S0600-Aa-Pro-060 0910-Lp-412-0500 Revision 1

S0600-Aa-Pro-060 0910-Lp-412-0500 Revision 1

S0600-AA-PRO-060 0910-LP-412-0500 REVISION 1 UNDERWATER SHIP HUSBANDRY MANUAL CHAPTER 6 SUBMARINE SONAR SYSTEMS This manual supersedes S600-AA-PRO-060 dated 15 April 1991. DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; administrative/operational use, 1 June 1996. Other requests for this document shall be referred to the Naval Sea Systems Command (SEA 09T). DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document. Published by direction of Commander, Naval Sea Systems Command 1 JUNE 1996 Change 1 dated 15 AUGUST 1999 S0600-AA-PRO-060 LIST OF EFFECTIVE PAGES Date of original pages is: 1 June 1996 Date of Change 1 is: 15 August 1999 Page No. * Change No. Page No. * Change No. Title and A . 1 6-32B blank . 1 Certification Sheet . 1 6-33 through 6-58. 0 blank . 0 6-59 through 6-59A . 1 Flyleaf-1 (Flyleaf-2 blank) . 1 i through iii. 0 6-59B blank . 1 iv blank . 0 6-60 through 6-68. 0 v. 1 6-69 through 6-71. 1 vi through vii . 0 6-72 through 6-103. 0 viii through x . 6-104. 1 blank. 0 6-1 through 6-20 . 0 6-105 through 6-121. 0 6-21 through 6-21A . 1 6-21B blank . 1 6-122 blank. 0 6-22 through 6-28 . 0 A-1 through A-5 . 0 6-29 through 6-32A . 1 A-6 blank . 0 * 0 in this column indicates an original page. A Change 1 S0600-AA-PRO-060 RECORD OF CHANGES ACN/FORMAL DATE *CHANGE ENTERED OF TITLE AND/OR BRIEF DESCRIPTION** ACN NO. BY CHANGE 1 8-15-99 Chain Hoist Caution *When a formal change supersedes an ACN, draw a line through the ACN number **Only message or letter reference need be cited for ACNs Flyleaf-1/(Flyleaf-2 blank) S0600-AA-PRO-060 TABLE OF CONTENTS Paragraph Page SECTION 1 SUBMARINE SONAR SYSTEMS 6-1.1 PURPOSE . .6-1 6-1.3 SCOPE. .6-1 6-1.5 APPLICABILITY . .6-1 SECTION 2 FAULT ISOLATION AND REPLACEMENT PROCEDURES FOR THE AN/BQN-3J (TR143) TRANSDUCER/TRANSDUCER CABLE ASSEMBLY IN TRIDENT I C4 SUBMARINES 6-2.1 GENERAL . .6-2 6-2.4 RECORDING RESULTS OF TESTS AND INSPECTIONS . .6-2 6-2.7 REFERENCE DOCUMENTS . .6-2 6-2.9 DRAWINGS . .6-2 6-2.10 TECHNICAL MANUALS AND HANDBOOKS . 6-4 6-2.11 SAFETY REFERENCES . .6-4 6-2.12 EQUIPMENT AND MATERIAL REQUIREMENTS. .6-4 6-2.13 SUPPORT AND TEST EQUIPMENT. .6-4 6-2.14 MATERIALS . .6-5 6-2.15 PRELIMINARY PROCEDURES. .6-5 6-2.20 PROCEDURAL STEP 1: FAULT ISOLATION . .6-5 6-2.30 PROCEDURAL STEP 2: FURTHER FAULT ISOLATION . 6-11 6-2.71 PROCEDURAL STEP 3: REPLACEMENT OF THE TRANSDUCER CABLE ASSEMBLY IN A DRY TRANSDUCER CAVITY. 6-18 6-2.109 PROCEDURAL STEP 4: REMOVAL OF A TRANSDUCER IN A DRY TRANSDUCERCAVITY. 6-21 6-2.124 PROCEDURAL STEP 5: REPLACEMENT OF A TRANSDUCER AND TRANSDUCER CABLE ASSEMBLY IN A DRY TRANSDUCER CAVITY. 6-27 6-2.170 PROCEDURAL STEP 6: REMOVAL AND REPLACEMENT OF A TRANSDUCER AND TRANSDUCER CABLE ASSEMBLY FROM A FLOODED TRANSDUCER CAVITY . 6-32 6-2.240 PROCEDURAL STEP 7: CONFIGURATION RESTORATION . 6-37 SECTION 3 FAULT ISOLATION AND REPLACEMENT PROCEDURES FOR THE AN/BQN-25 (TR143) TRANSDUCER/TRANSDUCER CABLE ASSEMBLY IN TRIDENT II D5 SUBMARINES 6-3.1 GENERAL . 6-47 6-3.4 RECORDING RESULTS OF TESTS AND INSPECTIONS . 6-47 6-3.7 REFERENCE DOCUMENTS . 6-47 6-3.9 DRAWINGS . 6-47 6-3.10 TECHNICAL MANUALS AND HANDBOOKS . 6-47 i S0600-AA-PRO-060 TABLE OF CONTENTS Paragraph Page 6-3.11 SAFETY REFERENCES . 6-49 6-3.12 EQUIPMENT AND MATERIAL REQUIREMENTS . 6-49 6-3.13 SUPPORT AND TEST EQUIPMENT. 6-49 6-3.14 MATERIALS. 6-50 6-3.15 PRELIMINARY PROCEDURES . 6-50 6-3.19 PROCEDURAL STEP 1: FAULT ISOLATION . 6-50 6-3.29 PROCEDURAL STEP 2: FURTHER FAULT ISOLATION . 6-55 6-3.41 PROCEDURAL STEP 3: REMOVAL AND RELACEMENT OF A TRANSDUCER AND TRANSDUCER CABLE ASSEMBLY . 6-59 6-3.111 PROCEDURAL STEP 4: CONFIGURATION RESTORATION . 6-71 SECTION 4 FAULT ISOLATION AND REPLACEMENT PROCEDURES FOR THE AB/BQN-25 (TR143) HYDROPHONE/HYDROPHONE CABLE ASSEMBLY AND MOUNTING INSERT IN TRIDENT II D5 SUBMARINES 6-4.1 GENERAL . 6-80 6-4.4 RECORDING RESULTS OF TESTS AND INSPECTIONS . 6-80 6-4.7 REFERENCE DOCUMENTS. 6-80 6-4.9 DRAWINGS . 6-80 6-4.10 TECHNICAL MANUALS AND HANDBOOKS . 6-80 6-4.11 SAFETY REFERENCES . 6-82 6-4.12 EQUIPMENT AND MATERIAL REQUIREMENTS . 6-82 6-4.13 SUPPORT AND TEST EQUIPMENT. 6-82 6-4.14 MATERIALS. 6-83 6-4.15 PRELIMINARY PROCEDURES . 6-83 6-4.17 PROCEDURAL STEP 1: FAULT ISOLATION . 6-83 6-4.24 PROCEDURAL STEP 2: HYDROPHONE REMOVAL . 6-83 6-4.44 PROCEDURAL STEP 3 HYDROPHONE MOUNTING INSERT INSPECTION AND REPLACEMENT . 6-96 6-4.48 PROCEDURAL STEP 4 HYDROPHONE/HYDROPHONE CABLE FAILURE ISOLATION . 6-96 6-4.54 PROCEDURAL STEP 5 HYDROPHONE AND CABLE ASSEMBLY REINSTALLATION. 6-96 SECTION 5 FAULT ISOLATION AND REPLACEMENT PROCEDURES FOR THE AN/BQN-25 THERMISTOR IN TRIDENT II D5 SUBMARINES 6-5.1 GENERAL . 6-106 6-5.4 RECORDING RESULTS OF TESTS AND INSPECTIONS . 6-106 ii S0600-AA-PRO-060 TABLE OF CONTENTS Paragraph Page 6-5.7 REFERENCE DOCUMENTS . 6-106 6-5.9 DRAWINGS . 6-106 6-5.10 TECHNICAL MANUALS AND HANDBOOKS . 6-106 6-5.11 SAFETY REFERENCES . 6-107 6-5.12 EQUIPMENT AND MATERIAL REQUIREMENTS. 6-107 6-5.13 SUPPORT AND TEST EQUIPMENT. 6-107 6-5.14 MATERIALS . 6-107 6-5.15 PRELIMINARY PROCEDURES. 6-107 6-5.17 PROCEDURAL STEP 1: FAULT ISOLATION . 6-110 6-5.25 PROCEDURAL STEP 2: THERMISTOR AND CABLE ASSEMBLY REMOVAL . 6-111 6-5.39 PROCEDURAL STEP 3: THERMISTOR AND CABLE ASSEMBLY REPLACEMENT . 6-112 APPENDIX A NSS: HYDROPHONE INSERT REMOVAL TOOL iii S0600-AA-PRO-060 THIS PAGE LEFT BLANK INTENTIONALLY iv S0600-AA-PRO-060 LIST OF ILLUSTRATIONS Figure Page 6-1 Flow Diagram of BQN-3 Transducer Fault Isolation and Replacement . .6-3 6-2 AN/BQN-3J Transducer/Transducer Cable Assembly Components . 6-10 6-3 Connection of Transducer Cable Assembly Hull Connector to Hull Penetrator . 6-12 6-4 Transducer Hull Window Assembly . 6-14 6-5 Connection of Transducer Cable Assembly Transducer Connector to Transducer Receptacle . 6-16 6-6 Transducer Lifting Device Installed . 6-22 6-7 Chain Hoist Rigged . ..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    147 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us