ALGERIE POTENTIEL EN HYDROCARBURES RÉSERVES PAR BASSIN 50 Mds Bep 15Mbep 15 Mbep (En Mds Bep)

ALGERIE POTENTIEL EN HYDROCARBURES RÉSERVES PAR BASSIN 50 Mds Bep 15Mbep 15 Mbep (En Mds Bep)

ALGERIE POTENTIEL EN HYDROCARBURES RÉSERVES PAR BASSIN 50 Mds Bep 15Mbep 15 Mbep (en Mds Bep) 1 Mbep 10 Mbep HMD: 15 HRM: 15 3 Mbep 9 Mbep BERK.:10 ILLIZI:9 1 Mbep OMYA:1 1 Mbep 1,5 Mbep AHN.:1,5 6,5 Mds Bep TIMI.:3 SBAA:1 REGG:1 CARTE PETROLIERE DES BASSINS TOTAL: 56,5 Algeria Gas Exploration Trends (Evaluation par un opérateur indépendant) Circum HRM: Conventional Reservoir Gas Exploration Rich Gas condnesates Triassic and Palaeozoic Plays Reserve Potential 50 – 100 TCF ?? 50-70 TCFG Potential Tight Gas Exploration Potential Reserve Potential 100 – 200 TCF Berkine Basin: Rich Gas Condensates Gourara Basin: Upr Dev / Carb Ssts Dry Gas 20-70 TCFG Potential Palaeozoic plays 10-25 TCFG Pot Illizi Basin: Tindouf / Reggane Lean Gas Condensates Dry Gas C/O ssts Fault seals Deep basin and basin 10-20 TCFG potential margin Plays Ahnet Basin: 50-100 TCFG Potential Dry Gas Palaeozoic Ssts 5-25 TCF Potential RESSOURCES SPECULATIVES EN PLACE (dans le sous-sol !!!) • CONVENTIONNELLES : GAZ : SH : 2.800 à 6.000 Mds M3 PETROLE : SH : 3 Mds Tonnes HC liquides • NON CONVENTIONNELLES : - GAZ : SH : 25.000 à 140.000 Mds M3 ALNAFT : 126.000 à 168.000 Mds M3 - PETROLE : SH : 248 Mds barils (30 Mds Tonnes) ALNAFT : 170 Mds barils (24 Mds Tonnes) RESERVES RECUPERABLES : 10 à 20% ??? POTENTIEL EN GAZ DE SCHISTE Les études & travaux actuels couvrent une surface de moins de 200.000 Km2 sur une région désertique de plus d’un million Km2 SILURIEN Réf: Sonatrach FRASNIEN 17/11/2014 A. Attar 5 POTENTIEL DE GAZ EN PLACE (Ref: Sonatrach - 2013) PROSPECTIVE RESOURCES BASED ON GEOCHEMICAL MODELING: Considering that 10 to 40 % of the total volume generated from the two main source rocks (Silurian & Frasnian hot shales) remains within the shale gas plays, result in a GIIP of 2650 to 10585 Tcf range from a total generated of 26450 Tcf. Basin Gas (Tcf) Liquids (Bbbl) Ahnet 1902 Timimoun 1925 - Bechar 53 Berkine 954 215 Illizi * 106 33 TOTAL (GIIP) 4940 248 TECHNICALLY RECOVERABLE RESOURCES (TRR): By using a recovery factor of 15%, the total technically recoverables resources within the prospectives areas of the studied basins (Ahnet, Timimoun, Bechar, Berkine and Illizi) is: 4940*15%= 741 Tcf. For comparison, TRR of shale gas for the USA is : 665 Tcf (source EIA 2013). Recovery Factors: 20 to 50% for Barnett shale, 30% Haynesville shale, 20 to 40% Marcellus shale. 17/11/2014 A. Attar 26 SYSTÈME AQUIFERE DU SAHARA CENTRAL: 2 AQUIFERES DONT LES RESSOURCES SONT ESTIMEES A PLUS DE 50.000 MDS M3 D’EAU Réf: ABHS Réf: Sonatrach 17/11/2014 A. Attar 7.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us