Additional Agenda Item Attachment

Additional Agenda Item Attachment

ATTACHMENT A A RESOLUTION RELATING TO THE WEST MAIN STREET ROAD DIET AND PAVEMENT MARKING STUDY AND OAK-POPLAR NEIGHBORHOOD TRAFFIC CIRCULATION STUDY Draft Resolution No.114/2011-12 WHEREAS, Carrboro Vision 2020 states that the “safe and adequate flow of bus, auto, bicycle and pedestrian traffic within and around Carrboro is essential”; and, WHEREAS, the Carrboro Downtown Traffic Circulation Study (2005) and Carrboro Comprehensive Bicycle Transportation Plan (2009) recommend road diet concepts for the four-lane section of West Main Street; and, WHEREAS, on February 8, 2011, the Board of Aldermen adopted a resolution directing Town staff to draft a letter to NCDOT conveying interest in the road diet concept and directing that an associated traffic and safety analysis be completed; and, WHEREAS, on September 16, 2008, the Board of Aldermen adopted a resolution directing staff to organize a neighborhood meeting to discuss traffic management in the Oak-Poplar neighborhood, bounded by N. Greensboro St., W. Main St., Weaver St., and Carrboro Elementary; and, WHEREAS, through the Durham-Chapel Hill-Carrboro Metropolitan Planning Organization, the consulting firm Martin/Alexiou/Bryson was procured to conduct the road diet analysis and neighborhood traffic study; and, WHEREAS, a report including both studies was subsequently prepared and received by the Board of Aldermen on March 6, 2012; NOW, THEREFORE BE IT RESOLVED by the Carrboro Board of Aldermen that: 1. The Board of Aldermen accepts the West Main Street Road Diet and Pavement Marking Study and the Oak-Poplar Neighborhood Traffic Circulation Study. 2. The Board of Aldermen provides the following comments and direction on the studies: a. ________________________________ b. ________________________________ c. ________________________________ [Actions needed to proceed with implementation of the W. Main St. road diet] 3. The Board of Aldermen directs Town staff to coordinate with the consultant to complete the preliminary pavement marking plan for a road diet on W. Main St. 4. The Board of Aldermen directs the Town Manager to send a letter to NCDOT conveying the Board’s resolution on the West Main Street Road Diet and Pavement Marking Study along with a copy of the study, the preliminary pavement marking plan (upon completion), and any other necessary supporting information. WEST MAIN STREET ROAD DIET AND PAVEMENT MARKING STUDY and OAK-POPLAR NEIGHBORHOOD TRAFFIC CIRCULATION STUDY Prepared For: Durham-Chapel Hill-Carrboro Town of Carrboro Metropolitan Planning Organization February 2012 DRAFT Prepared By: TOWN OF CARRBORO Table of Contents 1 Introduction And Background ................................................................................................................. 1 1.1 Purpose of the Study ............................................................................................................................. 1 1.2 Project Background and Context .......................................................................................................... 1 1.3 Community Involvement ...................................................................................................................... 3 1.4 Background Resources .......................................................................................................................... 5 2 West Main Street Road Diet And Pavement Marking Study .................................................................... 5 2.1 Introduction .......................................................................................................................................... 5 2.2 Road Diet Feasibility and Concept Plan ................................................................................................ 7 2.3 Traffic Data Collection ........................................................................................................................... 9 2.4 Level of Service Analyses .................................................................................................................... 10 3 Oak-Poplar Neighborhood Traffic And Circulation Study ....................................................................... 11 3.1 Introduction ........................................................................................................................................ 11 3.2 Pedestrian Issues ................................................................................................................................ 12 3.3 School Circulation Concerns ............................................................................................................... 15 3.4 General Circulation Issues ................................................................................................................... 18 3.5 Potential Solutions .............................................................................................................................. 20 Appendix 1: Draft Pavement Marking Plan ................................................................................................... 23 Appendix 2: Comments from The Public ....................................................................................................... 25 Appendix 3: Synchro and sidra Reports for Study Intersections .................................................................... 27 List of Figures Figure 1: Study Area ............................................................................................................................................... 1 Figure 2: Typical West Main Street Cross-Section - Existing .................................................................................. 2 Figure 3: Neighborhood Walk Route ...................................................................................................................... 3 Figure 4: Neighborhood Walk................................................................................................................................. 4 Figure 5: Public Meeting Map Exercise .................................................................................................................. 4 Figure 6: Roadway Data Gathering ......................................................................................................................... 5 Figure 7: Typical Road Diet Before and After Cross-Sections ................................................................................. 6 Figure 8: West Main Street - Existing ..................................................................................................................... 7 Figure 9: Proposed West Main Street Typical Section ........................................................................................... 7 Figure 10: Bike Box Example ................................................................................................................................... 8 Figure 11: Average Daily Traffic Volume ................................................................................................................ 9 Figure 12: Level of Service Analysis ...................................................................................................................... 10 Figure 13: Multimodalism on Oak Avenue ........................................................................................................... 12 Figure 14: Oak-Poplar Pedestrian Issues .............................................................................................................. 13 Figure 15: Missing Sidewalks on Shelton Street ................................................................................................... 14 Figure 16: Pedestrian Crossing West Main Street ................................................................................................ 14 Figure 17: Oak Ave. and N. Greensboro St. Intersection ...................................................................................... 15 Figure 18: School Circulation Concerns ................................................................................................................ 16 West Main Street Road Diet and Pavement Marking Study and Oak-Poplar Neighborhood Traffic Circulation Study DRAFT i TOWN OF CARRBORO Figure 19: Carrboro Elementary Drop-Off Circle ................................................................................................. 16 Figure 20: Pavement Markings on Shelton Street ............................................................................................... 17 Figure 21: Intersection of West Main Street, Hillsborough Road, and Shelton Street ........................................ 18 Figure 22: Traffic on Poplar Avenue .................................................................................................................... 18 Figure 23: General Circulation Issues .................................................................................................................. 19 Figure 24: Chicane Example ................................................................................................................................. 20 Figure 25: Road Diet Typical Section ................................................................................................................... 23 Figure 26: Bike Box Concept ................................................................................................................................ 23 Figure 27: Road Diet Pavement Marking Plan ....................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    37 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us