNT IN FIGURES Total Amount in Words CONTRACTOR: SIGNATURE: Page 5 of 6/BILL OF QUANTITIES Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Office of the District Engineer Albay 1st District Engineering Office Airport Site, Legazpi City 18FA0001 - CLUSTER 1 REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT BAYBAY & BOLO, TIWI, ALBAY AND AT IGANG, BACACAY, ALBAY IST LD BILL OF QUANTITIES BB1 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 3 REHABILITATION/CONSTRUCTION/EXTENSION OF IGANG SEAWALL , BACACAY, ALBAY ( L=127.0m) Part-A Facilities for the Engineer A.1.1 (8) Prov. of Field Office for the Engr. (Rental Basis) per month 5.20 month A.1.2(4) Prov. Of Service Vehicle for the Engr. On Bare Rental Basis per month 0.70 month Part-B Other General Requirements B.5 Project Billboard/Signboard per ea. 3.00 ea B.7 Occupational Safety and Health Program per month 5.20 month B.9 Mobilization / Demobilization per l.s. 1.00 l.s. CONSTRUCTION OF SEAWALL & ANCHORAGE Part -1A Earthworks 1702(5)b Shoring, Cribbing & Related Works (cribbing & cofferdamming) per l.s. 1.00 l.s. 1702(2) Surplus common excavation per cu.m. 638.00 cu.m. Part -1B Bank and Slope Protection 1712(2) Concrete Slope Protection per cu.m.-in-place 1,282.00 cu.m.-in-place 1710(1) Riprap, Class A per cu.m. 868.00 cu.m. TOTAL AMOUNT IN FIGURES Total Amount in Words CONTRACTOR: SIGNATURE: Page 6 of 6/BILL OF QUANTITIES Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Office of the District Engineer Albay 1st District Engineering Office Airport Site, Legazpi City 18FA0001 - CLUSTER 1 REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT BAYBAY & BOLO, TIWI, ALBAY AND AT IGANG, BACACAY, ALBAY IST LD BILL OF QUANTITIES BB1 ITEM NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 1710(2) Riprap, Class B (30-70kg) per cu.m. 3,321.00 cu.m. 1717(2)a Steel Sheet Piles, (furnished & driven) per l.m. 2,306.00 l.m. 1715(1) Filter Materials per sq.m. 2,546.50 sq.m. CONSTRUCTION OF ROADS Part-C Earthworks 101(1) Removal of Structures and Obstruction per l.s. 1.00 l.s. 104(2)a Selected Borrow, for Toppings, case 1 per cu.m. 2,325.00 cu.m. 105(1)a Subgrade Preparation (common materials) per sq.m. 1,156.00 sq.m. Part-D Subbase and Basecourse 200(1) Aggregate Subbase Course per cu.m. 116.00 cu.m. Part-E Surface Courses 311(1)c1 PCC Pavement (Unreinforced), 0.23 m thk, 14days per sq.m. 1,156.00 sq.m. SUBTOTAL-3 TOTAL AMOUNT IN FIGURES TOTAL Total Amount in Words CONTRACTOR: SIGNATURE: DEPARTMENT OF PUBLIC WORKS & HIGHWAYS REGION V ALBAY 1ST DISTRICT ENGINEERING OFFICE AIRPORT SITE, LEGAZPI CITY Rehabilitation/Construction/ Extension of Igang Seawall Bacacay, Albay Igang, Bacacay, Albay LIMITS: Sta. 0+000 - 0+130 NET LENGTH: 130.00 I.m. SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: ANNELLE P. ANTIVOLA GUILBERT P. ROMERO SIMON N. ARIAS ENGINEER III ASST. DISTRICT ENGINEER DISTRICT ENGINEER CHIEF, PLANNING AND DESIGN SECTION CONSTRUCTION / EXTENSION OF IGANG SEAWALL BACACAY, ALBAY INDEX OF SHEETS SHEET i COVER SHEET N G-1 - SHEET 2 INDEX OF SHEETS, STRAIGHT LINE DIAGRAM, VICINITY MAP, SUMMARY OF QUANTITIES & CONST. REQT'S RS-1 - SHEET 3 TYPICAL DETAIL OF SEAWALL W/ RAMP, DETAIL OF SHEET PILES Libod Balsa Baybay RS-2 - SHEET 4 DETAIL OF ENDWALL, DETAILED OF CUT-OFF ENDWALL Bagumbayan W RS-3 - SHEET 5 DETAIL OF WAVE DEFLECTOR, DETAIL OF FOUNDATION,DETAIL OF RAMP, DETAIL OF "A" Balading Coast Tuliw RS-4 - SHEET 6 CONCRETE PAVEMENT DETAIL Balading RS-5 - SHEET 7 PAVEMENT MARKINGS DETAIL Awang Bariw Pawa E SHEET 8 PROJECT BILLBOARD San Carlos Bacolod RS-6 - Labnig Cormidal Estancia Bombon Sto. Cristo Ogob Panal TABACO S San Ramon San Roque Baranghawon Tagas Guinobat Fatima BEG. OF PROJECT END OF PROJECT Salvacion STA. 0 + 000 STA. 0 + 130.00 Mariroc San Lorenzo Nagsipit Bongabong Sabang San Isidro P R O P O S E D S T R U C T U R E Comon Sta.Cruz ( L = 130.00LM. ) MALILIPOT Canaway Baybay Binitayan Sta.Teresa Sogod STA. 0 + 000 San Francisco STA. 0 + 130.00 Hindi STRAIGHT LINE DIAGRAM San Jose BACACAY San Roque Gubat Igang Cajugutan Balandra Baclayon Calbayog Bonga Basud San Pedro San Fernando Nahapunan Bayandong San Andres Bariw Gajo Dakulong Misericordia Gapo Malobago Tambongon Banao San Antonio Kawayan Salvacion Mauna Alimsog Saday San Isidro STO.DOMINGO Kalayukay Alimsog Dacula Sn.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us