REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 April 2019 Date No. Company Name and Address Project Name Approved Sampaguita St., Doña KARPA BUILDERS AND 1 Francisca, Balanga City, Construction of Streetlights Barangay Bantan Munti, Pilar, Bataan 3/26/2019 TRADING Bataan BPQ CONSTRUCTION AND Doña Francisca, Balanga 2 Rehabilitation of Seawall Barangay Tortugas, Balanga City, Bataan 3/26/2019 TRADING City, Bataan Repair / Rehabilitation of Fourteen (14) Classroom School Building POLYMER-VIC Doña Francisca, Balanga 3 at A.G. Llamas Elementary School, Barangay Poblacion, Mariveles, 3/26/2019 CONSTRUCTION City, Bataan Bataan POLYMER-VIC Doña Francisca, Balanga Construction of Slope Protection Talimundoc-Doña Road Barangay 4 3/26/2019 CONSTRUCTION City, Bataan Talimundoc, Orani, Bataan PACKAGE 2 a.) Design & Build for the Construction of Two (2) Storey Four (4) Classroom School Bldg Sto. Niño Elem. School, Dinalupihan, Bataan; b.) Design & Building for the Construction of Two (2) Units Two (2) Storey Four (4) Classroom School Bldg San POLYMER-VIC Doña Francisca, Balanga 5 Ramon Elem. School, Dinalupihan, Bataan; c.) Design & Build for 3/26/2019 CONSTRUCTION City, Bataan the Construction of Two (2) Storey Four (4) Classroom School Building Colo Elem. School, Dinalupihan, Bataan; d.) Design & Build for the Construction of Two (2) Storey Four (4) Classroom School Bldg Pinulot Elem. School, Dinalupihan, Bataan Sunflower St., Doña E.R. VENZON Rehabilitation of Drainage System at Barangay Camacho, City of 6 Francisca, Balanga City, 3/26/2019 CONSTRUCTION Balanga, Bataan Bataan Construction of Concrete Revetment at Barangay Munting 7 RCS CONSTRUCTION #461 Yakal St., Panilao, Pilar 3/26/2019 Batangas, City of Balanga, Bataan Construction of Multi-Purpose Building at Barangay Pto. Rivas 8 RCS CONSTRUCTION #461 Yakal St., Panilao, Pilar 3/26/2019 Lote, City of Balanga, Bataan 9 RCS CONSTRUCTION #461 Yakal St., Panilao, Pilar Upgrading of Road at Barangay Sibacan, City of Balanga, Bataan 3/26/2019 T-DEL ROSARIO Phase 1, St. Mary’s Subd., 6019606 – Concreting of Farm to Market Road, Cardona, Gerona, 10 3/26/2019 CONSTRUCTION Brgy. Matatalaib, Tarlac City Tarlac Page 1 of 55 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 April 2019 Date No. Company Name and Address Project Name Approved T-DEL ROSARIO Phase 1, St. Mary’s Subd., 6019593 – Concreting of Farm to Market Road, Amacalan, Gerona, 11 3/26/2019 CONSTRUCTION Brgy. Matatalaib, Tarlac City Tarlac Suite 906 Cityland, Herrera RICHWORLD AIRE & Globe Telecom Inc. Three Legged Self Supporting Tower, Sitio 12 Tower, 98VA Rufino St. cor. 3/26/2019 TECHNOLOGIES CORP. Delaen, Brgy. Masalipit, San Miguel, Bulacan Valero St., Makati City Suite 906 Cityland, Herrera RICHWORLD AIRE & Globe Telecom Inc. Three Legged Self Supporting Tower, #59 13 Tower, 98VA Rufino St. cor. 3/26/2019 TECHNOLOGIES CORP. Hilerang Mangga, Brgy. Santa Ines, San Miguel, Bulacan Valero St., Makati City Suite 906 Cityland, Herrera RICHWORLD AIRE & Globe Telecom Inc. Three Legged Self Supporting Tower, Purok 6, 14 Tower, 98VA Rufino St. cor. 3/26/2019 TECHNOLOGIES CORP. Brgy. Buliran, San Miguel, Bulacan Valero St., Makati City Suite 906 Cityland, Herrera RICHWORLD AIRE & Globe Telecom Inc. Three Legged Self Supporting Tower, Purok 6, 15 Tower, 98VA Rufino St. cor. 3/26/2019 TECHNOLOGIES CORP. Brgy. Pulong Bayabas, San Miguel, Bulacan Valero St., Makati City PEO-012919-059 – Construction of Elevated Multi-Purpose 127 Malhacan Road, 16 ZACARIAS ENTERPRISE Building with Provision of Stage at BPC Compound, Tawiran, 3/26/2019 Meycauayan City, Bulacan Obando, Bulacan MICHARIAN BUILDERS AND Zone 2, Lugam, City of PEO-020219-106 – Construction of Elevated 2-Storey, 4-CSB at 17 3/26/2019 TRADING Malolos, Bulacan Sta. Rita E/S, Guiguinto, Bulacan J.P. MADRID #90 San Marcos, Calumpit, PEO-022019-109 – Construction of Elevated 2-Storey, 4-CSB at 18 3/26/2019 CONSTRUCTION Bulacan Pulong Gubat E/S, Guiguinto, Bulacan G.M. CAPARAS #30 Zone 3, Kapitangan, PEO-012919-067 – Construction of 2-Storey, 4-CSB at Tiaong E/S, 19 3/26/2019 CONSTRUCTION & SUPPLY Paombong, Bulacan Guiguinto, Bulacan Blk 21, Lot 27, Ph 28, DIAMOND MILLENIUM PEO-012919-060 – Extension/Improvement of Multi-Purpose 20 Mabuhay Homes, Pantok, 3/26/2019 ENTERPRISES Building at M.A. Fernando M/S, San Roque, Angat, Bulacan Binangonan, Rizal V. BERNARDO INFRA-2018-30 – Proposed Modular Partition for the Faculty Office 43 Estacion, San Guillermo, 21 CONSTRUCTION AND at the College of Arts and Letters, Bulacan State University, 3/26/2019 Morong, Rizal TRADING Malolos, Bulacan Page 2 of 55 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 April 2019 Date No. Company Name and Address Project Name Approved 602 A. Mabini St., Road Concreting at Barangay Calawitan-Calasag (NIA Canal), San 22 EDEN CONSTRUCTION Cabanatuan City, Nueva 3/26/2019 Ildefonso, Bulacan Ecija 602 A. Mabini St., Road Concreting at Barangay Bagong Barrio, San Ildefonso, 23 EDEN CONSTRUCTION Cabanatuan City, Nueva 3/26/2019 Bulacan Ecija 602 A. Mabini St., Road Concreting at Barangay Bagong Maasim, San Ildefonso, 24 EDEN CONSTRUCTION Cabanatuan City, Nueva 3/26/2019 Bulacan Ecija 602 A. Mabini St., Road Concreting at Barangay Bagong Alagao, San Ildefonso, 25 EDEN CONSTRUCTION Cabanatuan City, Nueva 3/26/2019 Bulacan Ecija 602 A. Mabini St., Road Concreting at Barangay Bagong San Juan-Makapilapil (NIA 26 EDEN CONSTRUCTION Cabanatuan City, Nueva 3/26/2019 Canal), San Ildefonso, Bulacan Ecija 602 A. Mabini St., 27 EDEN CONSTRUCTION Cabanatuan City, Nueva Road Engravelling at Various Barangays, San Ildefonso, Bulacan 3/26/2019 Ecija 602 A. Mabini St., 28 EDEN CONSTRUCTION Cabanatuan City, Nueva Road Concreting at Barangay Palapala, San Ildefonso, Bulacan 3/26/2019 Ecija BY ADMINISTRATION (VSC Plaza Naning, Poblacion, 29 ALLIANZ REALTY Construction of McDonalds, San Juan, Balagtas, Bulacan 3/26/2019 Baliwag, Bulacan CORPORATION) BY ADMINISTRATION Dolores, Magalang, 30 (RAPHAEL LUIS C. DELA R1 Fuel Station, Dolores, Magalang, Pampanga 3/26/2019 Pampanga FUENTE) BY ADMINISTRATION San Pablo, Magalang, 31 Waste Water Treatment Facility, San Pablo, Magalang, Pampanga 3/26/2019 (NEMESIO R. RADAM) Pampanga 22 Anahaw St., Jackielou Construction of Elevated Water Tank, Brgy. Calulut, City of San 32 CE3 INCORPORATED Ville Subd., BF Homes, 3/26/2019 Fernando, Pampanga Parañaque City Page 3 of 55 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 April 2019 Date No. Company Name and Address Project Name Approved THREE IN ONE City of San Fernando, 18CG0461 – Construction of Three-Storey Six (6) Classroom 33 3/26/2019 CONSTRUCTION & TRADING Pampanga School Building at Dalayap ES, Macabebe, Pampanga THREE IN ONE City of San Fernando, 18-3731 – Construction of Diagnostic Building at Mexico 34 3/26/2019 CONSTRUCTION & TRADING Pampanga Community Hospital, San Carlos, Mexico, Pampanga ALFREDO D. SANTOS 19-0272 – Improvement of Arnedo Park at Capitol Compound, Sto. 35 Sta. Cruz, Lubao, Pampanga 3/26/2019 CONSTRUCTION Niño, City of San Fernando, Pampanga 18-2946 – Improvement & Preparation of CT Scan Room at ALFREDO D. SANTOS 36 Sta. Cruz, Lubao, Pampanga Escolastica Romero District Hospital, Barangay San Nicolas 1st, 3/26/2019 CONSTRUCTION Lubao, Pampanga 3F Bonifacio Technology Center, 31st cor. 2nd Ave., Amaia Scapes Pampanga, Brgy. Sapang Maisac, Mexico, 37 MDC BUILDPLUS, INC. 3/26/2019 Bonifacio Global City, Taguig Pampanga City Suite 906 Cityland, Herrera RICHWORLD AIRE & Globe Telecom Inc. Three Legged Self Supporting Tower, Zone 4, 38 Tower, 98VA Rufino St. cor. 3/26/2019 TECHNOLOGIES CORP. Brgy. Labne, San Miguel, Bulacan Valero St., Makati City Suite 906 Cityland, Herrera RICHWORLD AIRE & Globe Telecom Inc. Three Legged Self Supporting Tower, Zone 4, 39 Tower, 98VA Rufino St. cor. 3/26/2019 TECHNOLOGIES CORP. Sitio Parangayuman, Brgy. Biak na Bato, San Miguel, Bulacan Valero St., Makati City MAYFLOWER Km. 78 McArthur Hiway, Construction of Residential House, Block 1, Lot 1, Greenfields 40 CONSTRUCTION AND Barangay Saguin, City of San 3/27/2019 Subdivision, City of San Fernando, Pampanga DEVELOPMENT Fernando, Pampanga San Gabriel, Sta. Maria, PEO-021219-085 – Construction / Improvement of Multi Purpose 41 PJL BUILDERS 3/27/2019 Bulacan Building at Basuit, San Ildefonso, Bulacan MANUEL A. DELA TORRE JR Sapang Palay Proper, City of PEO-022019-095 – Construction of Slope Protection at San Pedro, 42 3/27/2019 BUILDERS San Jose Del Monte, Bulacan CSJDM, Bulacan 141 Yellow St., Felicisima PEO-012919-054 – Rehabilitation / Improvement of Drainage 43 ASPM CONSTRUCTION Village, Mojon, City of 3/27/2019 System at Sto. Cristo, Baliuag, Bulacan Malolos, Bulacan Page 4 of 55 REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 3 April 2019 Date No. Company Name and Address Project Name Approved 141 Yellow St., Felicisima PEO-012919-044 – Rehabilitation / Improvement of Road at 44 ASPM CONSTRUCTION Village, Mojon, City of 3/27/2019 Bambang, Bocaue, Bulacan Malolos, Bulacan MICHARIAN BUILDERS AND Zone 2, Lugam, City of PEO-012919-064 – Rehabilitation / Improvement of School 45 3/27/2019 TRADING Malolos, Bulacan Compound at Bardias E/S, San Miguel, Bulacan MICHARIAN BUILDERS AND Zone 2, Lugam, City of PEO-012919-065 – Rehabilitation / Improvement of School 46 3/27/2019 TRADING Malolos, Bulacan Compound at Pulong Bayabas E/S, San Miguel, Bulacan MICHARIAN BUILDERS AND Zone 2, Lugam, City of PEO-012919-063 – Construction of School Stage at Masalipit E/S, 47 3/27/2019 TRADING Malolos, Bulacan San Miguel, Bulacan 5i CONSTRUCTION PEO-022019-097 – Rehabilitation / Improvement of Road at San 48 Panghulo, Malabon City 3/27/2019 CORPORATION Pablo, Hagonoy, Bulacan E.C. ANGELES J. Luna St., Sta. Cruz, Lubao, 18-2350 – Concreting of Barangay Road, Bulacus, Masantol, 49 3/27/2019 CONSTRUCTION Pampanga Pampanga Cerville Subd., Sto.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages55 Page
-
File Size-