Country: I N D O N E S I a City: Banda Aceh, Bekasi & Mataram Status: ONGOING Key Sector(S): WASTEWATER P R O P O N E N

Country: I N D O N E S I a City: Banda Aceh, Bekasi & Mataram Status: ONGOING Key Sector(S): WASTEWATER P R O P O N E N

Country: I N D O N E S I A Status: Key Sector(s): ONGOING WASTEWATER City: Banda Aceh, Bekasi & Mataram Application approved: 14/DEC/2016 P R O P O N E N T S Geography and Population Banda Aceh Mataram The Republic of Indonesia is Hj. Illiza Sa’addudin Djamal, SE – Mayor Nazuruddin Fikri an archipelagic state located Head Division of Infrastructure in Southeast Asia. Almost Bekasi half of Indonesia’s Development, Bappeda Dadang Mulyana – Head Division of population of around 252 Infrastructure Development, Bappeda million lives in urban areas, facing issues in access to sustainable infrastructure service, particularly wastewater management. Central State Partner Other Partners Ministry of Public Works and Housing K E Y C I T Y D E V E L O P M E N T I S S U E S Although access to sanitation in urban Indonesia is high, it only considers the basic criteria of access and not safe collection and disposal of wastewater and septage, which leads to environmental degradation and poor health of the Intervention Areas urban population. Women are particularly exposed to poorer sanitation, often resulting in higher water borne disease incidence. Indonesia’s lack of sustainable Waste Water Management (WWM) services in urban areas derives from a combination of lack of infrastructure, poor governance and limited public and political support for improvement. Following up on the work of the national Accelerated Sanitation Development Program in Residential Areas (PPSP), this Sewerage System Development Project (SSDP) project aims to ensure safe disposal of wastewater by 100% of the population in target cities by (i) expanding centralized sewer systems and D E T A I L S O F C O O P E R A T I O N CDIA is responsible for delivering the Technical component of the SSDP. Supported activities include: a) Review existing studies, reports, data, and related information to map, quantify and determine the status and operational capability of current WWM assets. b) Prepare WWM feasibility studies (FS) for each city that include a review of alternative processes, construction methods and/or designs to be used for the infrastructure, followed by a selection of most appropriate process, method and/or design based on performance based specification. c) Carry out a high level climate and environmental and social assessment of potential WW investments to determine their expected impact and potential mitigation mechanisms. A separate consulting team will be hired by the ADB to carry out the finance, economic, institutional and due diligence (environmental, climate and social) tasks required to complete the Project Preparatory Technical Assistance (PPTA) work. E X P E C T E D D E V E L O P M E N T A L I M P A C T S - Improved treatment of household and industrial wastewater - Improved environmental conditions - Improved health of women and children PROJECT PERIOD MAY/2017 – JANUARY/2018 E X P E C T E D I N V E S T M E N T F O L L O W UP Est. infrastructure investment value 700 million US$ CDIA SUPPORT 730,000 US$ Potential sources of financing: ADB 600,000,000 $USD CITY CONTRIBUTION 118,000 us$ (in kind) .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us