Techniques Transit Service Standards, Routing, and Scheduling

Techniques Transit Service Standards, Routing, and Scheduling

21 Session Summary The workshop participants concluded that there is a need The mix of long-range versus short-range planning to improve the productivity of the planning process. in a small urban area is quite often defined by federal Three keys to this are and state regulations. Most of this, however, deals with administrative requirements. The comprehensive plan- Providing quick responses to decision makers, ning process provides an opportunity to develop a per- Providing technical assistance to implementors, and spective of the future in order to facilitate the short- Identifying the most effective solutions. range planning decisions being made in the present. There is inherent flexibility and.creativity available These three areas are closely identified with establish- within the current planning process because the regu- ing better credibility for planners. latory requirements deal primarily with administrative The image of local planners is considered to be poor. matters. Often, the local planner does not understand the decision- Long-range planning in many small urban areas has making process. Effective communication between local traditionally been highway oriented, but a significant elected officials and planners is essential and, in general, change could be fostered by the effects of economic and is lacking in most areas. The workshop participants felt energy-related issues, which could cause a major shift that planners should help the elected officials to identify toward transit. Obviously, short-range planning is the the difficult issues and also the solutions (or at least the major thrust in smaller areas; therefore, smaller com- alternatives) in order to facilitate the decision-making munities may be more responsive to changes brought process. about by economic, environmental, and energy issues. Techniques George E. Gray. Mass Transportation Division, California Department of Transportation. Sacramento, Chairman David M. Levinsohn, Office of Transportation and Land-Use Policy, Environmental Protection Agency, Recorder The scope of this session workshop included an emina- tion of public transit in small urban areas; tion of all aspects of public transportation planning, im- Assessment of the available techniques in the plementation, and operation in small urban areas. Spe- three areas and of the availability of these techniques; cifically, three issues were addressed: and Assessment of the marginal improvements that 1. Identification of the categories of techniques that may be needed to improve these existing techniques. are useful in the planning, implementation, and opera- Transit Service Standards, Routing, and Scheduling David Rynerson, Lane Transit District, Eugene, Oregon The governments of Eugene. Springfield, and Lane County. Oregon, re- changes. Schedule changes are made three times a year, route changes cently adopted a multimodal transportation plan that has forecasts to are made annually. Routes and schedules are adjusted as necessary to the year 2000. Serving this area is the Lane Transit District. The board achieve long- and short-range goals. The transportation plan for the of this district recently developed short-range objectives for fixed-route Eugene-Springfield area calls for implementation of a bus rapid transit service designed to interface with the year 2000 plan. These objectives system supported by local buses. A key element of the plan is the con- include a goal of a ratio of fare-box revenue to operating cost of 25 per- struction of 10 major and 10 minor transit stations throughout the cent by 1982. Lane Transit District offers three types of service: urban metropolitan area. fixed route, nonurban fixed route, and urban dial-a-bus. The service standards considered most important to the development program in- clude coverage, travel time, availability, and accessibility. Route and schedule adjustments originate from public and employee suggestions, which are considered as part of a periodic route-and-schedule review. Sur- The Lane Transit District in Oregon operates a fleet of veys and passenger-opinion data are collected regarding any proposed 61 transit coaches and six dial-a-bus vehicles in a ser- 22 Table 1. Productivity by time period: October11, 14, and 15, sideration of the adopted service standards by which the 1978. system is designed. Productivity (rides/vehicle-h) DESCRIPTION OF SYSTEM Urban Nonurban Total Time Period Routes Routes Routes Lane Transit District offers three basic types of service: Morning peak (6:00-9:00 am.) urban fixed route, nonurban fixed route, and urban dial- Weekday 27.61 10.20 24.88 a-bus. These can be characterized as follows: Saturday 7.17 2.85 6.49 Midday Weekday (9:00 a.m. -2:00 p.m.) 26.19 12.05 24.64 Urban Fixed Route Saturday (9:00 am. -7:00 p.m.) 22.99 9.40 21.27 Weekday afternoon peak (2:00-6:30 p.m.) 35.01 10.00 30.96 The urban fixed-route service has a flat fare. The base Evening is $0.35; discounts are available to the elderly, children, Weekday (6:30 p.m. -12:00 m.) 10.72 6.55 10.59 and young people; an unlimited monthly pass and dis- Saturday (7:00 p.m. -12:00 m.) 9.00 4.83 8.72 Sunday 19.81 19.81 counted tokens can be obtained. The routes are pri- marily radial from the central business district, except that they are pinched together at other major activity centers; extensive use is made of end-of-line loops; there Table 2. Productivity by day: May 1978. are overlapping routes that have staggered schedules on major lines; in most developed areas, access is within Total Vehicle Avg Total (platform plus Total Productivity 0.4 km (0.25 mile). Schedules allow standard clock Service Rides turn-in) Time (h) (rides/vehicle-h) headways of 30 min in the daytime, 60 min in the eve- Fixed Route ning, 15 and 30 mm, respectively, on lines that have Monday-Friday 15 493 733.2 21.1 overlapping routes; schedules pulse every 15 min from Saturday 9 825 694.5 14.1 the layover point in the central business district. Sunday and holiday 1 461 83.3 17.5 Dial-a-bus' Monday-Friday 105 48.0 2.2 Nonurban Fixed Route Saturday 51 24.0 2.1 Sunday and holiday 0 0 Including transfers. The nonurban fixed-route service has a zonal fare sys- 'Onehall of dial-a-bus riders are wheelchair.boond and ,,rost are elderly or handicapped (or both) tem of $0.15-increments at approximately 11-km (7- mile) intervals; discount rates are the same as those of the urban system. The routes connect major satellite vice area that has a population of 210 000. This service communities to the metropolitan area and serve points area includes the Eugene -Springfield metropolitan area, between; branching is used to provide additional off-peak the second largest in the state, and central and eastern coverage. The schedules vary depending on route length Lane County, which contains rural and small urban areas and reverse-commute timing. and has a population of 30 000. Urban Dial-a-Bus STATUS OF PLANNING The urban dial-a-bus service has a flat fare of $0.70; The general-purpose governments of Eugene, Spring- discounted tokens are available, and the service of at- field, and Lane County recently adopted a metropolitan- tendants is free. All handicapped persons are eligible area transportation plan that is multimodal and includes to use the service (identification is through a physician, forecasts to the year 2000. The plan includes year 2000 social service agency, or volunteer program) as are all goals for transit modal split for the various jurisdictions persons more than 62 years old. All vehicles are lift that vary from 5 percent in Springfield to 15 percent in equipped, and 49 percent of the riders are in wheel- Eugene. The areawide average would be about 13 per- chairs. The coverage is in the many-to-few mode on cent. Currently, the transit modal split is about 2.4 weekdays (home to 30 selected destinations) and the percent. With a forecasted areawide increase in popu- many-to-many mode on Saturdays; priority is given to lation of 60 percent, a massive increase in transit rider- subscription passengers. ship will be necessary to achieve this goal. Although the different types of service are actually The Lane Transit District Board is in the process of integrated at many levels, they are often separated for adopting short-range quantitative objectives for fixed- analysis purposes. Allocation of cost and ridership data route service. Indicators that have been selected for involves some arbitrary assumptions, but this approach these objectives include total ridership, vehicle pro- is necessary to satisfy policy-level information require- ductivity, the ratio of the fare-box revenue to the op- ments. Some statistics that have been generated to an- erating cost (expressed as a percentage), and cost per swer questions about urban versus nonurban fixed-route person trip. services and fixed-route versus dial-a-bus services are The board has indicated that it will adopt as a goal a given in Tables 1 and 2. ratio of fare-box revenue to operating cost of 25 percent, to be achieved by 1982. Goals will be selected for the SERVICE STANDARDS other indicators that are consistent with this goal but reflect a strategy to be chosen by the board during the The transit development program adopted includes the annual updating of the transit development program. following service standards: Strategies that could be chosen to achieve the 25 per- cent objective include increasing fares, reducing low- 1. Coverage-access distance to the nearest bus stop: productivity services, and actions to increase ridership. The distance from home or business in the urbanized All of these strategies have the potential for counter- area to the nearest bus stop should not exceed 0.4 km; productive results.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us