The Director, Dt. 05 / 10 / 2017 Ministry of Environment, Forests & Climate Change, Indira Paryavaran Bhavan, Jor Bagh Road, New Delhi – 110 003

The Director, Dt. 05 / 10 / 2017 Ministry of Environment, Forests & Climate Change, Indira Paryavaran Bhavan, Jor Bagh Road, New Delhi – 110 003

The Director, Dt. 05 / 10 / 2017 Ministry of Environment, Forests & Climate Change, Indira Paryavaran Bhavan, Jor Bagh Road, New Delhi – 110 003. Sub.:- Environment Clearance – Expansion of Existing Hospital cum Medical campus Project (“Sreevalsam Institute of Medical Sciences”) at Survey Nos. 157/2, 159/3 & Others of Edappal Village, Ponnani Taluk, Malappuram District, Kerala– Application & Draft ToR Submission – Reg. Respected Sir, We have an existing hospital project (with Plot area = 9.4534 ha. & Built-up area = 53,889.72 sq. m.) at Edappal Village, Ponnani Taluk, Malappuram District, Kerala and we are going for expansion of this existing hospital project. Attached herewith are the following documents for obtaining Environment Clearance for the above project as per MoEF Notification S.O. 804(E) dt. 14/03/2017. The attached documents are: 1. Duly filled Form -1 (Appendix I) 2. Duly filled Form – 1A (Appendix II) 3. Conceptual Plan 4. Draft Terms of Reference (ToR) You are requested to consider our application and approve the Terms of Reference at the earliest. Thanking you, Yours respectfully, (Mr. Rajan Achuthan Nair) Secretary & Authorize Signatory APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Details Item No. 1. Name of the project/s Environmental Clearance for expansion of the existing Medical campus Project (“Sreevalsam Institute of Medical Sciences”) to be developed by M/s Sreevalsam Educational Trust 2. S. No. in the schedule 8 (a), Construction Project with total built-up area 1,38,937.5 sq.m. which is more than 20,000 sq. m. and less than 1,50,000 sq. m. 3. Proposed capacity / area / length / Total Plot Area = 9.4534 ha. tonnage to be handled/command (94,534.56 sq. m.) area/lease area/ number of wells to Total Built-up Area = 1,38,937.5 sq. m. be drilled (Existing + Proposed) Total Beds = 1,170 beds 4. New/Expansion/Modernization Expansion 5. Existing capacity/area etc., Built-up area = 53,889.72 sq.m. Plot area = 9.4534 ha. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ as per EIA Notification, 2006 & Category ‘A’ as per MoEF&CC Notification No. S.O. 804(E) dt. 14/03/2017 7. Does it attract the general condition? NO If yes, please specify 8. Does it attract the specific condition? NO If yes, please specify 9. Location Survey Nos. 157/2, 159/3, 158/1, 157/0, 158/1, 159/3, 158/2, 158/5, 159/1, 159/2, 157, 159/3, 164/3, 164/7, 164/4, 163/3, 158/7, 158/3, 158/4, 166/2, 166/1, 156/3, 164/1, 156/3, 164/1, 164/2, 156/4, Edappal Village, Ponnani Taluk, Malappuram District, Kerala. Plot/Survey/Khasra No. Survey Nos. 157/2, 159/3, 158/1, 157/0, 158/1, 159/3, 158/2, 158/5, 159/1, 159/2, 157, 159/3, 164/3, 164/7, 164/4, 163/3, 158/7, 158/3, 158/4, 166/2, 166/1, 156/3, 164/1, 156/3, 164/1, 164/2, 156/4 Village Edappal Tehsil Ponnani District Malappuram State Kerala 10. Nearest railway station/airport along The nearest railway station (Kuttipuram with distance in Kms Railway Station) is about 12 km. (N) and Calicut International Airport, Karipur is about 61 Km. (N) away from the project site. 11. Nearest Town, city, District Edappal - about 2.5 km. Headquarters along with distance in Calicut City - about 75 km. Kms Civil Station, Malappuram – about 51 km. 12 Village Panchayats, Zilla Parishad, Village Office address :- Municipal Corporation, Local body Village officer, (complete postal addresses with Edappal Village Office. telephone nos. to be given) Edappal P.O., Ponnani taluk, Malappuram District, Kerala-679576. Panchayat Office address :- Panchayat Secretary, Edappal Grama Panchayat, Edappal P.O., Malappuram District, Kerala-679576. Ph. 0494-2680236. 13 Name of the applicant M/s Sreevalsam Educational Trust 14 Registered Address M/s Sreevalsam Educational Trust, Reg. No. 53/2010, Regd. Office : Thekke Madhom Road, Thrissur, Kerala-680001. Address for correspondence : M/s Sreevalsam Educational Trust, Reg. No. 53/2010, Regd. Office : Thekke Madhom Road, Thrissur, Kerala-680001. Name Mr. Rajan Achuthan Nair Designation (Owner/Partner/CEO) Secretary Address Mr. Rajan Achuthan Nair, M/s Sreevalsam Educational Trust, Reg. No. 53/2010, Regd. Office : Thekke Madhom Road, Thrissur, Kerala-680001. Pin Code Kerala-680001. E-Mail [email protected] [email protected] Telephone No. 0487-2430114 Mobile No. 09539641006 Fax No. N.A. 16 Details of Alternative Sites examined, Not Applicable if any. Location of these sites should Village-District-State be shown on a topo sheet 1. 2. 17 Interlinked Projects Not applicable 18 Whether separate application of NO interlinked projects has been submitted? 19 If yes, date of submission N.A. 20 If no, reason N.A. 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? NO (b) The Wildlife (Protection) Act, 1972? NO (c) The C.R.Z Notification, 2011 ? NO 22 Whether there is any Government NO Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation pending NO against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Due to the expansion activities, there land use, land cover or will be permanent change in land use, topography including increase in land cover or topography including intensity of land use (with respect increase in intensity of land use. to local land use plan) The project is an expansion of existing Sreevalsam Institute of Medical Science and is located at Edappal Village which is falling in Gama Panchayat limits of Edappal Grama Panchayat. During construction phase, about 200 workers will be at site. During operation phase on full occupancy of after the proposed expansion, the maximum population expected is 10,630 persons (floating / fixed population) and hence there is increase in the intensity of land use. (Source: population is calculated based on NBC). 1.2 Clearance of existing land, Yes There are some of native trees and vegetation and buildings? different varieties of shrubs, herbs, climbers existing at site. For construction of new buildings, there will be clearance existing trees and different varieties of shrubs, herbs. 1.3 Creation of new land uses? Yes The proposed project is an expansion of existing Sreevalsam Institute of Medical Science campus. It is proposed to construct new buildings with supporting additional infrastructure facilities. 1.4 Pre-construction investigations Yes Pre-construction Soil Investigation has e.g. bore houses, soil testing? been carried out for the site. It is reported that, the water table is at higher level. 1.5 Construction works? Yes The project is an expansion of existing campus. It is proposed to construct new buildings with supporting infrastructure. 1.6 Demolition works? No Demolition work is not required. 1.7 Temporary sites used for Yes All the construction activity including construction works or housing of stalking of building materials will be construction workers? confined within the project site only and temporary shed would be constructed for storage of cement and other construction materials. Labour hutments for about 200 workers are proposed within the site. 1.8 Above ground buildings, Yes It is proposed to construct some new structures or earthworks including buildings within the existing campus. linear structures, cut and fill or The max. no. of floor after the excavations proposed expansion will be of LG + Gr. + 5 floors. Excavation of earthwork for the foundation of structures will be carried out. The top soil which is fertile will be kept at site for landscaping work. The excavated soil will be used for back filling work and for internal road construction purposes. There is a topographical level difference of about 12 m. between north to south direction. As far as possible, this level difference will be used in building design. 1.9 Underground works including No No underground works including mining or tunneling? mining / tunneling required. 1.10 Reclamation works? No No reclamation work required. 1.11 Dredging? No No dredging work required. 1.12 Offshore structures? No No offshore structure required. 1.13 Production and manufacturing No No production / manufacturing process processes? involved. 1.14 Facilities for storage of goods or Yes Separate raw material store of cement materials? and other construction materials will be made within the project premises. Bricks and steel will be laid in open. 1.15 Facilities for treatment or disposal Yes Construction phase :- of solid waste or liquid effluents? Solid waste generation from the project due to the labor colony during construction phase will be about 80 Kg/day and domestic sewage will be about 11 KL/day. The non- biodegradable waste and other packaging material generated as construction debris will be segregated and stored separately. The recyclable non-biodegradable waste salvaged from the debris like cement blocks, wood, iron bars, aluminium sections, etc. would be re-used or sold to the vendors. The inert construction debris will be disposed for land filling or back filling. The bio-degradable solid waste will be disposed in a bio-bin system for microbial composting and a mobile STP for the treatment of domestic sewage from the labour colony.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    45 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us