2021 Capital Investment Program Appendix A

2021 Capital Investment Program Appendix A

2021 CAPITAL INVESTMENT PLAN APPENDIX A: INVESTMENT DETAILS Appendix A: Investment Details This section provides the lists of investments contained within this CIP. The information within each column is described below: • Location – where the investment is located • Project ID – the Division specific ID that uniquely identifies each investment • Project name – the name of the investment and a brief description • Priority – the capital priority that the investment addresses • Program – the program from which the investment is made • Score – the score of the investment (reliability investments are not scored) • Total cost – the total cost of the investment • Prior years – the spending on the investment that pre-dates the plan update • FY 2021 – the spending estimated to occur in fiscal year 2021 • Post FY 2021 – the estimated spending to occur post fiscal year 2021 for the project APPENDIX A: INVESTMENT DETAILS 2021 CAPITAL INVESTMENT PLAN ii Aeronautics 2021 Capital Investment Plan Total Prior Years 2021 After 2021 Location Division ID Priority Program Project Description Score $M $M $M $M Barnstable Municipal Aeronautics | Airport AE21000002 1 | Reliability SECURITY ENHANCEMENTS 1 $0.72 $0.00 $0.72 $0.00 Airport capital improvement Aeronautics | Airport MEPA/NEPA/CCC FOR MASTER PLAN AE21000003 1 | Reliability 1 $0.80 $0.53 $0.28 $0.00 capital improvement IMPROVEMENTS Aeronautics | Airport AE21000023 1 | Reliability AIRPORT MASTER PLAN UPDATE 1 $1.12 $0.00 $0.05 $1.07 capital improvement Aeronautics | Airport PURCHASE SNOW REMOVAL EQUIPMENT AE21000026 1 | Reliability 1 $1.03 $0.05 $0.05 $0.93 capital improvement CARRIER VEHICLE Aeronautics | Airport AE21000029 1 | Reliability INSTALL AND REPLACE FENCING 1 $3.26 $0.00 $0.05 $3.21 capital improvement Aeronautics | Airport AE21000047 1 | Reliability PURCHASE RAPID RESPONSE ARFF VEHICLE 1 $0.27 $0.00 $0.27 $0.00 capital improvement Aeronautics | Airport ENVIRONMENTAL ASSESSMENT FOR MASTER Beverly Regional Airport AE21000004 1 | Reliability 1 $0.22 $0.00 $0.21 $0.01 capital improvement PLAN IMPROVEMENTS Aeronautics | Airport AE21000005 1 | Reliability RUNWAY 9 OBSTRUCTION REMOVAL 1 $0.17 $0.00 $0.17 $0.00 pavement Chatham Municipal Aeronautics | Airport ENVIRONMENTAL ASSESSMENT FOR MASTER AE21000006 1 | Reliability 1 $0.19 $0.00 $0.19 $0.00 Airport capital improvement PLAN IMPROVEMENTS Aeronautics 2021 Capital Investment Plan Total Prior Years 2021 After 2021 Location Division ID Priority Program Project Description Score $M $M $M $M Fitchburg Municipal Aeronautics | Airport MASTER PLAN UPDATE & WILDLIFE HAZARD AE21000007 1 | Reliability 1 $0.33 $0.00 $0.33 $0.00 Airport capital improvement ASSESSMENT Gardner Municipal Aeronautics | Airport AE21000030 1 | Reliability T‐HANGAR DESIGN & CONSTRUCTION 1 $2.31 $0.00 $1.51 $0.80 Airport capital improvement Lawrence Municipal Aeronautics | Airport ENVIRONMENTAL ASSESSMENT FOR MASTER AE21000009 1 | Reliability 1 $0.17 $0.00 $0.17 $0.00 Airport capital improvement PLAN IMPROVEMENTS Aeronautics | Airport AE21000044 2 | Modernization LWM SAAB CONSTRUCTION SERVICES 1 $4.13 $0.00 $0.78 $3.35 administration buildings Mansfield Municipal Aeronautics | Airport AE21000010 1 | Reliability PERMITTING FOR RUNWAY 32 TREE CLEARING 1 $0.17 $0.00 $0.17 $0.00 Airport pavement Marshfield Municipal Aeronautics | Airport PREPARE WILDLIFE HAZARD MANAGEMENT AE21000031 1 | Reliability 1 $3.04 $0.00 $2.46 $0.59 Airport capital improvement PLAN Aeronautics | Airport ACQUIRE RIGHT OF WAY EASEMENT FOR AE21000032 1 | Reliability 1 $0.12 $0.00 $0.12 $0.00 capital improvement WILDLIFE/SECURITY FENCE Martha's Vineyard Aeronautics | Airport ENVIRONMENTAL ASSESSMENT FOR RUNWAY AE21000011 1 | Reliability 1 $0.50 $0.00 $0.50 $0.00 Airport pavement 15‐33 RECONSTRUCTION Aeronautics | Airport ENVIRONMENTAL ASSESSMENT FOR MASTER AE21000012 1 | Reliability 1 $0.37 $0.00 $0.37 $0.00 capital improvement PLAN IMPROVEMENTS Aeronautics 2021 Capital Investment Plan Total Prior Years 2021 After 2021 Location Division ID Priority Program Project Description Score $M $M $M $M Aeronautics | Airport AE21000013 1 | Reliability T‐HANGAR TAXILANE RECONSTRUCTION 1 $0.96 $0.00 $0.96 $0.00 pavement Nantucket Memorial Aeronautics | Airport AE21000014 1 | Reliability RUNUP PAD GEOMETRY 1 $1.17 $0.00 $1.17 $0.00 Airport pavement Aeronautics | Airport ENVIRONMENTAL ASSESSMENT FOR MASTER AE21000015 1 | Reliability 1 $0.18 $0.00 $0.10 $0.08 capital improvement PLAN IMPROVEMENTS Aeronautics | Airport AE21000033 1 | Reliability REHABILITATE TAXIWAY ECHO 1 $22.40 $7.78 $4.23 $10.39 pavement Aeronautics | Airport AE21000034 1 | Reliability SECURITY UPGRADES 1 $4.20 $0.00 $2.20 $2.00 capital improvement Norwood Municipal Aeronautics | Airport PERMITTING FOR MASTER PLAN AE21000016 1 | Reliability 1 $0.17 $0.00 $0.16 $0.01 Airport capital improvement IMPROVEMENTS Aeronautics | Airport AE21000017 1 | Reliability INSTALL WILDLIFE/PERIMETER FENCE PHASE I 1 $0.96 $0.00 $0.72 $0.24 capital improvement Aeronautics | Airport Orange Municipal Airport AE21000018 1 | Reliability RECONSTRUCT RUNWAY 1‐19 (5,000' X 100') 1 $4.90 $0.00 $2.35 $2.55 pavement Plymouth Municipal Aeronautics | Airport AE21000019 1 | Reliability RELOCATE TAXIWAY SIERRA (3,350'X35') 1 $4.10 $0.00 $2.00 $2.10 Airport pavement Aeronautics 2021 Capital Investment Plan Total Prior Years 2021 After 2021 Location Division ID Priority Program Project Description Score $M $M $M $M Provincetown Municipal Aeronautics | Airport ENVIRONMENTAL ASSESSMENT (TERMINAL AE21000020 1 | Reliability 1 $0.24 $0.00 $0.24 $0.00 Airport pavement BUILDING & PARKING LOT) Aeronautics | Airport AE21000021 1 | Reliability ENVIRONMENTAL MITIGATION ‐ PHASE 4 1 $0.33 $0.00 $0.33 $0.00 capital improvement Aeronautics | Airport DESIGN & PERMIT SNOW REMOVAL AE21000048 1 | Reliability 1 $0.32 $0.00 $0.32 $0.00 capital improvement EQUIPMENT BUILDING Aeronautics | Airport ACQUIRE SNOW REMOVAL EQUIPMENT (SRE) AE22000019 1 | Reliability 1 $0.42 $0.00 $0.02 $0.40 capital improvement VEHICLE & PLOW Aeronautics | Airport Statewide AE21000008 1 | Reliability STATEWIDE PAVEMENT CRACK SEAL 1 $9.50 $0.00 $1.50 $8.00 pavement Aeronautics | Airport AE21000038 1 | Reliability FLIGHT LEVEL ‐ STATE HELICOPTER 1 $0.32 $0.05 $0.05 $0.21 capital improvement Aeronautics | Airport AE21000039 1 | Reliability AIRPORT SYSTEM PLANNING STUDIES 1 $4.80 $0.00 $1.00 $3.80 capital improvement Aeronautics | Airport AE21000040 1 | Reliability VEGETATION MANAGEMENT 1 $5.40 $0.00 $1.00 $4.40 pavement Aeronautics | Airport AE21000041 1 | Reliability SECURITY CAMERAS 1 $1.60 $0.00 $0.20 $1.40 capital improvement Aeronautics 2021 Capital Investment Plan Total Prior Years 2021 After 2021 Location Division ID Priority Program Project Description Score $M $M $M $M Aeronautics | Airport NAVIGATIONAL AID MAINTENANCE (KOBO & AE21000042 1 | Reliability 1 $0.26 $0.00 $0.05 $0.21 pavement NORTH SHORE 2) Aeronautics | Airport AE21000046 1 | Reliability DRONE DATA & INFORMATION SYSTEMS 1 $1.75 $0.00 $1.75 $0.00 capital improvement Taunton Municipal Aeronautics | Airport AE21000024 1 | Reliability ACQUIRE AVIGATION EASEMENTS 1 $0.15 $0.00 $0.15 $0.00 Airport pavement Aeronautics | Airport AE21000025 1 | Reliability INSTALL OIL WATER SEPARATOR ‐ PHASE II 1 $0.24 $0.00 $0.24 $0.00 pavement Aeronautics | Airport AE21000045 2 | Modernization TAN SAAB CONSTRUCTION SERVICES 1 $4.03 $0.00 $0.68 $3.35 administration buildings Westover Metropolitan Aeronautics | Airport AE21000022 1 | Reliability OBSTRUCTION REMOVAL 1 $0.11 $0.00 $0.11 $0.00 Airport pavement Aeronautics | Airport AE21000027 1 | Reliability HANGAR 13 IMPROVEMENTS 1 $0.83 $0.00 $0.33 $0.50 capital improvement Aeronautics | Airport AE21000028 1 | Reliability PURCHASE GROUND SUPPORT EQUIPMENT 1 $0.06 $0.00 $0.06 $0.00 pavement Aeronautics | Airport PART 150 ACQUISITION & SOUND INSULATION AE21000035 1 | Reliability 1 $1.36 $0.07 $0.07 $1.23 capital improvement ‐ PHASE 9 Aeronautics 2021 Capital Investment Plan Total Prior Years 2021 After 2021 Location Division ID Priority Program Project Description Score $M $M $M $M Aeronautics | Airport AE21000036 1 | Reliability TERMINAL ROOF SPRINKLER SYSTEM 1 $0.63 $0.03 $0.60 $0.00 capital improvement Aeronautics | Airport PART 150 ACQUISITION & SOUND INSULATION AE21000037 1 | Reliability 1 $1.40 $0.07 $0.08 $1.26 capital improvement ‐ PHASE 10 Highway 2021 Capital Investment Plan Total Prior Years 2021 After 2021 Location Division ID Priority Program Project Description Score $M $M $M $M Highway | Roadway ADAMS‐ PAVEMENT REHABILITATION & Adams 607328 2 | Modernization 35 $8.83 $0.00 $1.00 $7.83 Reconstruction RELATED WORK ON ROUTE 8 ADAMS‐ SYSTEMATIC BRIDGE MAINTENANCE, A‐04‐001, ROUTE 8 (GROVE ST) OVER 609161 1 | Reliability Highway | Bridge $0.69 $0.20 $0.49 $0.00 ASHUWILLTICOOK RAIL‐TRAIL AND HOOSIC RIVER AGAWAM‐ RECONSTRUCTION OF ROUTE 187 Highway | Roadway Agawam 600513 2 | Modernization FROM 425 FT. SOUTH OF S. WESTFIELD STREET 26.5 $2.31 $0.51 $1.80 $0.00 Reconstruction TO ROUTE 57 (0.3 MILES ‐ PHASE I) Highway | Intersection AGAWAM‐ INTERSECTION IMPROVEMENTS AT 604203 2 | Modernization 63 $3.16 $2.49 $0.67 $0.00 Improvements ROUTE 187 & ROUTE 57 Highway | Roadway AMESBURY‐ RECONSTRUCTION OF ELM Amesbury 602418 2 | Modernization 43.5 $10.16 $1.53 $3.06 $5.57 Reconstruction STREET Highway | Roadway Arlington 609222 1 | Reliability ARLINGTON‐ SPY POND SEDIMENT REMOVAL $1.69 $0.00 $0.75 $0.94 Improvements ASHLAND‐ RECONSTRUCTION ON ROUTE 126 Highway | Roadway Ashland 604123 2 | Modernization (POND STREET), FROM THE FRAMINGHAM

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    148 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us