FC 1-300-09N 1 May 2014 FACILITIES CRITERIA (FC) NAVY AND MARINE CORPS DESIGN PROCEDURES CANCELLED APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED FC 1-300-09N 1 May 2014 FACILITIES CRITERIA (FC) NAVY AND MARINE CORPS DESIGN PROCEDURES Any copyrighted material included in this FC is identified at its point of use. Use of the copyrighted material apart from this FC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location CANCELLED This FC supersedes UFC 1-300-09N, dated 25 May 2005, with Changes 1-9. FC 1-300-09N 1 May 2014 FOREWORD Facilities Criteria (FC) provide functional requirements (i.e., defined by users and operational needs of a particular facility type) for specific DoD Component(s), and are intended for use with unified technical requirements published in DoD Unified Facilities Criteria (UFC). FC are applicable only to the DoD Component(s) indicated in the title, and do not represent unified DoD requirements. Differences in functional requirements between DoD Components may exist due to differences in policies and operational needs. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the UFC (replace w/ FC), the SOFA, the HNFA, and the BIA, as applicable. Because FC are coordinated with unified DoD technical requirements, they form an element of the DoD UFC system applicable to specific facility types. The UFC system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applicable to the Military Departments, Defense Agencies, and the DoD Field Activities. The UFC System also includes technical requirements and functional requirements for specific facility types, both published as UFC documents and FC documents. FC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and the Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Defense agencies should contact the preparing service for document interpretation and improvements. Technical content is the responsibility of the cognizant DoD working group. Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: Criteria Change Request. The form is also accessible from the Internet site listed below. FC are effective upon issuance and are distributed only in electronic media from the following source: • Whole Building Design Guide web site http://dod.wbdg.org/. Refer to UFC 1-200-01, General Building Requirements, for implementation of new issuances on projects. AUTHORIZED BY: CANCELLED JOSEPH E. GOTT, P.E. Chief Engineer Naval Facilities Engineering Command FC 1-300-09N 1 May 2014 FACILITIES CRITERIA (FC) REVISION SUMMARY SHEET Document: FC 1-300-09N, Navy and Marine Corps Design Procedures Superseding: UFC 1-300-09N, Design Procedures, 25 May 2005, with Changes 1-9 Description: This FC provides specific guidance on how and when to provide a project design deliverable for NAVFAC. This document is organized into design deliverables and design phases. Requirements for design deliverables, beyond or in more detail of what is already required by a Core UFC, are provided for NAVFAC-only. The requirements for when or to what extent these deliverables are provided are in the Phase chapters. Reasons for Document: • Update procedures to coordinate with current commercial and government standards, procedures, and governing UFC’s. • Update sustainable documents and requirements to coordinate with UFC 1-200- 02. Impact: • Improve efficiency and consistency of design procedures across NAVFAC. Unification Issues Design and Submittal procedures contained herein are pertinent to standards, software, and templates used, required, and unified within NAVFAC, and centered around the NAVFAC organization and operation. Procedures for NAVFAC may not work for USACE and Air Force operations due to organizational and operational differences. Similar uniform standardization and procedures are not available from the other Services. CANCELLED FC 1-300-09N 1 May 2014 TABLE OF CONTENTS CHAPTER 1 INTRODUCTION ....................................................................................... 1 1-1 PURPOSE AND SCOPE. .......................................................................... 1 1-1.1 Organization of Document. .................................................................... 1 1-2 APPLICABILITY. ....................................................................................... 1 1-3 GENERAL BUILDING REQUIREMENTS. ................................................ 1 1-4 EXCEPTIONS. ........................................................................................... 1 1-5 REFERENCES. ......................................................................................... 2 1-6 GLOSSARY. .............................................................................................. 2 CHAPTER 2 POLICY ...................................................................................................... 3 2-1 CRITERIA. ................................................................................................. 3 2-2 METRIC POLICY. ...................................................................................... 3 2-2.1 SI Definitions. ......................................................................................... 3 2-2.2 General Policy. ...................................................................................... 3 2-3 OWNERSHIP OF PROJECT DOCUMENTS AND DATA. ........................ 3 2-4 REGISTRATION. ....................................................................................... 4 2-4.1 Certification. ........................................................................................... 4 2-5 PROHIBITION OF POSTING DESIGN DELIVERABLES ON UNSECURED SERVERS. ....................................................................... 4 2-6 DESIGN DELIVERABLES FOR NAVAL CONSTRUCTION FORCES - MARINE LOGISTICS GROUPS AND NAVY CONSTRUCTION BATTALIONS (SEABEES). .................................................................... 5 2-7 OVERSEAS LOCATIONS TRANSLATIONS. ........................................... 5 CHAPTER 3 ROLES AND RESPONSIBILITIES ............................................................ 7 3-1 DESIGNER OF RECORD. ......................................................................... 7 3-1.1 Coordination with Command, Major Claimant, Region, and Activity. ..... 7 3-1.2 Coordination with Other Government Organizations. ............................ 7 3-1.3 Document Review and Checking System. ............................................. 7 3-1.4 CANCELLEDResponse to Review Comments. ........................................................... 7 3-1.5 Final Approval. ....................................................................................... 7 3-2 OTHER GOVERNMENT ORGANIZATIONS. ............................................ 8 3-2.1 Commander, 1st Naval Construction Division. ....................................... 8 3-2.2 Reviews for Health Hazards During Facilities Design Process. ............. 8 3-2.3 Space and Naval Warfare Systems Command (SPAWAR). .................. 8 i FC 1-300-09N 1 May 2014 3-2.4 Civil Works. ............................................................................................ 8 3-2.5 Historic Preservation Compliance. ......................................................... 8 3-2.6 Overseas Cultural Resources. ............................................................... 9 3-2.7 National Capitol Planning Commission (NCPC) and Commission of Fine Arts (CFA). ............................................................................................. 9 3-2.8 NAVFAC Medical Facilities Design Office (MFDO). ............................. 10 3-2.9 Sensitive Compartmented Information Facilities (SCIF). ..................... 10 3-3 COMMANDER, NAVFAC. ....................................................................... 10 CHAPTER 4 DELIVERABLE: FIELD INVESTIGATION .............................................. 11 4-1 PURPOSE AND SCOPE. ........................................................................ 11 4-2 RESPONSIBILITIES................................................................................ 11 4-3 COORDINATION. .................................................................................... 11 4-4 TOPOGRAPHIC SURVEY. ..................................................................... 11 4-5 GEOTECHNICAL INVESTIGATIONS AND REPORT. ........................... 13 4-5.1 Existing Information. ............................................................................ 13 4-5.2 Foundation and Soils Investigation. ..................................................... 14 4-5.3 Geotechnical Report. ........................................................................... 15 4-5.4 Boring Logs. ........................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages143 Page
-
File Size-