District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform

District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform

Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform District Report Dhading 12 April – 9 May 2019 Summary of events during this period Name of activity/event Event Participants Contact Person Reference date summary Document Male Female Refer 12 News & HRRP Dhading took part in DFID [email protected] April Update meeting held at Miracle hotel, Gorkha. rg 2019 Section Below TI Dhading successfully organize a Refer program on "Policy, progress and 13 News & expenses of stakeholders with [email protected] April Update Transparency on reconstruction after 2019 Section earthquake" on 13th April 2019 at DCC Below Hall, Dhading. Training to Local Authorities and Social Activists on DRR, BCI and Retrofit held in Dhading. One-day training on Disaster Risk Reduction/Management (DRR), Building Code Implementation (BCI) and Retrofit for the local authorities including social activists has been held Refer in Dhading under Baliyo Ghar Program. 15 News & 50 more participants discussed the roles [email protected] April Update of local authority and social activists in rg 2019 Section reducing the risk of multiple disasters Below and in implementing retrofit. Representatives of Siddhalekh Rural Municipality, Galchi Rural Municipality and Nilkantha Municipality, leaders of opposition parties and social activists including local teachers actively participated the sessions. Refer HRRP Dhading took part in DFID 16 News & [email protected] meeting held at Janagibika Hotel, April Update rg Dhading Besi, Dhading. 2019 Section Below Joint field visit with DLPIU/building, GMaLI and HRRP team at Siddhalekh Rural Municipality was conducted. The 16 - 17 Field Visit [email protected] visit was focused on typology April Section 1 rg collection, non-compliance issues, 2019 Below identification of fake beneficiaries and palika/ward meeting. 9 May 2019 Page 1 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform Summary of events during this period HRRP District Technical coordinator 18 – 20 attended “Seven days Training of [email protected] April NA Trainers” Program in Pokhara, Kaski rg 2019 organized by CLPIU Building. HRRP Dhading Team together with 21 GMaLI, Building DLPIU & DCC [email protected] April NA conducted informal meeting regarding rg 2019 Re-Survey & Re-Verification Dhading HRRP successfully organized Link to GD a District Coordination meeting in 25 [email protected] Meeting collaboration with Building DLPIU on April [email protected] Minute 25 April 2019 at DLPIU Building, 2019 rg Dhading Besi, Dhading. HRRP District Technical coordinator 6 May [email protected] updated MEAL report of Dhading and NA 2019 rg forwarded it to central HRRP Refer Transparency International Nepal News & successfully organized a program 7 May [email protected] Update “Review and Reflection “at Jibika 2019 rg Section Hotel, Dhading Besi, Dhading. Below 9 May 2019 Page 2 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform Tranche Status Beni Dhun Galc Gang Gajur Jwala Khan Netra Nilkh Rub Sidd Tha Tripu Total Rural Ghat i hi ajam i RM mukh iyaba wati anta y halek kr rasun /Munici Rora Besi RM una i s RM M Vall h RM dari pality ng M RM RM RM ey RM Rm RM RM Total HHs 6014 3632 4016 1347 327 5975 672 6474 81655 5501 7499 6724 6732 5625 Surveye 1 0 2 d Total HHs 4910 7158 5997 5105 5390 3469 3866 1218 285 5359 638 5697 74815 6447 Eligible 3 0 4 Total 275 HHs 4952 3413 3713 1167 1 5055 608 5571 70995 4435 6633 5676 6345 4696 Enrolle 1 4 d 275 First 4435 6633 5676 6345 4696 4952 3413 3713 1167 1 5055 608 5571 70995 Tranche 1 4 242 Second 3815 5097 5275 4234 4020 3081 3465 1031 9 4529 518 5066 62460 Tranche 5944 6 9 Third 2910 3318 3277 4784 3088 3140 2293 2937 8079 187 3553 322 3590 46074 Tranche 6 9 Total HH 2848 1874 2782 7826 161 3395 341 3499 49470 2507 3177 2545 4252 2731 Constru 5 9 cted Grievan ce 2424 658 641 2394 650 1521 131 1002 16777 1690 1067 1273 720 1427 Register 0 ed Grievan ce 700 164 153 1374 420 640 341 785 7075 599 356 728 285 530 Address ed RF HH 12 43 559 187 463 255 215 3913 618 98 314 42 432 675 Eligible RF HH 675 12 43 559 187 463 255 215 3913 Enrolle 618 98 314 42 432 d RF 1st 35 0 1 53 43 0 10 10 244 0 9 36 2 45 Tranche RF 2nd 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Tranche NC Register 22 252 130 31 268 ed 87 7 27 281 0 291 275 144 1815 NC Address 20 174 91 27 207 ed 73 7 22 210 0 219 160 126 1336 9 May 2019 Page 3 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform Tranche Status 16000 14000 12000 10000 8000 6000 4000 2000 0 Total HHs Surveyed TotalHHs Eligible Total HHs Enrolled First Tranche Second Tranche Third Tranche Chart Title Tripurasundari Rural Municipality Thakre Rural Municipality Siddhalek Rural Municipality Rubi valley Rural Municipality Nilkantha Urban Municipality Netrawati Rural Municipality Khaniyabas Rural Municipality Jwalamukhi Rural Municipality Gujuri Rural Municipality Gangajamuna Rural Municipality Galchi Rural Municipality Dhunibesi Urban Municipality Benighat Rorang Rural Municipality 0 10000 20000 30000 40000 50000 60000 70000 80000 Total HHs Surveyed TotalHHs Eligible Total HHs Enrolled First Tranche Second Tranche Third Tranche 9 May 2019 Page 4 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform Total HH Constructed 16000 14000 12000 10000 8000 6000 4000 2000 0 Total HHs Surveyed TotalHHs Eligible Total HHs Constructed Benighat Rorang Rural Municipality Dhunibesi Urban Municipality Galchi Rural Municipality Gangajamuna Rural Municipality Gujuri Rural Municipality Jwalamukhi Rural Municipality Khaniyabas Rural Municipality Netrawati Rural Municipality Nilkantha Urban Municipality Rubi valley Rural Municipality Siddhalek Rural Municipality Thakre Rural Municipality Tripurasundari Rural Municipality Palika wise Retrofitting Status :- 1600 1400 1200 1000 800 600 400 200 0 Retrofitting HH Eligible Retrofitting HH Enrolled Retrofitting HH First Tranche Retrofitting HH Second Tranche 9 May 2019 Page 5 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform 16000 14000 12000 10000 8000 6000 4000 2000 0 Total HHs Surveyed TotalHHs Eligible Total HHs Constructed Grievance Status 16000 14000 12000 10000 8000 6000 4000 2000 0 Total HHs Surveyed TotalHHs Eligible Grievance Registered Grievance Addressed 9 May 2019 Page 6 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform 16000 14000 12000 10000 8000 6000 4000 2000 0 Total HHs Surveyed TotalHHs Eligible Grievance Registered Grievance Addressed 9 May 2019 Page 7 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform News & Updates 1) HRRP Dhading took part in DFID meeting held at Miracle hotel, Gorkha where different pos present their annual progress accordingly. a) Participants in the Meeting organized by DFID conducted in Gorkha district. 2) TI Dhading successfully organize a program on "Policy, progress and expenses of stakeholders with Transparency on reconstruction after earthquake" on 13th April 2019 at DCC Hall, Dhading. a) Participants in the Meeting organized by TI Nepal conducted in Dhading district. 9 May 2019 Page 8 of 13 Monthly District Report Housing Recovery and Housing Recovery and Reconstruction Platform, Nepal Reconstruction Platform 3) Training to Local Authorities and Social Activists on DRR, BCI and Retrofit held in Dhading. • NSET Baliyo Ghar Manager Mr. Ranjand Dhungel during training on DRR • Participants in the training organized by NSET conducted in Dhading district. One-day training on Disaster Risk Reduction/Management (DRR), Building Code Implementation (BCI) and Retrofit for the local authorities including social activists has been held in Dhading under Baliyo Ghar Program. 50 more participants discussed the roles of local authority and social activists in reducing the risk of multiple disasters and in implementing retrofit. Representatives of Siddhalekh Rural Municipality, Galchi Rural Municipality and Nilkantha Municipality, leaders of opposition parties and social activists including local teachers actively participated the sessions. As part of the training, the participants were acquainted with the process of building permit system through simulation. Many of the municipalities in Nepal are following building permit system and implementing building code which now is mandatory for the rural municipalities as well. So to enhance the understanding level and capacitate in setting the BCI structure (Policy/system, manpower, resources, technical assistance) in rural municipalities, the demo building permit system exercise was conducted. Baliyo Ghar staffs took part in the simulation. • Participants observing Retrofitting materials Splint and Bandages during training. Moreover, to make them more confident in implementing Retrofit particularly in stone masonry houses, onsite visit was arranged in one of the retrofit sites in Kalleri, ward-02 of Galchi Rural Municipality. Baliyo Ghar program is implementing retrofit OJT in the house of Mr. Bed Prasad Simkhada, one of the earthquakes

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us