Enterprise Square, Skypark, Exeter Setting the Highest Standard in Sustainability New Build Offices

Enterprise Square, Skypark, Exeter Setting the Highest Standard in Sustainability New Build Offices

One Enterprise Square Two Enterprise Square 4,941 – 15,115 sq ft (459 – 1,404 sq m) 5,582 – 17,142 sq ft (518 – 1,592 sq m) UNDER CONSTRucTION This is a Computer Generated Image, details may vary. Enterprise Square, SkyPark, Exeter Setting the highest standard in sustainability New Build Offices. Planning Approved. Available FOR SALE or TO LET skyparkexeter.com KC PROOF SkyPark SkyPark is a partnership between St. Modwen, the UK’s leading regeneration specialist, and Devon County Council. As the cornerstone of the Exeter and East Devon New Growth Point, SkyPark is the South West’s most significant business park development. It will combine environmentally sustainable office and industrial space with a hotel, local facilities and a combined heat and power plant providing district heating, all in a landscaped environment of more than 100 acres. SkyPark is a cutting edge business park development sitting in a prime location adjacent to Exeter International Airport and is accessed via the new Clyst Honiton Bypass which provides a direct link onto the A30 and to Junction 29 of the M5. The new DCHG building The images on this page are Computer Generated, details may vary. Enterprise Square, SkyPark KC PROOF Your O 19.41 DWHL 5 L19.3 DWH 2 L19.1 DWH 19.27 DWHL 18.91 WHL pportunity D 11 19. DWHL .74 HL18 DW 92 HL18. 19.33 DW SWHL 18.75 DWHL 19.12 SWHL 6 L18.4 DWH O HT 2 5.79 18.96 SWHL 18.49 DWHL 7 L18.2 L18.81 DWH SWH 28 2 HL18. L18.2 DW DWH 18.68 SWHL 18.20 DWHL 18.55 SWHL L18.00 0 DWH L18.0 DWH 18.39 SWHL 18.20 SWHL 18.02 SWHL O H T 26.20 17.86 By joining us at SkyPark you will SWHL 7.69 SWHL1 7.60 SWHL1 .54 become part of a groundbreaking SWHL17 .54 SWHL17 5 DWHL17.5 DWHL19.01 DWHL18.86 DWHL18.81 DWHL19.16 DWHL19.26 .64 DWHL19.36 DWHL17 DWHL20.42 DWHL20.37 DWHL20.33 DWHL19.41 DWHL20.52 DWHL20.49 DWHL20.45 DWHL20.40 19.59 .37 9.26 DWHL20.70 DWHL20.67 DWHL20.64 DWHL20.63 DWHL20.60 DWHL20.55 DWHL DWHL19 DWHL1 DWHL20.78 DWHL20.80 DWHL20.77 DWHL20.72 DWHL20.74 DWHL20.73 HL19.73 DWHL17.73 DWHL20.82 DWHL20.83 DWHL20.81 DWHL20.79 DWHL20.78 DW WHL19.44 DWHL20.81 DWHL20.81 HL19.90 D m DWHL20.76 DW 4 DWHL20.68 .5 HL20.06 8 DWHL20.23 DWHL20.26 DWHL20.46 DWHL20.58 DW 1 .62 DWHL20.17 DWHL19 BM S L20.27 SWHL17.98 WH DWH L17 DWHL20.34 9 .90 DWHL19.79 SWHL18.0 DWHL19.14 SWHL18.18 DWHL20.54 DWHL19.24 SWHL18.94 SWHL18.63 SWHL18.48 SWHL18.32 development which seeks to embody DWHL20.80 DWHL20.80 DWHL20.79 DWHL20.72 DWHL20.68 DWHL20.67 5 SWHL19.05 SWHL18.78 DWHL20.79 DWHL20.80 DWHL20.45 DWHL19.9 DWHL20.50 DWHL20.48 DWHL19.38 DWHL17.92 DWHL20.15 .57 DWH DWHL19 L20.76 DWHL20.25 DWHL19.67 DWHL20.35 DWHL20.41 L19.86 DWHL20.58 DWHL20.55 DWHL20.52 DWH D DWHL20.82 W DWHL20.83 H 3 0 L DWHL20.85 DWHL20.75 DWHL20.73 DWHL20. DW DWHL20.77 1 HL20.64 7 DWHL20.68 DW . HL20.69 6 20.19 DWHL 5 DWHL20.66 DWHL20.65 DWHL20.65 DWHL20.36 sustainable principles at their broadest DWHL20.47 DWHL20 DWHL20.48 .70 DWHL20.70 DWHL20.51 DWHL20.79 DWHL20.69 DWHL20.67 DWH DWHL20.63 DWHL20.58 DWHL20.55 DWHL20.87 L20.85 DWHL20.72 L20.64 L DWHL20.95 DWHL20.96 DWHL20.91 DWHL20.89 DWH DWHL20.81 DWHL20.76 DWHL20.79 levels, whilst addressing social, ay-by economic and environmental objectives. The vision for the site is to realise the full economic potential of Exeter as G A BI O N a major regional centre, providing a BA S K E T S ALL D W HEA GATES range of employment opportunities and ICE SLU highlighting the area as a self-sufficient, new urban community. Your N DPD The offices will be set on either side of the street, which ewis a pedestrian O zone L ASOC running the full extent of the park from ay-by D WHL 20.23 D WHL 20.26 D WHL 20.46 DWHL 20.58 DWH L20.68 D WHL 20.76 D WHL 20.81 DWHL 20.81 D WHL D 20.6 WHL 4 20.82 D DW WHL HL20 20.68 .83 DW D HL20 WHL .69 20.81 DWHL the gateway entrance off the Clyst 20.79 D ffice WHL 20.7 D 8 WHL 20.66 DW D HL20 WHL .76 20.80 D WHL 20.65 DWHL 20.78 DW HL2 0.65 D WHL 20.77 D WHL DW 20.72 HL2 0.70 DW HL20. 80 DWH D L20. WHL 74 20.70 DWH L20.8 DWH 0 DWH L20.7 L20.7 9 D 3 WHL 20.82 D WHL 20.79 D WHL DW 20.70 HL 20.79 D WHL D 20.8 WHL 3 20.87 D DWH WHL L20.6 20.80 7 D WHL 20.95 D D WHL WHL 20.64 20.85 DWH L20. D D 63 WHL WHL 20.96 20.72 D WHL 20.60 D DWH WHL L20.6 20.91 8 DWH L20.7 DWH Honiton Bypass. 7 L20.6 DW 7 HL 20.55 D WHL 20.89 DWH L20.5 DW 2 HL2 DWHL 0.75 20.85 DW HL20 D .73 WHL 20.49 D WHL 20.81 D WHL 20.45 D WHL 20.76 DWHL 20.40 D WHL 20.79 D WHL 20.54 D WHL 20.42 D WHL 20.72 D WHL 20.50 D WHL 20.37 DWHL 20.69 DWH L20.5 DWHL 8 20.48 D WHL 20.33 D WHL 20.67 DWH D L20. WHL 45 20.55 D WHL 20.64 D WHL 20.52 D WHL 20.63 DWH L20.34 D WHL 20.58 DWH L20.27 DWHL 20.55 DW HL20 .41 DWH L20.17 DW HL20 .51 DW HL20.3 DWH 5 L20.06 DW DW HL20. HL20. 48 25 DWH L19.90 DWH L20.15 DWH L20.47 DWH L19.73 DW HL19.95 DWH L20.3 DW 6 HL19 DW .59 HL19.79 DW HL20.19 DW HL19.62 DWH L19.41 DW DWHL D HL19.3 20.03 WHL19.4 6 4 D WHL19.37 D D WHL1 WHL19.86 9.26 D WHL19.26 DW HL19.1 DW 6 HL19.67 The street will be a vibrant landscaped DWHL 19.57 DWHL 19.01 D WHL19.38 DWH L19.24 DWHL 18.86 D WHL1 DWHL 9.14 18.81 SWH L19.05 SW HL 18.94 SWHL 18.78 S WHL 18.63 SWHL 18.48 SWHL 18.32 O HT 25 .79 SWH L18.18 BM SWH L18.09 18.5 SWH L17.98 4 SW m H L1 7. area with water features and communal 90 DWHL19.41 DW HL17.73 D WHL17.64 DW HL17.92 DWHL18.91 DWHL19.12 DWHL19.35 DWHL17 DWHL18.0 DWHL18.22 DWHL18.74 .55 0 DWHL18.46 SWHL1 D L18.27 7.54 DWHL18.00 WHL18.28 DWH DWHL18.20 DWHL18.49 D W DWHL18.75 S H WHL17.54 DWHL18.92 L DWHL19.11 1 DWHL19.27 7 SW . HL17.60 6 5 SWHL17.69 SWHL17.86 SWHL18.20 SWHL18.02 SWHL18.39 SWHL18.55 SWHL18.68 SWHL18.81 SWHL18.96 SWHL19.12 SWHL19.33 O H T 26 .2 0 areas for employees to meet and relax. I D L I D L = = = = 0 1 0 1 . 6 3 6. 3 M 1 M 0 0 G 4 A B I ON B A SK E T S HEAD WALL SLUICE GATES Subs tation I D L = I D = L 0 1 = = . 6 0 3 1 . M 6 1 3 . 0 M 0 4 Indicative masterplan 4 EON Energy Centre BUILDING Entrance 0 E N 9 H 2 0 9 1 99 1 4 1 8 2 3 . 7 1 9 7 F 7 3 4 G 7 . 4 1 2 5 7 3 2 GRAV EL IL GRA D I = = D L 1 S = 0 6 = S 1 . 0 3 6. 1 . M 5 3 1 M 6 E NG LDI BUI I D L I D = = L 0 1 = = . 6 0 1 3 . 6 M 3 2 . M 9 2 9 IL D = DE CI = 1 DU I OU L 0 6 S D= = . 1 3 1 0 6 M 5 .3 .1 M 6 IL=16.52 D=0.15M 0 IL=16.5 D=0.15M GRAVEL 0 E 9 N 0 H 2 DEC 1 IDUOUS 9 9 1 1 4 9 3 8 DE 2 7 CI FG DU . 7 O 9 US 1 4 D 3 E Co CI ncete 7 DU . 1 O . U 7 2 B S B 4 W W R R A A O O L L 7 K K L L 5 E E N N 3 2 GRASS IL D= = I L D 1 0 = 6 = . 1 3 0 . 2 6 M . 9 3 . M 2 9 C on cre te DE CI DU O U S D ECI DU O U S DECI D UOU S 2 16.5 IL= 5M 0.1 0 D= 6.5 =1 M IL .15 DCHG D=0 I I D D L L = = = = 1 0 1 1 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us