Al-Rajef 82 Mw Wind Power Project Environmental and Social Impact

Al-Rajef 82 Mw Wind Power Project Environmental and Social Impact

AL-RAJEF 82 MW WIND POWER PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) 23 April 2016 REV - 3 Al-Rajef Wind Power Project – Final ESIA Document title Al-Rajef 82 MW Wind Power Environmental and Social Impact Assessment Status REV- 3 Date 23 April 2016 Client Green Watts Renewable Energy (GWRE) Co. L.L.C REVISION RECORD Rev. Created By Internal Review By Date Submission Reviewed Date No. Status By Rev 0 ECO Consult ECO Consult 13 July 2015 Draft GWRE 15 July 2015 Rev 1 ECO Consult ECO Consult 6 Oct 2015 Draft Rev 2 ECO Consult ECO Consult 9 Nov 2015 Final Rev 3 ECO Consult ECO Consult 23 Apr 2016 Final PAGE | II Al-Rajef Wind Power Project – Final ESIA CONTACTS ECO Consult Physical Address: ECO Consult Jude Centre, 4th floor, Building #1 Salem Hindawi Street Shmeisani Amman Jordan Mailing Address: ECO Consult PO Box 941400 Amman 11194 Jordan Tel: +962 6 569 9769 Fax: + 962 6 569 7264 Email: [email protected] Contact Persons: Ra’ed Daoud Managing Director - ECO Consult E: [email protected] Lana Zu’bi Project Manager – ECO Consult E: lana.zu'[email protected] Ibrahim Masri Project Coordinator – ECO Consult E: [email protected] PAGE | III Al-Rajef Wind Power Project – Final ESIA TABLE OF CONTENTS Table of Contents ............................................................................................................................................. iv List of Figures .................................................................................................................................................. viii List of Tables ...................................................................................................................................................... x Abbreviations ................................................................................................................................................... xii Executive Summary in Arabic .......................................................................................................................... xiv Executive Summary ........................................................................................................................................ xxx 1. Introduction .............................................................................................................................................. 1 1.1 Project Background ........................................................................................................................... 1 1.2 Project Location and Setting ............................................................................................................. 1 1.3 The Environmental and Social Impact Assessment (ESIA) Report .................................................... 2 1.4 Document Structure .......................................................................................................................... 3 1.5 Project Proponent and Key Contributors .......................................................................................... 4 2. Project History And Alternatives ............................................................................................................... 6 2.1 Project History ................................................................................................................................... 6 2.2 Site Selection Alternatives ................................................................................................................ 8 2.3 Design Alternatives ......................................................................................................................... 10 2.4 Technology Alternatives .................................................................................................................. 12 2.5 No Project Alternative ..................................................................................................................... 13 3. Project Description .................................................................................................................................. 14 3.1 Administrative Setup of Project Location ....................................................................................... 14 3.2 Project Location .............................................................................................................................. 14 3.3 Outline of Wind Turbine Technology .............................................................................................. 16 3.4 Project Components ........................................................................................................................ 16 3.5 Footprint of the Project Components ............................................................................................. 21 3.6 Land Take Requirements and Land Use Context ............................................................................ 22 3.7 Overview of Project Phases ............................................................................................................. 22 3.8 Workforce and Training .................................................................................................................. 24 3.9 Resource Use Efficiency .................................................................................................................. 25 4. Regulatory and Policy Framework .......................................................................................................... 26 4.1 Jordanian Environmental Clearance Process .................................................................................. 26 4.2 Summary of Jordanian and Environmental and Social Regulatory Context ................................... 28 4.3 Jordanian Institutional Set-up ......................................................................................................... 30 PAGE | IV Al-Rajef Wind Power Project – Final ESIA 4.4 International Agreements ............................................................................................................... 31 4.5 Requirements for Project Financing ................................................................................................ 33 5. ESIA Approach and Methodology ........................................................................................................... 36 5.1 Screening, Scoping & Assessment ................................................................................................... 36 5.2 Analysis of Alternatives ................................................................................................................... 36 5.3 Stakeholder Engagement ................................................................................................................ 37 5.4 Delineation of Study Boundaries and Scope of Assessment ........................................................... 37 5.5 Environment & Social Baseline Conditions ..................................................................................... 39 5.6 Impact Assessment Methodology ................................................................................................... 40 5.7 Assessment of Cumulative Impacts ................................................................................................ 43 5.8 Development of an Environmental and Social Management (ESMP) Plan ..................................... 43 6. Stakeholder Consultation and Engagement ............................................................................................ 44 6.1 Introduction .................................................................................................................................... 44 6.2 Objectives ........................................................................................................................................ 44 6.3 Requirements and Policy Requirements for Stakeholder Engagement .......................................... 44 6.4 Stakeholder Identification and Analysis .......................................................................................... 46 6.5 Stakeholder Consultation and Engagement To-Date ...................................................................... 49 6.6 Future Stakeholder Engagement and Consultation ........................................................................ 59 7. Overview of Strategic Environmental and Economical Impacts ............................................................. 60 7.1 Master Strategy of Energy Sector in Jordan .................................................................................... 60 7.2 Energy Security ................................................................................................................................ 61 7.3 Economic Benefits ........................................................................................................................... 61 7.4 Environmental Benefits ................................................................................................................... 62 8. Landscape and Visual .............................................................................................................................. 63 8.1 Assessment of Baseline Conditions ................................................................................................. 63 8.2 Assessment of Potential Impacts .................................................................................................... 66 9. Land Use .................................................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    292 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us