Independent Verification of Rap3 Disbursement Linked Indicators (Dli): Local Roads Netwok - 2018 Round 1

Independent Verification of Rap3 Disbursement Linked Indicators (Dli): Local Roads Netwok - 2018 Round 1

DFID Nepal Rural Access Programme 3 (RAP3) Monitoring, Evaluation and Learning (MEL) Component INDEPENDENT VERIFICATION OF RAP3 DISBURSEMENT LINKED INDICATORS (DLI): LOCAL ROADS NETWOK - 2018 ROUND 1 Date: May 2018 Submitted by Itad Itad [year] Contents Abbreviations ........................................................................................................................................ iii Executive Summary .............................................................................................................................. iv 1. Introduction ................................................................................................................................ 1 1.1 What RAP does ................................................................................................................................... 1 1.2 Disbursement Linked Indicators ...................................................................................................... 2 1.3 Verification by MEL ........................................................................................................................... 2 1.4 Objectives of the assignment .......................................................................................................... 3 2. Methodology and Sampling Framework .................................................................................. 4 2.1 Verification Team .............................................................................................................................. 4 2.2 Methodology of Local Roads Network (LRN) Verification ............................................................ 4 2.2.1 New construction........................................................................................................................... 4 2.2.2 Maintenance .................................................................................................................................. 6 2.4 Sampling ........................................................................................................................................... 6 2.5 Limitations ........................................................................................................................................ 7 3. Verification Findings .................................................................................................................. 8 3.1 LRN progress verification: New construction .......................................................................... 8 3.2 LRN progress verification: Maintenance .................................................................................. 9 3.3 Qualitative observation from the field verification ................................................................. 11 4. Conclusion ................................................................................................................................. 12 5. Annexes ..................................................................................................................................... 13 Annex 1: LRN progress verification in sampled districts ..................................................................... 13 Annex 2: LRN progress verification in sampled districts ................................................................... 16 ii Abbreviations DDC District Development Committee DFID UK Department for International Development DLI Disbursement Linked Indicator (used for the Payment by Results mechanism) DPM RAP3 Deputy Programme Manager DRCN District Road Core Network DTL District Team Leader IoE Institute of Engineering (Tribhuvan University, Nepal) Km Kilometre LF Logframe LFI Logframe Indicator LNGO Local Non-Governmental Organisation GoN Government of Nepal LRN Local Roads Network M Metre MEL Monitoring, Evaluation and Learning Component of RAP3 PBR Payment by Results PM Programme Manager (of RAP3) PMV System Performance Management and Verification System of RAP3 RAP3 Rural Access Programme 3 RBG Road Building Group RMG Road Maintenance Group SBG Special Building Group SC Supervision Consultant (sub-contracted by RAP3) iii Executive Summary This report presents findings from the first round of verification in 2018 of RAP reported results. The verification exercise was undertaken by RAP’s independent MEL component. It was conducted between March and April of 2018. As the previous round of verification in 2017 focused exclusively on the Disbursement Linked Indicator (DLI) for employment days, this round of verification focused on the one DLI that relates to RAP’s reported results for road works. This DLI for road works has two sub-indicators for new construction and maintenance road works respectively. The verification focused on LRN road length under construction in the district of Mugu, and LRN road length under maintenance in the districts of Achham, Doti and Jumla. Greater emphasis was placed on the maintenance work for this round due to the transition of handing over maintenance work from RAP to the Government of Nepal. Verification of new road construction work in Mugu was checked against the reported progress up to the end of February 2018. The verification found that for new road construction progress, the results reported by RAP are accurate based on the 51 road cross-section samples from 17 RBGs assessed by the verification team. Verification of road length under maintenance was assessed in 3 districts of Accham, Doti and Mugu and was checked against the reported progress for the end of February 2018. A total of 30 Road Maintenance Groups (RMGs) were sampled and the monthly work activities undertaken by these RMGS in February 2018 was physically verified. The verification team also found that for the maintenance progress the work was completed accurately by RMGs and there were no inconsistencies found. All assessments of work in the field (including photographic evidence) and the verification assignment itself can be found at the following link: https://drive.google.com/open?id=1dl2EnZMZMfh5l9D3xgWQ7zmkwrFW5inz. The MEL team strongly encourages readers to access the online folder to gauge the progress of RAP works for themselves. iv 1. Introduction 1.1 What RAP does The objective of the Rural Access Programme 3 (RAP) is to reduce poverty in western Nepal. The programme aims to deliver economic benefits to the poor through improved rural road access and connectivity utilising a pro-poor targeted labour based approach to road works. The primary output of RAP is the construction and maintenance of rural roads within the District Road Core Network (DRCN) which makes up a strategic part of Nepal’s Local Roads Network (LRN) in eight core districts of the Mid and Far West region. Poor and vulnerable individuals are targeted to become part of Road Building Groups (RBGs) and Road Maintenance Groups (RMGs) who are paid to construct and maintain rural roads. At the end of 2017, Nepal became a Federal Republic with autonomous provincial and local governments, replacing the district level government administrative structures that existed previously. Whilst the country transitions to fully and practically implementing the Federal administrative structures, the DRCN remains an important strategic network of rural roads. RAP is constructing 97.5km of new roads in four core build (or new construction) districts: Bajura, Humla, Kalikot and Mugu. Bajura is part of Province No.7 whilst Humla, Kalikot and Mugu are part of Province No.6 (also referred to as Karnali Pradesh) in Federal Nepal. RAP is maintaining existing rural roads in the DRCN of four core maintenance districts: Achham, Dailekh, Doti and Jumla.1 Dailekh and Jumla are part of Province No.6 (or Karnali Pradesh) whilst Achham and Doti are part of Province No.7 in Federal Nepal. This report acknowledges the significant political changes that are underway, but for the purposes of verification of results in the areas that RAP operates in, it refers to this areas using the district names. The construction of RAP roads is based on three broad stages: 1) track opening to 2.5m, 2) track widening to 3.5m, and 3) track widening to 4.5m with structures (this includes supporting structures such as gabion walls, cross drainage, etc.). Construction is completed in sections along the entirety of a planned road corridor. There are a number of different maintenance categories that RAP carries out depending on the condition of the roads (e.g. specific, emergency, recurrent, routine, etc.). The majority of activities is centred around routine and recurrent maintenance performed by RMGs along the length of roads assigned to these groups. This work generally consists of light tasks that can be easily performed by RMG members, who are recruited from the local community. Such tasks can include filling potholes, clearing rocks off the road path created by small landslides and cutting overgrown vegetation that can block side drains by the road. The amount of work required for routine and recurrent maintenance is assessed monthly, and the work assigned accordingly. 1 RAP has maintained approximately 2,100km of rural roads in the DRCN across 10 districts in Nepal, of which 4 are within the core maintenance districts in the Mid and Far West. RAP plans to maintain up to 2,250km by 2019. The verification is concerned only with the 4 core districts and not the remaining 6 pilot districts. 1 1.2 Disbursement Linked Indicators The UK Department for International Development (DFID) funds RAP. Funding to the implementing organisation,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us