The $345M Calvary Adelaide Hospital is a state-of-the-art healthcare facility comprising 344 beds, THE RIGHT REMEDY 16 operating theatres, a 24 hour emergency department, rehabilitation wing with hydrotherapy pool and mobility garden, a custom designed Hybrid Theatre. The new hospital offers the most comprehensive CLIENT : Calvary Health Care DEVELOPER : Commercial & General range of services ever delivered by a private healthcare facility in Adelaide including orthopedic, MAIN CONSTRUCTION COMPANY : John Holland cardiac, neurosurgical, and rehabilitation specialties. ARCHITECT : Silver Thomas Hanley STRUCTURAL ENGINEER : Mott MacDonald CONSTRUCTION VALUE : $345 million The new $345 million Calvary Adelaide 6 to 12 have a unitised curtain wall with John Holland are a Tier One infrastructure, Hospital is the largest private hospital in distinctive blue glass. The podium has a property and building company that South Australia and will provide services rectangular footprint with an impressive distinguishes themselves from their previously supplied by Calvary Wakefield 2-storey entrance, a 24 hour emergency competitors by having a vast network and Calvary Rehabilitation hospitals department, 16 operating theatres and of resources that includes the skills and including orthopaedic, cardiac and four procedure rooms. There is also a knowledge of their people, and support is neurosurgical specialities. medical imaging centre and a pathology always available from its highly experienced laboratory as well as new consulting suites, managers and supervisors. Calvary Adelaide Hospital enhances the staff and administration areas. From Level modern patient experience by providing a 6 upwards are patient rooms, the ICU John Holland’s core construction projects ‘hotel’ feeling. There are 344 beds in single and a rehabilitation wing complete with have been within the infrastructure sector patient rooms with ensuite bathrooms and hydrotherapy pool and mobility garden. and they have a string of successfully the interior design shows how far modern completed tunnelling, road and rail projects health care has evolved away from harsh, With a three year build and a site area including the Wentworth to Broken Hill clinical aesthetics. A more comfortable look of 57,000m2 in Adelaide’s CBD, the pipeline, completed in 2018 and the Sydney has been achieved with softer colours and construction process had the potential to Metro Northwest project, finished in 2019. interesting graphics that showcase Adelaide have a huge impact on the area and some Currently the company is continuing work and its surrounds. careful planning was required. on Melbourne’s Metro Tunnel, due for completion at the end of 2025; and stage two John Holland were awarded the D&C “A challenge of the build involved ensuring of Sydney Metro. contract by developer Commercial & General we minimised disruption at the busy city site,” in July 2016 and their inhouse team of five said Joanne. “In Adelaide the residential areas John Holland has always been a builder, worked on the design development with are quite close to the CBD so we ensured that and is known for constructing iconic Silver Thomas Hanley, structural, building materials deliveries and noisy construction structures such as Australian Parliament services and specialist technical consultants. procedures, such as piling, operated within House and the MCG Great Southern permitted times and didn’t exceed acceptable Stand. It has renewed its focus on its “Involvement in the early stages of design noise levels.” building business, which is completing allowed John Holland to achieve the best large scale developments such as the outcome for our customer, and for future “The site has a number of schools nearby Royal Hobart Hospital redevelopment, patients,” said Project Manager, Joanne Potts. and is bounded by a road with major bus and Victorian Heart Hospital. The team “We were able to deal with structural and routes so the timing of materials and recently completed the award-winning $50 design issues before the design was finalised equipment deliveries was critical in order million library and plaza complex at Green when changes were still possible.” to keep the work progressing and maintain Square in Sydney, and the iconic Mercedez- safety both onsite and for local businesses Benz lifestyle precinct in Brisbane. The structure is a standard in situ concrete and the general public. We also had to be frame with a 3-level basement car park. aware of impacting on the essential services The 5-level podium is clad with cream near the site – the police and the fire For more information contact John Holland, coloured precast concrete panels and Levels brigade,” said Joanne. website www.johnholland.com.au 164 SA PROJECT FEATURE CALVARY ADELAIDE HOSPITAL WWW.ANCR.COM.AU SA PROJECT FEATURE CALVARY ADELAIDE HOSPITAL 165 Below Atelier JV took on the role as Façade Engineers to develop the architectural design of the façade of Calvary Adelaide Hospital. Atelier JV specialise in structural and and CAD technicians. Based in Perth, façade engineering designs for complex they work across Western Australia and in architectural projects. As part of the team South Australia over a range of sectors such on Calvary Adelaide Hospital, Atelier JV as; commercial developments, mixed use and were engaged by John Holland to provide residential complexes, industrial, education Façade Engineering services to develop the and health facilities as well as entertainment architectural design of the façade to a level and retail. Atelier JV also provided engineering that could be tendered on and shop drawn design services for beautiful ‘see-through’ by their façade subcontractor. Atelier JV jagged metal sculptures of surfers at Perth continued in the role of Façade Engineer and Bondi Sculpture by the Sea for artist through the construction process in order to April Pine. assist John Holland in maintaining the quality of the façade construction. The company’s façade engineering services include schematic design through to The first 5-levels of the hospital have construction services. Their experience with punch windows in precast panels with façades covers all aspects of façade structural a challenging overlapping arrangement. design in all materials and systems. Level-6 and upwards has high performance unitised façade panels. Atelier JV has an impressive portfolio of award-winning and significant buildings that Atelier JV designed and specified the façade have contributed to the development of then worked with the façade subcontractor, both Perth and Adelaide. They are currently Synergy Facades (now Sky Facades) as they engaged for Façade Engineering on the developed it to their system. “It’s the first second South Australian Health and Medical time we’ve worked with Synergy Facades and Research Institute (SAHMRI) in Adelaide. it was a successful collaboration,” said Project SAHMRI II is a $320 million project, a high Engineer, Dan Buckley. They also carried out tech glass building sited next to SAHMRI I value engineering with thermal modelling in and Royal Adelaide Hospital. order to optimise the façade performance and glass selection for the building. In Perth, the new WA Museum is taking shape The final selections culminating in the and the recently completed Forrest Chase are construction, by Synergy Facades of a among the many projects that Atelier JV have 2-storey visual mockup prototype of the been proud to be a part of. façade for the client and consultants to view at their factory in Foshan, China. “Atelier JV congratulates John Holland and Synergy Facades for a successful project in “For the double level atrium entry to the Calvary Adelaide Hospital and is looking Hospital, we engineered a structurally glazed forward to more exciting projects in full height façade and designed slim 8m Adelaide,” said Simon. tall mullions. The mullions were designed to be as elegant as possible by the addition For more information contact Atelier JV, of significant internal stiffening. Synergy 123 Aberdeen Street, Northbridge WA 6003, Facades developed this concept to adapt it to phone 08 9228 9120, email info@atelierjv. their preferred section profiles. The atrium com.au, website www.atelierjv.com.au was one of the last pieces of façade to be completed and it now looks really good, it is a feature of the entryway for the Hospital.” There were four visits to China for quality assurance inspections to ensure the end result was a high grade product. “We visited the aluminium, glass and fabrication assembly factories to ensure the quality and appearance of the product was consistent,” said Director, Simon Jewell. “This is an important part of the process of ensuring a quality product.” Established in 2012, Atelier JV employs a team of 10 including engineers, designers 166 SA PROJECT FEATURE CALVARY ADELAIDE HOSPITAL AUSTRALIAN NATIONAL CONSTRUCTION REVIEW WWW.ANCR.COM.AU SA PROJECT FEATURE CALVARY ADELAIDE HOSPITAL 167 Below ARA Manufacture supplied and installed Below Armstrong Flooring Australia produced all the fire doors and supplied acoustic doors, 40,000m2 of flooring and wall vinyl in a variety solid and foam cores, and also lead lined doors. of colours for Calvary Adelaide Hospital. ARA Manufacture specialise in the fabrication, supply and window solutions and Ravco, the continuous hinge for all high Armstrong Flooring Australia is an expert in the manufacture 110 in their manufacturing plant and warehouse based in Braeside, installation of solid, fire and veneer doors
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-