Lanarkshire Supplier Event

Lanarkshire Supplier Event

Lanarkshire Supplier Event NLC City Deal Infrastructure Programme Shirley Linton: Head of Planning & Regeneration 6th November 2015 North Lanarkshire City Deal Infrastructure Programme • Total capital investment of £172.5m over the next 10 years; • Dedicated in-house design & programme team; • Economic drivers for NLC’s Infrastructure Programme: • exploit existing road transportation links; • support stalled investment within established commercial sites; • ignite new housing development; • enhance resident accessibility to work and training; and • improve business productivity. North Lanarkshire’s Core Infrastructure Projects £12.6m A8/M8 Corridor Access £66.3m Gartcosh/Glenboig Community Growth Area £93.6m Pan Lanarkshire Orbital Transport Corridor A8/M8 Corridor Access: Project Scope Holytown Link Road • Provision of missing link road & roundabout £4.4m from Holytown (A775) to Eurocentral Onsite next 2/3 years • Creates additional local access point Orchard Farm • New roundabout from the A8 to unlock wider Roundabout commercial development £4.4m Onsite next 4/5 years • Supports expansion of Mossend Rail Freight Terminal EuroCentral Park & • New 300 space Park & Ride/Share facility, direct Ride/Share access from new M8 to Eurocentral/Maxim £3.7m Onsite next 2/3 years Gartcosh/Glenboig CGA Proposal Gartcosh/Glenboig CGA: Project Scope Gartcosh/Glenboig Link Road • New road linking Glenboig to the M73, £8.7m / Onsite summer 2016 Rail Station & Business Interchange A80 Link Road • New carriageway to provide direct £7m / Longer-term project access to the A80 from the CGA Cardowan/Lochend Link Road • New road from Cardowan/Stepps to £7.8m / Longer-term project Gartloch/Lochend Kilgarth/Gartsherrie Link Rd & • M73 junction upgrade & new road, Junct 2a Improvement facilitate freight development £37.2m / Longer-term Project opportunities & Gartcosh Business Interchange Gartcosh Rail Station Park & Ride • 300 space expansion of existing £2.8m / Onsite next 4/5 years facility Hornshill Interchange Park & • Creation of new 200 space facility Ride/Share £2.8m / Onsite next 4/5 years Pan Lanarkshire Orbital Transport Corridor Pan Lanarkshire Orbital: Project Scope East Airdrie Link Road • New single carriageway bypass from £84.7m Carfin/Newhouse to Stand/South Long-term Project Cumbernauld Muir St Extension • New road to enhance Motherwell Town £1.2m Centre ring road Onsite next 3/4 years Motherwell Train Station • 125 space Park & Ride extension, plus Park & Ride/Footbridge new footbridge linking to Motherwell Train £6.4m Station Onsite next 3/4 years M74/A723 Junction • Improved access & traffic flow from M74 Improvements Junction 6 towards Motherwell town £1.3m centre Onsite next 4/5 years Gartcosh/Glenboig Link Road: Tender Opportunity Thank you Any further questions? [email protected] Tel: 01236 632400 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us