Chichester Site Allocation Proposed Submission Development Plan Document

Chichester Site Allocation Proposed Submission Development Plan Document

Report Submitted to Submitted by Chichester District Council AECOM Scott House Alençon Link Basingstoke Hampshire RG21 7PP United Kingdom Chichester Site Allocation: Proposed Submission Development Plan Document Habitat Regulation Assessment AECOM Chichester Site Allocation Proposed Submission Page i Development Plan Document Prepared by: Isla Hoffman Heap Checked by: Dr James Riley Ecologist Associate Director Approved by: Dr James Riley Associate Director Rev No Comments Checked Approved Date by by 0 First draft for comments JR TH 22/10/15 1 Update following client and Natural England comments JR TH 20/11/15 2 Further update following addition of sites at Camelsdale and JR TH 06/05/16 Bosham 3 Minor updates to reflect Proposed Submission Local Plan IH JR 12/10/16 Midpoint, Alençon Link, Basingstoke, Hampshire, RG21 7PP, United Kingdom Telephone: 01256 310 200 Website: http://www.aecom.com Habitat Regulation Assessment 10/16 AECOM Chichester Site Allocation Proposed Submission Page ii Development Plan Document Limitations AECOM Infrastructure & Environment UK Limited (“AECOM”) has prepared this Report for the sole use of Chichester District Council Limited (“Client”) in accordance with the Agreement under which our services were performed No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by AECOM. This Report is confidential and may not be disclosed by the Client nor relied upon by any other party without the prior and express written agreement of AECOM. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information obtained by AECOM has not been independently verified by AECOM, unless otherwise stated in the Report. The methodology adopted and the sources of information used by AECOM in providing its services are outlined in this Report. The work described in this Report was undertaken between August and November 2015 and October 2016 and is based on the conditions encountered and the information available during the said period of time. The scope of this Report and the services are accordingly factually limited by these circumstances. Where assessments of works or costs identified in this Report are made, such assessments are based upon the information available at the time and where appropriate are subject to further investigations or information which may become available. AECOM disclaim any undertaking or obligation to advise any person of any change in any matter affecting the Report, which may come or be brought to AECOM’s attention after the date of the Report. Certain statements made in the Report that are not historical facts may constitute estimates, projections or other forward- looking statements and even though they are based on reasonable assumptions as of the date of the Report, such forward-looking statements by their nature involve risks and uncertainties that could cause actual results to differ materially from the results predicted. AECOM specifically does not guarantee or warrant any estimate or projections contained in this Report. Copyright © This Report is the copyright of AECOM Infrastructure & Environment UK Limited. Any unauthorised reproduction or usage by any person other than the addressee is strictly prohibited. Habitat Regulation Assessment 10/16 AECOM Chichester Site Allocation Proposed Submission Page iii Development Plan Document Contents 1 Introduction .................................................................................................................................................................. 5 1.1 Background to the Project ..................................................................................................................................... 5 1.2 Legislation ............................................................................................................................................................. 5 1.3 Scope of the Project .............................................................................................................................................. 6 1.4 This report ............................................................................................................................................................. 7 2 Methodology ................................................................................................................................................................ 8 2.1 Introduction ............................................................................................................................................................ 8 2.2 HRA Task 1 - Likely Significant Effects (LSE) ....................................................................................................... 9 2.3 Other Plans and Projects That May Act In Combination ....................................................................................... 9 3 Pathways of Impact ................................................................................................................................................... 10 3.1 Introduction .......................................................................................................................................................... 10 3.1.1 Other Relevant Supporting Spatial Studies ................................................................................................. 10 3.2 Disturbance and Recreational Pressure .............................................................................................................. 10 3.2.1 Mechanical/abrasive damage and nutrient enrichment ............................................................................... 10 3.2.2 Disturbance ................................................................................................................................................. 11 3.3 Atmospheric Pollution .......................................................................................................................................... 14 3.4 Water Abstraction ................................................................................................................................................ 14 3.5 Water Quality ....................................................................................................................................................... 15 3.6 Coastal Squeeze ................................................................................................................................................. 15 3.7 Loss of Habitats Outside of European Sites ........................................................................................................ 16 3.8 Summary ............................................................................................................................................................. 16 4 Chichester and Langstone Harbours SPA and Ramsar site/Solent Maritime SAC .............................................. 17 4.1 Introduction .......................................................................................................................................................... 17 4.2 Features of European Interest ............................................................................................................................. 17 4.2.1 Chichester and Langstone Harbours SPA .................................................................................................. 17 4.2.2 Chichester and Langstone Harbours Ramsar ............................................................................................. 18 4.2.3 Solent Maritime SAC ................................................................................................................................... 19 4.3 Historic Trends and Current Conditions............................................................................................................... 19 4.4 Key Environmental Conditions ............................................................................................................................ 20 4.5 Potential effects of the Plan ................................................................................................................................. 20 4.5.1 Proposed housing sites ............................................................................................................................... 20 4.5.2 Proposed employment sites ........................................................................................................................ 28 5 Pagham Harbour SPA and Ramsar .......................................................................................................................... 35 5.1 Introduction .......................................................................................................................................................... 35 5.2 Features of European Interest ............................................................................................................................. 35 5.3 Historic Trends and Current Pressures ............................................................................................................... 36 5.4 Key Environmental Conditions ...........................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    68 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us