Public Private Partnership for Energy Production in NEW CALEDONIA

Public Private Partnership for Energy Production in NEW CALEDONIA

Public Private Partnership for Energy Production in NEW CALEDONIA Pierre Alla President CCE New-Caledonia PECC Conference November 17 / 18 Santiago de Chili SituationSituationSituation Réseau de Transport 150 kV : 471 km Réseau de Transport 33 kV : 566 km Réseaux de Distribution : 3 266 km BELEP Clients : 23 081 Waala Ouégoa Poum Pouébo OUVEA Koumac Hienghène Fayaoué Kaala-Gomen Touho LIFOU Poindimié We Voh Ponérihouen Koné Néaoua Pouembout Tu Kouaoua MARE Népoui Poya Canala Tadine Bourail Thio Moindou La Foa Boulouparis Païta Yaté Dumbéa Ducos Prony Doniambo ILE-des-PINS Mont-Dore NOUMEA Vao z 2005 EVOLUTION de la PUISSANCE MAXIMALE appelée par la Distribution Publique 110 107,2 MW 103,8 99,9 97,5 93,0 85,7 81,9 79,5 80,4 77,2 60 95-96 96-97 97-98 98-99 99-00 00-01 01-02 02-03 03-04 04-05 COURBES des VENTES d’ENERGIE 840 790 740 690 640 605 590 548 540 490 481 440 390 340 1994-1995 1995-1996 1996-1997 1997-1998 1998-1999 1999-2000 2000-2001 2001-2002 2002-2003 2003-2004 2004-2005 Prévision moyenne 5,0% Actualisation Prévision basse 3,0% Nickel in New Caledonia : Major Players INCO: Goro Greenfield Poum 0 50 100km project in the Tiabaghi N South FALCONBRIDGE Kouaoua Thio Koniambo greenfield GORO project in the NOUMEA Project North NEW SLN ERAMET AUSTRALIA CALEDONIA Operating a NEW ZEALAND smelting plant TASMANIA & 4 mines Goro Nickel Project - Project Summary Process plant production capacity : 60 000 tons of Nickel & 5 000 tons of Cobalt / year Mining production : 4 million tons / year Investment around US $1.8 billion Approximately 2 500 created jobs (including 800 direct) Goro Nickel Project - The elements of the project • An open pit mine • A power station • An ore preparation • A port • A process plant • A camp Goro Nickel Project – A power station Prony Energies, a true Public Private Partnership PRONY ENERGIES - 2 x 50 MW 29 juin 2004 1 Shareholding PRONY ENERGIES ENERCAL 75% : ELYO 15% EEC 10% 75 % 15 % 10 % 29 juin 2004 2 2 The Project Prony Energies project aims to produce enough electricity to: ° meet the needs of increasing demand of the public distribution system, ± supply the Goro Nickel hydrometalurgical process plant with energy. The power plant is made of 2 units of 50 MW each with a possible extension of 3 more units. 29 juin 2004 3 Benefits of the joint approach -Economy of scale, allowing for a coal fired power plant, best environmental solution -Sharing of infrastructures :port, water supply, roads, camp -Remote location, away from urbanised areas -Increased reliability of supply, connection to the grid 29 juin 2004 4 The Contract -Tripartite: Prony Energies /Enercal/Goro Nickel -Support of the French Government through Tax Benefits -25 year renewable once -Take or Pay -Garanteed supply -Step in provisions 29 juin 2004 4 29 juin 2004 4.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us