TRANSPORTATION PROJECTS UNDERWAY IN THE EUREKA/ HUMBOLDT REGION Filling Potholes and Repaving roads PROJECTS FILLING 93 POTHOLES Pavement preservation project on nearly 78 miles of US 101 from AND REPAVING south of School Road to north of Big Lagoon Bridge near the City of CRUMBLING ROADS Trinidad in Humboldt County Pavement preservation project on nearly 37 miles of US 101 from Englewood Park Undercrossing to Eel River Bridge near Redcrest in PROJECTS Humboldt County 55 IMPROVING THE 31 projects rehabilitating local streets and roads in Siskiyou County SAFETY Nearly 6 miles of pavement improvements on two-lane road on OF LOCAL ROADS Lower Lake Road in the Fort Dick area in Del Norte County AND BRIDGES AND Pavement improvements on 25 miles on I-5 from the Sacramento River Bridge in the City of Dunsmuir to Black Butte Overhead in RELIEVING TRAFFIC Siskiyou County CONGESTION Pavement resealing and removal and replacement of failed roadway sections on various local streets in the City of Fort Jones Paving 13.5 miles of local roads in the City of Tulelake SAFETY IMPROVEMENT Rehabilitate and pavement improvements on local roads throughout PROJECTS FOR in the City of Eureka 9 PEDESTRIANS AND Improve approximately 20 miles of pavement on US 101 from north of Myers Flat to Newton Road in Humboldt County BICYCLISTS Paving of local streets and roads in the City of Arcata Resurface 2.3 miles of Myrtle Avenue in the unincorporated Eureka area of Humboldt County SB1 FUNDING FOR OUR Reconstruct entire length of Redwood Way in Humboldt County CITIES AND COUNTIES: 10-YEAR TOTAL Humboldt road safety County $91.6 million Install new traffi c signals at the intersection of Alma Street and Del Norte $18.2 Million North Mt. Shasta Boulevard in Siskiyou County County Drainage improvements to prevent fl ooding along SR 299 from east of SR 200/299 Separation in the City of Blue Lake to east of Boise Siskiyou Creek Campground near Willow Creek in Humboldt County County $67.2 Million Fix culverts along SR 299 at various locations in Trinity County Repair failing asphalt and restriping at multiple intersections in the City of Fortuna TOTAL $177 million Examples of Projects Underway in the Eureka/Humboldt Region Bridges Pedestrian and bicyclist Safety Revamp 12 bridges on US 101 in Humboldt County Remove existing traffi c signals and install new Replace southbound bridge deck on I-5 from Central traffi c signals at the intersection of Alma Street Dunsmuir Undercrossing to north of Siskiyou and North Mt. Shasta Blvd. and construct new Avenue Overcrossing at Sacramento River Bridge in American’s with Disabilities Act (ADA) compliant Siskiyou County sidewalks at the four corners of the intersection in Improve the bridge deck and railings at Azalea Road the City of Mount Shasta Overcrossing on I-5 near Mount Shasta in Siskiyou Improve sidewalks with ramps that meet ADA County standards on Harrison Avenue between Harris Street Replace the Panther Creek Bridge and the Hunter and Myrtle Avenue in Humboldt County Creek Bridge on US 101 north of Klamath in Del Shoulder widening, sidewalk infi l, and crosswalk Norte County improvements at McKinleyville and Fortuna Middle Construct new bridge on US 101 near the Smith Schools River community in Del Norte County Upgrade sidewalk ramps for ADA compliance and Revamp 6 bridges on SR 3 and I-5 in Siskiyou upgrade traffi c signals for pedestrians at Sutter County Road/Central Avenue intersection in Humboldt Replace the Dr. Fine Bridge on US 101 north of the County Smith River Overfl ow Bridge north of Crescent City in Construction of a new trail along the former Annie Del Norte County and Mary ral line within the City of Blue Lake Traffic Congestion Relief Improvements to regulate traffi c and control speed Public Transportation in the City of Arcata in Humboldt County Rehabilitate and reconstruct Hawthorn and Felt Streets to relieve congestion in the City of Eureka Repairs to 20 heavy duty buses and 12 Paratransit Install traffi c calming devices on Hartman Road in vehicles for the Humboldt Transit Authority the City of Blue Lake Replace aging transit vehicles for the County of Siskiyou Transit Improvements for the City of Arcata This is a partial list of projects. rebuildingca.ca.gov TRANSPORTATION PROJECTS UNDERWAY IN THE BAY AREA REGION 699 PROJECTS FILLING POTHOLES AND Filling Potholes and Repaving roads REPAVING CRUMBLING ROADS Repave 104 miles on 1-880 in Alameda County PROJECTS IMPROVING THE SAFETY 30 miles of pavement improvements on SR 87 in San Jose 362 OF LOCAL ROADS 22 miles on pavement improvements on I-80 from SR 4 to the Carquinez Bridge in Contra Costa County PROJECTS IMPROVING THE SAFETY 48 OF LOCAL BRIDGES 50 pavement improvement projects in Antioch Pavement preservation project on 26 miles of SR 17 in Scotts Valley to the Santa Clara County line TRAFFIC CONGESTION 81 RELIEF PROJECTS Resurface 10 miles of I-505 from I-80 to the Yolo/Solano County Line 112 SAFETY IMPROVEMENTS FOR Pavement preservation project improving 33 miles of SR 1 from PEDESTRIANS AND BICYCLISTS Pudding Creek Bridge to north of Wages Creek Bridge near the City of Fort Bragg SB1 FUNDING FOR OUR CITIES AND COUNTIES: 10-YEAR TOTAL Traffic Congestion Relief Alameda County $715.8 Million Install ramp meters, carpool bypass lanes and traffi c operations Contra Costa County $517.2 Million systems on I-680 in Alameda, Contra Costa and Santa Clara Counties Lake County $45 Million Construct a lane between interchanges on SR 237 from Zanker Marin County $121.2 Million Road to North First Street Overcrossing in San Jose $67 Million Widen ramps, install ramp meters and traffi c operations systems Mendocino County on I-880 in Fremont and on SR 84 in Newark Napa County $79 Million Realign and widen Tassajara Road in Dublin to reduce traffi c congestion and improve road safety $382.9 Million San Francisco County Implement 22 miles of managed lanes in San Mateo and Santa Clara on US 101 San Mateo County $365 Million Convert existing (HOV) lanes to Express Lanes between SR 237 Santa Clara County $894.1 Million and Whipple Avenue and construct new managed lanes between Whipple Avenue and I-380 on US 101 Solano County $223 Million Traffi c management systems project will upgrade various traffi c $257.8 Million monitoring elements on SR 20, SR 29, US 101, SR 175 and SR Sonoma County 281 in Lake County and Mendocino County to improve data transmission TOTAL $3.7 Billion Continued Examples of Projects Underway in the Bay Area Region Bridges Pedestrian Safety Repair 32 bridges on US 101 and State Routes 9, Widen overpass on the University Avenue/US 101 to provide safer 17, 82, 85, 87 and 152 in Santa Clara County pedestrian and bicycle travel and more effi cient vehicle travel in Repair 26 bridges on SR 24 and I-80, I-580, I-880 East Palo Alto and I-980 in Alameda County Construct a pedestrian bridge at the Page Mill/Moon Lane Repair 9 bridges on SR 1, US 101 and I-280 in San crossing in Los Altos Hills Mateo County Install crosswalk fl ashers at 7 school sites in Contra Costa County Repair 4 bridges on US 101 in San Francisco County Install protected bikeway, intersections and new pedestrian Raise or replace 4 bridges to meet vertical signal on Walnut Avenue from Mission Boulevard to Paseo Padre clearance standards in Emeryville and Oakland Parkway in Fremont Repair Irwin Creek Bridge and culverts on US 101 Enhance the safety of students walking to and from school by in Marin County installing sidewalks along Hartley Street in the City of Lakeport Repair San Antonio Creek Bridge on US 101 in Sonoma County to address fl ooding Public Transportation Widen bridge to relieve traffi c congestion and rehabilitate pavement on Grant Ave in Novato BART extension into downtown San Jose and out to Santa Clara, Repairs on Buhman Road Bridge and Mount creating 4 new stations. Will serve over 52,000 new riders per day Veeder Road Bridge in Napa County in 2035 and increase connectivity to Caltrain, Amtrak, and transit Bridge project will repair the Bachelor Creek Bridge services at San Jose Diridon station. on SR 20 near Upper Lake in Lake County 272 new BART rail vehicles, increase train frequency to 30 trains per hour through the Transbay tunnel, increase in train length to 10 car trains during peak hours to alleviate crowding. Allows for over Road Safety 200,000 new daily BART riders. Service improvements for Caltrains to include the replacement of Install or replace street signs and traffi c striping to old diesel fl eet with high-performance electric trains improve visibility and repair damaged sidewalks at Deploy 45 zero-emission buses to expand fl eet for the Alameda various locations in the City of Newark Contra Costa Transit District (AC Transit) Replace drainage culverts along SR 271 from 8 zero-emissions vehicles for Muni light rail system for the San north of Confusion Hill to north of US-101/SR 253 Francisco Municipal Transportation Agency (SFMTA) Seperation near Piercy in Mendocino County Increased passenger rail trips on weekdays and weekends for Construct shoulder widening on Uvas Road Sonoma-Marin Area Rail Transit (SMART) District in Santa Clara County and new guard rail and Add express bus routes along US 101 in San Mateo, Santa Clara, pedestrian/bicycle warning traffi c signs and San Francisco counties using 37 zero-emission vehicles to reduce travel times and improve reliability Secure 59 new 40-foot hybrid diesel-electric buses to replace existing diesel buses for the Alameda Contra Costa Transit District (AC Transit) Development and construction of a multi-modal transit center in the City of Ukiah This is a partial list of projects.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages26 Page
-
File Size-