Parc Laroche Park

Parc Laroche Park

Parc Laroche Park Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Laroche Park Mechanicsville Community Ottawa Park Renewal Project Presentation July 25th, 2018 City of Ottawa Recreation, Culture and Facilities Services Parks and Facilities Planning Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Welcome and introduction Project team Background Opportunities Environmental Risk Management Plan Previous Investigations Recent Investigations Recommendations Park Master Plan Contextual Plan Existing Site Existing Constraints Park Amenities Project scope and Design Option 1/ Option 1 and existing Option 2/ Option 2 and existing Community Building Concepts Program Breakdown Option 1 Option 2 Process and Community Consultation Laroche Park - Heart of the Mechanicsville Community Q & A Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Project team City of Ottawa Parks and Facilities Planning - Recreation, Culture and Facilities Services Infrastructure Services - Landscape Architecture, Architecture, Engineering Planning and Infrastructure Services and Economic Development Environmental Remediation Unit - Corporate Services Planning Approvals - Planning and Infrastructure Services and Economic Development Asset Management /Forestry Management Branch/Parks and Grounds Public Works and Environmental Services Ward Councillor External Consulting team Ruhland Landscape Architecture and Associates, Colizza Bruni Architects, jp2g Engineering, Wood PLC (Environmental Remediation). Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Background 1929 1965 1991 Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Laroche Park in 2018 Location: Ward 15 Address: 51 Stonehurst Avenue Size: 2.5 Ha (6.3 acres) Park amenities : Play ground, Splash pad, benches, gazebo, swings, sand play, trees Recreation facilities: 2 Baseball diamonds (one in use, one to be decommissioned) Basketball Court Full boarded seasonal rink with lighting Community building/field house Storage Shed Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Planning Studies, Design Plans and Secondary Plans Neighbourhood Plan Hintonburg and Mechanicsville - City of Ottawa 2010 Wellington Street West Community Design Plan – City of Ottawa 2011 Bayview Station District Community Design Plan - City of Ottawa 2013 Bayview Station Secondary Plan City of Ottawa- City of Ottawa (Amendment) 2015 Scott Street Community Design Plan - City of Ottawa 2014 Scott Street Secondary Plan - City of Ottawa 2014 Sir John A. MacDonald Riverfront Park – National Capital Commission January 2018 Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Opportunities • Enhance existing park amenities and recreation facilities • Provide programming and functional space for existing and future community needs • Reflect the community historical and geographical assets and provide sustainable, energy efficiency and beautiful design • Improve environmental conditions and landscaping and drainage issues inherited from past land-use legacy • Provide connectivity to and through the park • Provide connectivity from park to proposed pathway system and waterfront / from parkway into the community • Create visual linkages to river and proposed river activities (NCC- boardwalk, new public spaces, portage route) • Acknowledge historical references to the areas early natural and human history • Acknowledge the community’s commercial, industrial and cultural history Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Environmental Risk Management Plan for Park Improvements Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Previous Investigations • The southeast portion of the park was identified as a historic landfill site in the 2004 Old Landfill Management Strategy report, Phase 1 – Identification of Sites • Landfilling activities were reportedly limited to the location of the old septic tank which was infilled between 1928 and 1932 • An investigation completed in the southeast portion of the site in 2005 did not identify any immediate concerns related to the old landfill Laroche Park - 1927 Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Recent Investigations • To support potential redevelopment of the park, a site-wide environmental assessment was completed in 2014-15. The results indicated that waste fill was present across the entire park. • Additional historical research indicated that the “Stonehurst Ave Dump” operated during the 1910s to 1923 and likely infilled the former Cave Creek • Waste material contains ash, cinders, glass, metal, brick and porcelain. • Samples from the playground sand and shallow soil in the north half of the site met provincial standards for parkland use; underlying waste fill exceeds for various metals and PAHs Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Recommendations • The City is planning to implement a risk management program to isolate the underlying impacted fill across the park • Designed to prevent direct contact with the underlying fill using an approach referred to as ‘soil capping’. Involves placement of 0.5 m of clean imported soil placed over a geotextile fabric. • City will retain an environmental consultant to be on-site for the duration of the soil excavation and capping portion of the project. • A dust control plan and traffic management plan will be developed. • Site will be routinely inspected following completion to ensure integrity of soil cap. Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 Park Master Plan Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 R E S V I I A R U O W A A HOLOCAUST O T T A T CANADIAN U O WAR MUSEUM MONUMENT E S MUSÉE CANADIEN MONUMENT de R D I V I È R E de la GUERRE l'HOLOCAUSTE PARC PARC LeBRETON PARK PINDIGEN PARC des Plaines-LeBRETON PARK ÎLE LEMIEUX ISLAND PLAINES LEBRETON FLATS R u Y e BA N ay B EA itw o EP ns o N ra IE T th BA S t ys r R thwa les e u le Pa clab e e Cyc et cy t an / iers O estri tonn n Ped s pié B ig ntier AIE h Se ay LA a w et ZY B m rk e AY Pa tr S ald S t cDon rt re hn A Ma be e enade Sir Jo Al Future NCC t Prom e Ru LITTLE ITALY Pathway Link OTTAWA INNOVATION CENTRE Station d'eO l-'TOr-aTirna in PETITE ITALIE Futur raccord de P CENTRE d'INNOVATION d'OTTAWA r e sentier de la CCN BAYVIEW s to CCN e SOUTH/SUD n nu R ve ue COURS S A B t ide ay O-Train Station r rns vie BAYVIEW e Bu PARC w R e nue oad YARDS t Ave LAROCHE ARÈNA C O L I Z Z A B R U N I a r c h i t e c t u r e A v ay TOM BROWN O e PARK tw -T t si r s S n t a ue MECHANICSVILLE a ARENA s i O t r n t/ o T e es u W n eet e O tr / S PARC h t et s s u er PLOUFFE e m r So s W e PARK u t t R A A e TUNNEY'S PASTURE v e v r e e t n n t S PRÉ TUNNEY e u u re e e t n S o tt B P o t c g a a S y e NORTH HINTONBURG NORD n r i s u l k R l w d e a a W t l e e e r A u A v v R e e n n u u e e CONTEXTUAL PLAN - PLAN CONTEXTUEL Laroche Park - Renewal Project - 25 July 2018 Parc Laroche - projet de renouvellement - 25 juillet 2018 1 . W 8 O H O I G D H T L O A R H D P E T T Y S C S B H A A H G M K D P OTTAWA INNOVATION M O O 2.1 HIGH 0 D N R A 2 0 F E 0 A A H 1 0 5 0 5 X 3 E 5 O S 1 1 S 5 S 5 2 7 X NTRE A R D X X CE . A R H X 2 0 X 8 B E 57 E 0 2 2 G 0 E O 2 L M L W 2 0 2 M 5 57 S / 2 2 2 N 6 2 N E R M D 2 1 L I 57 = O 57 B 1 0 B T 2 0 R T D R H R A 7 E R 57 V A G 2 57 E U 2 4 57 8 1 0 E Y O G E 57 8 E O I 4 T 57 1 6 N 2 W O 4 H H 7 0 I 1 2 L R H F D5 1 T 5 C H 1 1 C 3 5 I 2 E C S C R F 3 I 0 O 5 0 2 . 0 7 L N W N B A 6 2 2 O N R 1 N / O G 4 2 2 L CENTRE A S E 4 T O O C 2 0 5 E I N L L L I 2 5 R 3 2 M C 2 B P N H 1 T BENCH E W 2 O M A S M L B S ALL DIAMOND G T d'INNOVATION C L H S S C R G L W BACK S H TOP H 0 N N 3 E 7 A I E M B 5 R L D G O R d'OTTAWA L E T N BLEACHERS I E I I S BLEACHERS R N N I W 0 5 O O 1 S 1 T M L I L N E V GRADINS O W Y M 2 1 S A R H G I E H S 8 E 0 H B .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    29 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us