East Side Access -Historic Biltmore Room Manhattan, New York

East Side Access -Historic Biltmore Room Manhattan, New York

East Side Access -Historic Biltmore Room Manhattan, New York The $3.5 billion East Side Access Project is a new rail link which will greatly improve access to Manhattan’s East Side for commuters in the Long Island Transportation Corridor. This rail link will connect the LIRR’s Port Washington and Main Line tracks to a proposed deep terminal in Grand Central Station below the existing lower track levels. Naik Consulting Group, PC (NAIK) provides surveying and mapping support under contract to the General Engineering Consultant (GEC) for the project. Under this contract numerous individual survey tasks have been performed in support of the on-going final design. This project task involved providing a complete topographic, structural and architectural as-built survey of the historic Biltmore Room, the Urban and Suburban Levels below it located within Grand Central Terminal, and the parking garage and former Bally’s Health Club adjacent to it to the west. This survey was in support of the design of new escalators into the Biltmore Room from the new LIRR Concourse The topographic and architectural survey was performed using a Leica C10 time-of-flight laser scanner. The scans were run at medium resolution collecting approximately 11 million points of data in about 4 minutes per scan. The level of detail captured in the scan data can be seen at the left in RGB and greyscale. During the scanning operations digital color photography was captured using a high resolution Canon digital SLR camera coupled with the scanner’s position. This digital imagery was incorporated into the scan data assigning RGB color values on each point and allowing the point cloud to be visualized in true color. As a by- product, QuickTime VR and Flash movie files were generated for easy review by downstream users without the need for specialized software. All data was post-processed in Leica Cyclone. 3D CADD files were generated in Microstation v8 2004 for delivery to project design staff. Agency/Owner: MTA / Long Island Rail Road Construction Cost: $3.5 Billion Project Duration: March - June 2009 www.naikgroup.com New York, New Jersey, Pennsylvania .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us