Surrey Heath Borough Installation Update August 2021

Surrey Heath Borough Installation Update August 2021

Surrey Heath Borough - Installation Update Issue Date: August 2021 For the latest information about installation of the replacement pipeline, please visit www.slpproject.co.uk or simply scan the QR code below. From September 2021, we will be undertaking seasonal ecological mitigation works along the route in Surrey Heath. In Chobham Common: From the 23 August 2021, we will be: Widening the entrance to the common from Windsor Road. This will begin with tree and vegetation removal. Traffic lights will be in operation on Windsor Road for two weeks to ensure a safe working zone can be maintained. Installing a post-and-rope fence along the access track. Clearing vegetation - to prepare our working areas. Creating two compounds - for staff welfare units and the safe storage of materials. Improving the access track. From the 6 October 2021, we will be: Installing Heras-style fencing around the working areas. These areas are for the launch and reception pits of the trenchless crossings, and the pipe stringing areas. Starting installation of the three trenchless sections of replacement pipeline. Installing the replacement bridge at the western end of the common. If you have any additional questions email us at [email protected] You can also keep up to date with the latest news via Facebook (@SLPConstructionProject) or by following us on twitter (@ConstructionSLP). Keeping 100 road tankers off the road every day For more information please visit www.slpproject.co.uk or contact us at: info@slpproject You can also keep up to date with the latest news via facebook (@SLPConstructionProject) or by following us on twitter (@ConstructionSLP) N Surrey Heath Borough Council 1 Once installed, the pipeline will be a quiet neighbour and Traffic along A322 Lightwater 2 will go unnoticed by most Bypass will not be disrupted as people. trenchless installation will be used. Measures such as trenchless 1 installation and narrow working Specialist techniques such as will be used to reduce the impact hand digging and airspades on Chobham Common SSSI. will be used to install around tree roots. 2 Vegetation will be replanted 3 once construction is The route avoids the protected 3 complete. heathland in Turf Hill SSSI. Where non- mature trees need to be removed, these St Catherines Road will 4 will be replaced. Parks will remain open need to be closed to traffic during installation. during installation, but You can read the Site Specific Plan for pedestrian access will be more detail. Public Rights of Way, such as maintained. footpaths, will remain open with diversions. St Catherines SANG and Frith Hill SNCI 5 4 5 will still be open to the public, with temporary footpath diversions during some Legend construction activities. District boundary 6 You can read more detail about St Catherines SANG in the Site Specific Plan. Maximum limit of the working area, also known as Order Limits Temporary construction Trenchless installation 6 compounds will be used to cross the 0 1 2 Trenchless crossings Blackwater Valley. kilometres Contains OS data © Crown Copyright and database right 2020 *all Site Specific Plans can be found on our website This project is replacing approximately 90km of our underground aviation fuel pipeline from Boorley Green, Hampshire to our West London Terminal storage facility in Hounslow. For regular updates, Pipelines are a safe, secure and low-impact way of transporting fuel. sign up to our newsletter at The pipeline will keep 100 road tankers off the road every day. www.slpproject.co.uk *based on Esso’s 2015 data for its existing pipeline Phasing of works – Surrey Heath 2021 2022 2023 Construction Work Area Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Trenchless Crossing TCO20 - Blackwater Valley SC Johnson Land VC PL SE Compound 5A off Frimley Green Road Frimley Green Road Roundabout Compound 5B off Balmoral Drive Balmoral Drive St Catherines Road St Catherines SANG VC ST PL SE Compound 5C - St Catherines SANG Frith Hill VC PL Compound 5U Frith Hill VC ST Pine Ridge Golf Course Compound 5D - Colony Bog & Bagshot Heath Colony Bog & Bagshot Heath VC VC ST Red Road Compound 5E Turf Hill VC SE PL Trenchless Crossing TC021 - Lightwater Bypass A322 Windlemere SANG VC PL Blackstroud Lane East to Halebourne Lane VC SE PL Trenchless Crossing TC022 - Hale Bourne Compound 5F off Halebourne Lane Halebourne Lane to Windlesham Road VC SE PL Trenchless Crossing TC023 - Windlesham Road Windlesham Road to Steep Hill VC PL Steep Hill to Windsor Road VC Compound 5G off Windsor Road Chobham Common ST/VC PL SE Compound 5H - Chobham Common Trenchless Crossing TC024 - Chobham Common Trenchless Crossing TC025 - Chobham Common Compound 5I - Chobham Common Trenchless Crossing TC026 - Chobham Common Key Advanced works / ecology mitigation Open cut streetworks i ST Strimming Compound in use We are now releasing a local, area specific timeline for installation. This gives an indication of when we expect to be working in each area. We’ll let you VC Tree and Hedge Clearance Reinstatement know at least two months in advance of any work starting and provide further detail of expected duration. Since we are currently progressing detailed Trenchless crossing including work area and access SE Seeding design, the timetable may be subject to some additional change as we finalise our plans and work to reduce overall disruption during construction. Open cut works rural / semi rural PL Planting Please be assured that if our plans change, we’ll keep you informed. Once the pipeline is buried, it will be a quiet neighbour. Community charter Plenty of notice Plenty of notice We’ll let you know at least two months in advance of any work starting and if our plans change, we’ll let you know. Here to help Here to help We’ll let you know at least two months in advance of any work Our local team will be available by phone or email to answer any questions you have. Information directly to you Information directly to you Our local area e-newsletter and alerts will let you know what’s happening. Where we are working in streets or roads, we’ll operate a dedicated text service to inform interested residents. In your area In your area We’ll make sure information about installation in your area is easy to find on our website, in a way that is easy for you to identify what’s important to you. In some public parks, we’ll hold pop up events to meet with those using the facilities and give out information about our installation plans. Talking to landowners Talking to landowners All landowners affected by the installation will have a dedicated member of our lands team to contact to discuss our work. Open and honest communication Open and honest We’ll be clear about our works and any disruption that may take place. Safe and secure sta and sites Safe and secure We’ll keep our team safe, and we’ll keep you safe. Our commitment to health and safety is at the heart of our business and we’ll make sure your safety is not impacted by our work. Well managed sites Well managed sites Our sites will use fencing suitable to the location and we’ll use things like wheel-washing on our vehicles to keep the surrounding roads clean. For more information please visit www.slpproject.co.uk.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us