Athabasca Oil Sands Project

Athabasca Oil Sands Project

PROJECT PROFILE One Company, One Call, Countless Solutions. ► Athabasca Oil Sands Project Client: Shell Canada Limited, Chevron Canada Resources, Western Oil Sands Location: Fort Saskatchewan, Alberta (Scotford Upgrader) and Fort McMurray, Alberta (Muskeg River Mine) ► AMECO Project Quick Facts Project Duration: 24 months Scope of Services: General construction equipment supply and maintenance, tools, supplies, consumables, safety supplies, construction site services management, and scaffolding Peak Workforce: 4,000-plus Total Craft Hours: 34.5 million (Scotford Upgrader: 23 million; Muskeg River Mine: 11.5 million) The Athabasca Oil Sands Downstream Project (AOSP) is a joint venture by owners Shell Canada Limited (60 percent), Chevron Canada Resources (20 percent) and Western Oil Sands (20 percent).The AOSP project comprises the Muskeg River Mine and the Scotford Upgrader. The facilities will produce 155,000 barrels of synthetic crude oil per day. Construction began in late 1999, and production started in December 2002. Because the AOSP was located 30 kilometres east of Edmonton, the closest supply source was one hour away. Although the weather was not severe in the summer, the winter weather Delivering Integrated conditions could range from 32°F to 40°F, which made start-up and daily Mobile Equipment and operation challenging at times. Tool Solutions to Industry Worldwide. AMECO supplied fully maintained construction equipment and vehicles, tools, consumables, safety supplies, and scaffolding to both the Muskeg River Mine and Scotford Upgrader locations. AMECO supplied fully-maintained construction equipment, including maintenance parts, supplies and labor, transportation, Contact and insurance as well as small tools, tools, consumables, safety supplies, and www.ameco.com scaffolding to the Scotford Upgrader. AMECO supplied construction equipment [email protected] with insurance as well as small tools, supplies, consumables, and safety items on the Muskeg River Mine. By project’s end, AMECO had supplied, managed, and maintained more than © 2016 American Equipment Company, Inc. 3,400 pieces of construction equipment, including 158 cranes ranging from All Rights Reserved. AMECO is a registered service mark of American Equipment Company, Inc. GV20160265-001.indd PROJECT PROFILE One Company, One Call, Countless Solutions. 8 to 400 tons for five primary contractors including Fluor, Bantrel, Colt, Parsons, VECO, as well as multiple subcontractors. AMECO’s Value to Shell: • Realized $8 million in cost savings. • Delivered proper tools and equipment one week faster than other suppliers. • Implemented severe weather operating procedures, including an early morning equipment start-up program. • No recordables or lost-time accidents. Delivering Integrated Mobile Equipment and Tool Solutions to Industry Worldwide. Contact www.ameco.com [email protected] © 2016 American Equipment Company, Inc. All Rights Reserved. AMECO is a registered service mark of American Equipment Company, Inc. GV20160265-001.indd.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us