NPH, ERC Case No. 2016-162 RC

NPH, ERC Case No. 2016-162 RC

" r_\)l.ATOR'r-C'~~ '(,.u ., c;\~ v1.~i"-~ 'l Aooroved for % ; Li..J I 1. :z: J Posting Republic of the Philippines ,\ www.erc.gov.ph ENERGY REGULATORY COMMISSION- W 12r",) 1,'1 San Miguel Avenue, Pasig City ~ IN THE MATTER OF THE APPLICATION FOR THE APPROVAL OF EMERGENCY CAPITAL EXPENDITURE PROJECTS 2015-2016 OF LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V) WITH AUTHORITY TO SECURE LOAN AND MOTION FOR THE ISSUANCE OF PROVISIONAL 'AUTHORITY, ERC CASE NO. 2016 -162 RC LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECOV), Applicant. )(-------------------------------------)( NOTICE OF PUBLIC HEARING TO ALL INTERESTED PARTIES: Notice is hereby given that on 18 August 2016, Leyte V Electric Cooperative, Inc. (LEYECO V) filed an Application (With Motion for the Issuance of Provisional Authority) seeking the Commission's approval of its Emergency Capital Expenditure (CAPEX) Projects for 2015-2016, with authority to secure loan. LEYECO V alleged the following in its Application: I. THE APPLICANT 1. The applicant, LEYECO V is a non-stock, non-profit Electric Cooperative duly organized and existing under and by virtue of the Presidential Decree 269, as amended, with capacity to sue and be sued, with principal office address at San Pablo, Ormoc City, Leyte where it may be served with summons and ERC CASE NO. 2016-162 RC ORDER/ 8 DECEMBER 2016 PAGE20F13 NO.125 series of 2015 dated November 30, 2015, copy of which is hereto attached as "Annex A". 2. Herein applicant is the exclusive franchise holder issued by the National Electrification Administration (NEA) to operate an electric light and power services in the City of Ormoc and 11 municipalities in the 3rd & 4th Congressional Districts of Leyte Province. A copy of Applicant LEYECO Vs Certificate of Franchise is hereto attached as "Annex B" • II. THE ANTECEDENT FACTS 3. Prior to this filing, applicant's Capital Expenditure Projects under its 2011-2015 Distribution Development Plan (DDP) was approved by the Honourable Commission through ERC promulgated Decision dated April 13, 2015 under ERC Case No. 2011-136 RC. 4. The aforementioned ERC Decision has confirmed some of the CAPEX projects funded through National Electrification Administration (NEA) fund subsidy for Yolanda Recovery Rehabilitation Plan (YRRP); other proposed CAPEX projects were approved for acquisition and commissioning; and several projects were deferred; 5. This Application covers the items of CAPEX projects 2011- 2015 that though deferred by the Honourable Commission, but due to present existing circumstances, are badly needed to be a,cquired and commissioned on the year 2015 to 2016, details of which are as follows: PROJECT PROJECT 2015 2016 TOTAL CODE DESCRIPTION Network Pro'ects (Substation Development Plan) (NP-SDP) NP-SDP-01 New 20M VA Ormoc 18,900,000 23,000,303 41,900,303 Substation New 10 M VA Palompon 13,200,000 28,334,303 41,534,303 Substation NP-SDP- Construction of 69kV 4,635,540 1,986,660 6,622,200 02 Line for the Proposed 10 M VA Palompon Substation . Non-Network Project (NNP) NNP-01 Accounting 3,388,000 3,388,000 Computerization System NNP-02 Reliability Analysis 240,000 240,000 Software NNP-03 Short Circuit Analysis 356,000 356,000 Software TOTAL PROJECT COST 53,321,266 94,040,80~ 40,719,540 ~ (j ERC CASE NO. 2016-162 RC ORDER/ 8 DECEMBER 2016 PAGE 3 OF 13 6. On January 14, 2016 herein Applicant filed similar case before the Honorable Office of Energy Regulatory Commission (ERC) docketed as ERC Case No. 2016-004 RC. During the scheduled Public Hearing of the aforementioned case on August 9, 2016, the said ERC Case No. 2016-004 RC was ruled as non-compliant with the ERC Order dated 21 June 2016 with respect to jurisdictional requirement specifically on: "the publication of the Notice of Public Hearing in two (2) newspapers of general circulation in the Philippines, twice (2X) within two (2) successive weeks, the dates of publication mot being less than seven (7) days apart, ..." Though Applicant LEYECO V made the publications in two (2) national newspapers; but, the dates of publications were only five (5) days apart, contrary to the directive of seven (7) days apart; and some certifications issued by LGUs have no seal mark. Despite the manifestations and appeal for reconsideration by herein Applicant, the ERC through its Hearing Officer ruled otherwise, dismissing the ERC Case No. 2016-004 RC for non-compliance to jurisdictional requirement. However, the ERC Hearing Officer, in open court, had advised the Applicant LEYECO V to re-file the case the soonest possible time. Hence, herein Applicant LEYECO V is respectfully re-filing this similar case, as captioned above, for approval of its Emergency Capital Expenditure (CAPEX) Projects 2015-2016 implementation, with Authority to Secure Loan and Motion for the Issuance of Provisional Authority. III. LEGAL BASIS FOR THE APPLICATION 7. This emergency CAPEX Application is in compliance to Resolution No. 26, series of 2009, "A Resolution Amending the Rules for the Approval of Regulated Entities' Capital Expenditure Projects" adopted by the Energy Regulatory Commission (ERC) pursuant to Section 43 of the Republic Act No. 9136, otherwise known as the Electric Power Industry Reform Act of 2001 (EPIRA), and its implementing Rules and Regulations, in relation to ERC Resolution No. 20, series of 2010, which categorically provides that all capital expenditure projects shall be submitted for approval of the Honourable Commission prior to their implementation. 8. Moreover, the prayer seeking for authority to secure loan from the Honourable Commission, to finance the aforementioned Emergency CAPEX, is being filed pursuant to the power of ERC mandated under Section 20, parag. (g) of the Commonwealth Act Bo. 146, known as The Public Service Law. IV. STATEMENT OF FACTS OF LEYECO V's DISTRIBUT.l4~ SYSTEM /;::5 ERC CASE NO. 2016-162 RC ORDER/ 8 DECEMBER 2016 PAGE40F13 9. Though LEYECO V's Distribution System was devastated by super typhoon Yolanda last November 8, 2013, most of its facilities were already restored through the help of the National Electrification Administration (NEA) under its Yolanda Restoration and Rehabilitation Program (YRRP). 10. And on April 13, 2015, the ERC has granted the go signal to herein Applicant LEYECO V to proceed with the acquisition and implementation of some its proposed 2011-2015 CAPEX projects, re: reclosers; power capacitor; renovation of engineering building; procurement of service utility vehicles; procurement of hydraulic boom trucks; procurement of tools and equipment. However, other proposed 2011-2015 CAPEX projects were deferred and suggested to be included in the next CAPEX proposal for 2016-2020. 11. At present, some households and establishments which were affected by super typhoon Yolanda, have now re-applied for power connections to LEYECO V's distribution system, and consequently power demands are rapidly increasing within the franchise of LEYECO V. Please see LEYECO V System Energy (kWh) Sales Forecast in 2016 to 2028, "Annex C". 12. Recent assessment and evaluation of LEYECO V's existing loading and available substation capacity showed that its 20MVA Substation in Ormoc City is critically loaded up to 95.70% this year 2015. The situation of the power transformer is at the critical level, wherein at any time soon, it could be busted considering the growing demand in Ormoc City. Moreover, the Tabango Sub-station which has a present load of 66.17% will surely exceed the 70% loading criterion come 2016. Please see Substation Capacity Analysis, "Annex D". 13. Hence, to avoid power interruptions and accommodate rapidly increasing power demands from existing and new consumers, the aforementioned proposed Emergency CAPEX Network Projects are needed and must be implemented this 2015-2016. 14. On the other hand, LEYECO V is at present encountering difficulties in restoring its computerization system, after the same was struck and destroyed by super typhoon Yolanda on November 8,2013. In fact, Applicant is relying at present on its old and almost obsolete 1998 Manual Accounting System. Thus, the proposed procurement of Accounting Computerized System Software & Hardware. 15. Since then, LEYECO V has no reliability software that can be used to simulate its system performance. Manual assessment of its system's reliability was so tedious considering that LEYECO V distribution line is composed of thousands of nodes. Thus, the proposed acquisition of 'Reliability Analysis Software' will enable the Applicant to accurately Simulate~ ERC CASE NO. 2016-162 RC ORDER/ 8 DECEMBER 2016 PAGES OF 13 system's reliability performance and comply its multi-year CAPEX application within the timeline. 16. Likewise, LEYECO V has no short circuit analysis software that can be used to simulate its system's safety performance. Again, the proposed acquisition of 'Short Circuit Analysis Software' would enable the Applicant to accurately do simulation test and processes, and readily comply its multi- year CAPEX preparation. v. URGENCY OF THE PROPOSED CAPEX 2015-2016 ACQUISITION 17. The instant Application requesting immediate acquisition and commissioning of aforementioned 'Emergency CAPEX Projects 2015-2016' is actually a remedial action/solution proposed by applicant, LEYECO V to avert impending busting of its Ormoc City Sub-Station due to overloading, which at present already exceeds the 70% capacity limit. Likewise, the proposal if granted will avoid the overloading of LEYECO V's Palompon Sub-Station, and maintain compliance of performance standard criteria required under Philippine Distribution Code (PDC) and the safety standards of the Philippine Electrical Code (PDC). 18. The proposed Non-Network projects are equally urgent for acquisition and implementation, for LEYECO V to improve its service efficiency and to accurately simulate its complicated Distribution System. The same are necessary in the preparation of LEYECO V's multi-year CAPEX projects and in periodic evaluation & analysis of its Distribution System.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us