Newmont Boddington Gold Closure Plan

Newmont Boddington Gold Closure Plan

Newmont Boddington Gold Closure Plan M70/21, M70/22, M70/23, M70/24, M70/25, M70/564, M70/799, M70/1031, ML264SA(1), ML264SA(2), G70/215, G70/218, G70/219, L70/28, L70/95, L70/96 Submission Date December 2012 Version Number CR35945 Contact Details Javier Brodalka, Environment Manager Phone: (08) 9883 4251 Email: [email protected] Date Revision Description of Originator Reviewer(s) Approval Revision December ‐ ‐ K. De Sousa M. Durack, S. J. Brodalka 2012 Myles, R. Kok, A. James Newmont Boddington Gold – Closure Plan Closure Plan Checklist No. Mine Closure Plan Checklist Y/N/NA Section Comments 1 Has the Checklist been endorsed by a senior Y Checklist representative within the tenement holder/ operating company? 2 How many copies were submitted to DMP? Hard copies = 2 Electronic copies = 1 Cover Page, Table of Contents 3 Does the cover page include: Y Cover Page Project title Company name Contact details (including telephone numbers and email addresses) Document ID and version number Date of submission 4 Has a Table of Contents been provided? Y Table of Contents Scope and Project Summary 5 State why the MCP is submitted. Y 1.2 6 Does the project summary include: Y Section 2 Land ownership details 2.2 Location of the project 2.1 Comprehensive site plans 2.4 Background information on the history 2.3 and status of the project Legal Obligations and Commitments 7 Has a consolidated summary or registers of Y Section 3 Appendices 1‐3 closure obligations and commitments been included? Data Collection and Analysis 8 Has information relevant to mine closure been Y Section 4 Appendices 4 ‐ 8 collected for each domain or feature (including pre‐mining baseline studies, environmental and other data)? 9 Has a gap analysis been conducted to determine Y 4.4 if further information is required in relation to closure of each domain or feature? Stakeholder Consultation 10 Have all stakeholders involved in closure been Y 5.1 identified? 11 Has a summary or register of stakeholder Y 5.2 consultation been provided, with details as to who has been consulted and the outcomes? Final Land Use(s) and Closure Objectives 12 Does the MCP include agreed post‐mining land Y Section 6 use(s), closure objectives and conceptual landform design diagram? i Newmont Boddington Gold – Closure Plan Closure Plan Checklist No. Mine Closure Plan Checklist Y/N/NA Section Comments 13 Does the MCP identify all potential (or pre‐ Y Section 6 existing) environmental legacies, which may restrict the post‐mining land use (including contaminated sites)? Identification and Management of Closure Issues 14 Does the MCP identify all key issues impacting Y Section 7 Appendix 11 mine closure objectives and outcomes? 15 Does the MCP include proposed management or Y Section 7 mitigation options to deal with these issues? 16 Has the process, methodology and rationale been Y Section 7 provided to justify identification and management of the issues? Closure Criteria 17 Does the MCP include an appropriate set of Y Section 8 specific closure criteria and/or closure performance indicators? Closure Financial Provisioning 18 Does the MCP include costing methodology, Y Section 9 assumptions and financial provision to resource closure implementation and monitoring? 19 Does the MCP include a process for regular Y Section 9 review of the financial provision? Closure Implementation 20 Does the reviewed MCP include a summary of Y 10.2 closure implementation strategies and activities for the proposed operations or for the whole site? 21 Does the MCP contain a closure work program Y 10.3 for each domain or feature? 22 Have site layout plans been provided to clearly Y 10.1 show each type of disturbance? 23 Does the MCP contain a schedule of research and Y 10.3 trial activities? 24 Does the MCP include a schedule of progressive Y 10.3 rehabilitation activities? 25 Does the MCP include details of how unexpected Y 10.3 closure and care and maintenance will be handled? 26 Does the MCP contain a schedule of Y 10.3.5 decommissioning activities? 27 Does the MCP contain a schedule of performance Y Section 11 monitoring and maintenance activities? Closure Monitoring and Maintenance 28 Does the MCP contain a framework, including Y Section 11 methodology, quality control and remedial strategy for closure performance monitoring including post‐closure monitoring and maintenance? ii Newmont Boddington Gold – Closure Plan Table of Contents Table of Contents 1 Scope and Purpose ....................................................................................................................... 1‐1 1.1 Scope .................................................................................................................................... 1‐1 1.2 Purpose ................................................................................................................................ 1‐1 1.3 Structure .............................................................................................................................. 1‐2 1.4 Closure Planning Framework ............................................................................................... 1‐3 1.4.1 Closure Review Technical Team ................................................................................... 1‐3 1.4.2 Closure Plan Review Process ........................................................................................ 1‐4 1.4.3 Schedule ....................................................................................................................... 1‐4 2 Project Overview .......................................................................................................................... 2‐1 2.1 Project Location and Tenure ................................................................................................ 2‐1 2.2 Land Ownership ................................................................................................................... 2‐1 2.3 Project History ..................................................................................................................... 2‐2 2.4 Overview of Operations ....................................................................................................... 2‐3 2.4.1 Open Pit Mines ............................................................................................................. 2‐4 2.4.1.1 Wandoo North and South Open Pits ....................................................................... 2‐4 2.4.1.2 Satellite Open Pits .................................................................................................... 2‐4 2.4.2 Jarrah Decline ............................................................................................................... 2‐4 2.4.3 Waste Rock Landforms ................................................................................................ 2‐5 2.4.3.1 Waste Rock Landforms 7, 8, 9, 10, 11 and 12 .......................................................... 2‐5 2.4.3.2 Q3 Waste Rock Landform ........................................................................................ 2‐5 2.4.4 ROM Pad and Medium Grade Ore Stockpile ............................................................... 2‐5 2.4.5 Primary Crusher ........................................................................................................... 2‐6 2.4.6 Conveyor Corridor ........................................................................................................ 2‐6 2.4.7 Processing Plant ........................................................................................................... 2‐6 2.4.8 Residue Disposal Areas ................................................................................................ 2‐6 2.4.8.1 R4 RDA ...................................................................................................................... 2‐7 2.4.8.2 F1/F3 RDA ................................................................................................................ 2‐7 2.4.8.3 Future RDA ............................................................................................................... 2‐8 2.4.9 Water Storage Reservoirs and Dams ........................................................................... 2‐8 2.4.10 Support Infrastructure ................................................................................................. 2‐8 2.4.11 Accommodation Village ............................................................................................... 2‐9 3 Closure Obligations and Commitments ....................................................................................... 3‐1 3.1 Legislation ............................................................................................................................ 3‐1 3.1.1 Mining Act 1978 ........................................................................................................... 3‐1 3.1.2 Environmental Protection Act 1986 ............................................................................. 3‐2 3.1.3 Contaminated Sites Act 2003 ....................................................................................... 3‐3 3.1.4 Environmental Protection and Biodiversity Conservation Act 1999 ........................... 3‐3 3.2 Guidelines ............................................................................................................................ 3‐3 3.3 Regulatory Approvals ..........................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    299 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us