Community Network Scheme Programme - Last Update: CORMAC 01/06/2021

Community Network Scheme Programme - Last Update: CORMAC 01/06/2021

Information Classification: CONFIDENTIAL# Community Network Scheme Programme - Last update: CORMAC 01/06/2021 Liskeard & Looe CNA RAG Scheme Amber Network Community Status Estimated Scheme Brief Current Status Year Proposed Estimated Delivery Scheme Value Committed/ Green) Ref Issued to (0 not started 9 scheme Parish Local Member Scheme Title Risk Comment Area (1-4) Consultation Date Start Date (£) from CNP Completed (£) CORMAC complete) (Red No Scheme Brief Lanteglos Highway - gateway signing and road Liskeard & Looe Lanteglos-by-Fowey Edwina Hannaford L&L03 1 25/02/2019 9. Scheme Complete N/A Sep-19 6,000 2,520 markings Liskeard & Looe Lansallos / Polperro Edwina Hannaford L&L04 Polperro signing and lining 1 25/02/2019 9. Scheme Complete N/A Aug-19 3,000 3022 Liskeard & Looe St Cleer Martin Eddy L&L07 Clairemont Place installation of bollards 1 25/02/2019 9. Scheme Complete N/A May-19 1,000 1,480 Liskeard & Looe Menheniot Phil Seeva L&L09 Doddycross removal of island 1 25/02/2019 9. Scheme Complete N/A Apr-19 2,000 1,520 Barbican Road - Install flashing Wig-Wag signs 9000 (initial Liskeard & Looe Looe Armand Toms L&L14 1 25/02/2019 9. Scheme Complete N/A Jul-19 4,004 Scheme change from permanent VAS scheme) 2774 for L&L15, 32, Liskeard & Looe Deviock Richard Pugh L&L15 Downderry stores - TRO 1 25/02/2019 9. Scheme Complete Apr-19 Sep-19 500 34, 35 Liskeard & Looe Deviock Richard Pugh L&L17 Seaton Beach - widen footway 1 25/02/2019 9. Scheme Complete N/A Jul-19 12,000 8,773 Scheme was due to be completed by developer but developer has apparently gone into administration. Liskeard & Looe Morval Richard Pugh L&L22 A387 Widegates - Extend 30mph limit 1 25/02/2019 Withdrawn from CNP Process Investigation underway to determine if bond can be Apr-19 N/A 5,000 0 released. CC Highway Estates to take forward, outside of CNP process Liskeard & Looe Dobwalls & Trewidland Jane Pascoe L&L25 Dobwalls installation of VAS 1 25/02/2019 9. Scheme Complete N/A Sep-19 9,000 6,866 *Difference between initial estimated cost and design stage cost because part of the scheme (renew warning signs) has Liskeard & Looe Duloe Richard Pugh L&L27 Tredinnick pedestrian warning signs 1 25/02/2019 9. Scheme Complete N/A Jul-19 750 198 been completed via highway maintenance/ revenue programme Liskeard & Looe Duloe Richard Pugh L&L28 Duloe bus stop road markings 1 25/02/2019 9. Scheme Complete N/A Jul-19 1,000 1,209 Existing road markings were renewed via highway Liskeard & Looe Duloe Richard Pugh L&L29 Duloe SLOW road markings 1 25/02/2019 Scheme Abandoned N/A N/A 500 0 maintenance / revenue programme Liskeard & Looe Duloe Richard Pugh L&L30 Duloe pedestrian warning signs 1 25/02/2019 9. Scheme Complete Completed outside of CNP programme. N/A N/A 750 0 Liskeard & Looe Deviock Richard Pugh L&L32 West Camps Bay TRO 1 25/02/2019 9. Scheme Complete Apr-19 Sep-19 1,500 as per L&L15 Liskeard & Looe Deviock Richard Pugh L&L34 Downderry Parking TRO 1 25/02/2019 9. Scheme Complete Apr-19 Sep-19 1,500 as per L&L15 Liskeard & Looe Deviock Richard Pugh L&L35 Tregunnick Lane Seaton TRO 1 25/02/2019 9. Scheme Complete Apr-19 Sep-19 1,500 as per L&L15 *28,000 CNP/ 47,000 S106 contribution **feasibility design and costings provided in November Nick Craker/ Jane 2020 Liskeard & Looe Liskeard L&L01 West Street & Old Road, Liskeard 2 06/12/2019 5. Detailed Design Feb-21 Oct-21 28,000 28,000 Pascoe 03/12/20 CNP members agree recommendations to be taken forward. To be coordinated with CC Transport schemes Holland Road No Man's Land nr Looe - waiting Liskeard & Looe St Martin by Looe Armand Toms L&L05 3 06/12/2019 5. Detailed Design Aug-20 Jul-21 1,000 2871 restrictions Liskeard & Looe St Martin by Looe Armand Toms L&L06 Holland Road No Man's Land nr Looe - footway 3 06/12/2019 9. Scheme Complete N/A Feb-21 7,500 15,296 Liskeard & Looe Liskeard Nick Craker L&L10 Barras Place Liskeard - footway 2 06/12/2019 9. Scheme Complete Scheme to be completed in coordination with surfacing work N/A Oct-20 15,000 6117 Proposed location for VAS not thought viable by electrical Sandplace Road, Looe - VAS Liskeard & Looe Looe Armand Toms L&L11 3 06/12/2019 9. Scheme Complete contractor, therefore scheme changed to sign and road N/A May-21 10,000 3322 (revised scheme - signs and road markings) markings scheme Liskeard & Looe Pelynt Richard Pugh L&L18 Pelynt - pedestrian refuge 2 06/12/2019 9. Scheme Complete *12,500 scheme - 10,000 CNP/ 2,500 Parish Council N/A Sep-20 10,000 9248 Liskeard & Looe Liskeard Jane Pascoe L&L23 Gipsy Lane, Liskeard - Prohibition of motor vehs 2 06/12/2019 5. Detailed Design Aug-20 Jul-21 2500 2965 Liskeard & Looe Deviock Richard Pugh L&L36 Keveral junction, Seaton - waiting restrictions 3 06/12/2019 5. Detailed Design Aug-20 Jul-21 1500 1724 Broads Yard, Trerieve, Top Road, Downderry - Liskeard & Looe Deviock Richard Pugh L&L37 3 06/12/2019 5. Detailed Design Aug-20 Jul-21 1500 1811 waiting restrictions Liskeard & Looe Duloe Richard Pugh L&L39 Whitton Cottages, Duloe - bend warning signs 2 06/12/2019 9. Scheme Complete N/A Oct-20 500 444 Liskeard - waiting restrictions at x9 sites/ Liskeard & Looe Liskeard Various L&L41 2 06/12/2019 5. Detailed Design Aug-20 Jul-21 7500 20048 prohibition of motor vehicles at x1 site. Liskeard & Looe Morval Richard Pugh L&L44 Widegates 30mph speed limit extention 3 06/12/2019 5. Detailed Design Aug-20 Jul-21 5000 4716 St Cleer speeding - erection of posts for Liskeard & Looe St Cleer Martin Eddy L&L45 2 06/12/2019 9. Scheme Complete N/A Sep-20 2500 1123 deployment of MVAS Liskeard & Looe St Martin by Looe Armand Toms L&L46 Millendreath - waiting restrictions 3 06/12/2019 5. Detailed Design Aug-20 Jul-21 5000 7102 Liskeard & Looe St Neot Martin Eddy L&L47 St Neot School 20mph speed limit 3 06/12/2019 5. Detailed Design Aug-20 Jul-21 5000 12,228 for L&L47, 51, 52 Liskeard & Looe St Neot Martin Eddy L&L50 Loveny Road St Neot - install new streetlight 3 06/12/2019 9. Scheme Complete N/A Sep-20 2000 3120 Liskeard & Looe St Neot Martin Eddy L&L51 Tripp Hill St Neot relocation of speed limit 3 08/01/2020 5. Detailed Design Aug-20 Jul-21 2500 As per L&L47 Liskeard & Looe St Neot Martin Eddy L&L52 Loveny Road St Neot - waiting restrictions 3 06/12/2019 5. Detailed Design Aug-20 Jul-21 1500 As per L&L47 Liskeard & Looe Warleggan Martin Eddy L&L53 Mount - safety message and road markings 3 06/12/2019 9. Scheme Complete N/A Oct-20 2000 1121 Duloe Gateway signing - from Liskeard Liskeard & Looe Duloe Richard Pugh L&L60 4 07/12/2020 9. Scheme Complete N/A May-21 500 500 direction Duloe Gateway signing - from Dobwalls Liskeard & Looe Duloe Richard Pugh L&L61 4 07/12/2020 9. Scheme Complete N/A May-21 500 500 direction Liskeard & Looe Lanreath Richard Pugh L&L63 Meadow Road Lanreath speed limit extension 4 07/12/2020 2. Preliminary Design Jul-21 Feb-22 4000 3,991 Morrisons/Bubble Retail Park roundabout, Liskeard & Looe Menheniot Phil Seeva L&L65 4 07/12/2020 2. Preliminary Design Jul-21 10,000 10,000 Liskeard/Menheniot - new footway Liskeard & Looe Menheniot Phil Seeva L&L66 Doddycross road village entry signing 4 07/12/2020 6. Programming N/A Jun-21 1000 1000 Liskeard & Looe St Neot Martin Eddy L&L71 St Neot warning signs and markings 4 07/12/2020 9. Scheme Complete N/A May-21 1000 1000 Liskeard & Looe St Pinnock Phil Seeva L&L72 A390 East Taphouse VAS 4 07/12/2020 9. Scheme Complete N/A Apr-21 9000 8914 Sandplace Road/St Martins Hill, Looe - Liskeard & Looe Looe Armand Toms L&L73 4 07/12/2020 1. Scheme Inception Jul-21 Feb-22 4000 7,234 prohibition of left turn Tower Hill with Higher Market Street, Looe Liskeard & Looe Looe Armand Toms L&L76 4 07/12/2020 6. Programming N/A Jun-21 250 250 road markings Liskeard & Looe Looe Armand Toms L&L77 Fore Street East Looe signing review 4 07/12/2020 2. Preliminary Design Options to be reported July 2021 5,000 5,575 Liskeard & Looe Looe Armand Toms L&L78 Riverside Arcade, West Looe pedestrian signing 4 07/12/2020 Scheme Abandoned Private land - scheme not viable N/A N/A 500 0 Redgate bus stop footings and vegetation Liskeard & Looe St Cleer Martin Eddy L&L79 4 07/12/2020 6. Programming N/A Jun-21 3000 3000 clearance 195,586 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us