Improvements to FM 1560 and SH 16

Improvements to FM 1560 and SH 16

FM 1560 & SH 16 Open House Public Meeting August 14, 2014 FM 1560 Re-Alignment at SH 16 FM 1560 RE-ALIGNMENT AT SH 16 & SH 16 SUPERSTREET CONCEPT . OPEN HOUSE PUBLIC MEETING Helotes City Hall . August 14, 2014 12951 Bandera Road . 5:00 p.m. – 7:00 p.m. Helotes, Texas 78023 FM 1560 Re-Alignment at SH 16 FM 1560 Project Location FM 1560 Re-Alignment at SH 16 3 Need and Purpose .Need –Current alignment of FM 1560 – SH 16 intersection restricts traffic flow, leading to traffic congestion .Purpose –Improve operational functioning and safety of FM 1560 - SH 16 intersection FM 1560 Re-Alignment at SH 16 4 Project Information .Project selected as part of the Alamo Area Metropolitan Planning Organization’s call for projects STP-MM (Cat 7 funds) .Project submitted by City of Helotes and TxDOT FM 1560 Re-Alignment at SH 16 5 Crash History LEGEND 2013 2012 2011 2010 2009 2008 FM 1560 Re-Alignment at SH 16 6 Travel Patterns . FM 1560 to SH 16 NB – Turn south on SH 16 and U-Turn . Circle A Trail to SH 16 SB – Turn north on SH 16 and U-Turn . FM 1560 SB to Circle A Trail – U-Turn south of Circle A Trail FM 1560 Re-Alignment at SH 16 7 Typical Section Existing FM 1560 Generally Includes: . Two 12’ travel lanes (one in each direction) . 4’ striped median . Two 4’ outside shoulders . Open ditch FM 1560 Re-Alignment at SH 16 8 Typical Section Proposed FM 1560 Generally Includes: . Four 11’ travel lanes (two in each direction) . Raised Center Median with 2’ inside shoulders . Two 5’ outside shoulders . Adding curbs and sidewalk along both sides of road FM 1560 Re-Alignment at SH 16 9 Typical Section Proposed SH 16 Generally Includes: . Six 12’ thru lanes (three in each direction) . One 12’ U-Turn lane . Dedicated Right Turn Lane to Circle A Trail . Raised Center Median with 2’-6” inside shoulders . Two 4’ outside shoulders FM 1560 Re-Alignment at SH 16 10 Project Description . Relocate FM 1560 at SH 16 intersection . Expand FM 1560 from 2 lanes to 4 lanes with a with a raised center median – Proposed FM 1560 will have curb and 6’ sidewalks . Reconstruct intersection with Riggs Road . Implement SH 16 Super Street Concept – Right turn only from FM 1560 to SH 16 – U-Turns on SH 16 FM 1560 Re-Alignment at SH 16 11 Environmental Assessment The following environmental factors will be studied as part of the environmental impacts analysis process: . Geology . Noise . Archeological and historic resources . Threatened and endangered species . Streams, wetlands, floodplains . Socioeconomic resources . Hazardous materials sites . Vegetation FM 1560 Re-Alignment at SH 16 12 Project Funding .Total Estimated Project Cost: $5 Million FM 1560 Re-Alignment at SH 16 13 Project Schedule . Current Let Date: December 2015 . Construction Duration: Approximately 18 Months FM 1560 Re-Alignment at SH 16 14 SH 16 Superstreet Limits End Project Begin Project FM 1560 Re-Alignment at SH 16 15 SH 16 Superstreet .Superstreet Concept –Replace existing cross overs and signalized intersections with dedicated turnaround lanes and direct in left turn lanes –Signals would be coordinated to improve through movements on SH 16 FM 1560 Re-Alignment at SH 16 16 SH 16 Superstreet Example Turnaround to head North on SH 16 FM 1560 can make right- turn only Leslie Rd can make right- turn only Turnaround to head South on SH 16 FM 1560 Re-Alignment at SH 16 17 SH 16 Superstreet .SH 16 at LP 1604 Intersection –Displaced Left Turn Intersection (DLT), also known as a Continuous Flow Left Intersection –Innovative Interchange design to reduce delay at this busy intersection –Similar intersection in San Marcos at IH 35 at Aquarena Springs Dr, opened in May 2014 FM 1560 Re-Alignment at SH 16 18 SH 16 at LP 1604 Intersection And then get onto the LP 1604 frontage Rd Then use the Northbound SH 16 turnaround Left turn vehicles lanes stop here FM 1560 Re-Alignment at SH 16 19 Project Schedule .Current Let Date: Project is not scheduled for construction at this time .Project is Currently not Funded .TxDOT will continue to partner with the City to advance projects FM 1560 Re-Alignment at SH 16 20 Provide Your Comments Options for Commenting 1. Give comment card to TxDOT staff tonight 2. Fax comments to: (512) 349-0727, Attn: Lauren Avioli 3. Email comments to: [email protected] 4. Mail comments to: CP&Y, Inc. Attn: Lauren Avioli 13809 Research Blvd, Suite 300 Austin, Texas 78750 Deadline for comments : August 24, 2014 . Public Meeting Report will be posted at www.txdot.gov when analysis is complete FM 1560 Re-Alignment at SH 16 21 Closing Remarks Thank You for Your Participation! FM 1560 Re-Alignment at SH 16 22 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us