EXISTING CONDITIONS Section 02 41 00 – Demolition and Salvage 8

EXISTING CONDITIONS Section 02 41 00 – Demolition and Salvage 8

UNIVERSITY OF TORONTO TABLE OF CONTENTS PREFABRICATED ROOFTOP UNIT TECHNICAL SPECIFICATIONS MORRISON HERSHFIELD: 1170118.00 PAGE 1 OF 3 The Specifications and Drawings listed in the following Table of Contents have been prepared for the exclusive use of the University of Toronto, for use during the Prefabricated Rooftop Unit project at 10 Kings’s College Road, Toronto, Ontario, and may not be reproduced in whole or in part without the express written consent of the University of Toronto and Morrison Hershfield Limited, and may not be applied to other buildings, or other portions of this building, where the specified work may be inappropriate. DIVISION 00 and 01 – Refer to University of Toronto documents DIVISION 02 — EXISTING CONDITIONS Section 02 41 00 – Demolition and Salvage 8 DIVISION 05 — METALS Section 05 51 01 – Ballasted Metal Stairs 3 DIVISION 06 — WOOD, PLASTICS AND COMPOSITES Section 06 10 00 – Rough Carpentry 4 DIVISION 07 — THERMAL AND MOISTURE PROTECTION Section 07 52 16 – Modified Bitumen Membrane Roofing 14 Section 07 92 00 – Joint Sealant 8 DIVISION 08 — DOORS AND WINDOWS Section 08 44 00 – Window Wall 1516 DIVISION 15 — SPECIAL Section 15 10 00 – Factory Built Fabricated Roof Top Unit 7 DIVISION 20 — MECHANICAL Section 20 01 01 – Mechanical General Requirements 17 Section 20 05 13 – Motors, Starters, Wiring and Electric Pipe Heating 27 Section 20 05 16 – Flax Connections, Expansion J oints, Anchors and Guides 6 Section 20 05 19 - Meters and Gauges 6 Section 20 05 23 – Valves 11 Section 20 05 29 – Hangers and Supports 8 Section 20 05 48 – Vibration Isolation 7 Section 20 05 53 – Identification 5 Section 20 07 13 – Mechanical Insulation 26 Section 20 08 01 – Start-up and Performance Testing Reporting 7 Section 20 08 05 - Testing Adjusting and Balancing 8 Section 20 08 06 – Acoustic Testing 2 DIVISION 22 — PLUMBING Section 22 05 01 – Plumbing General 3 Section 22 05 23 – Plumbing Specialties and Accessories 5 PREFABRICATED ROOFTOP UNIT UNIVERSITY PROJECT NUMBER: P009-16-140 10 KING’S COLLEGE ROAD, TORONTO DATE ISSUED: SEPTEMBER 29, 2017 UNIVERSITY OF TORONTO TABLE OF CONTENTS PREFABRICATED ROOFTOP UNIT TECHNICAL SPECIFICATIONS MORRISON HERSHFIELD: 1170118.00 PAGE 2 OF 3 Section 22 11 19 – Pex Tube and Fitting 3 Section 22 13 16 – Drainage and Vent Piping Cast Iron and Copper 3 Section 23 05 01 – Piping Systems General 3 Section 23 21 23 – Pumps Heating and Cooling 2 DIVISION 23 — HEATING, VENTILATION AND AIR CONDITIONING Section 23 25 13 – HVAC Water Treatment Systems 4 Section 23 31 01 – Air Distribution 1 Section 23 31 13 – Ductwork 3 Section 23 33 05 – Duct Accessories 3 Section 23 33 13 – Dampers Balancing 2 Section 23 33 14 – Dampers Operating 3 Section 23 33 63 – Louvres 2 Section 23 34 05 – Fans 4 Section 23 37 13 – Grilles Registers and Diffusers 2 Section 23 52 12 - Packaged Boiler Electric 3 Section 23 82 23 – Fan Coil Units 3 DIVISION 25 — INTEGRATED AUTOMATION Section 25 05 01 – BAS General 12 Section 25 11 01 – BAS Network Devices 12 Section 25 14 01 – BAS Equipment Controllers 9 Section 25 90 01 – BAS Sequence of Operations 1 DIVISION 26 — ELECTRICAL Section 26 05 00 – Electrical General Requiremetns 9 Section 26 05 21 – Wires and Cables 0 – 100V 5 Section 26 05 26 - Grounding and Bonding 3 Section 26 05 29 – Hangers and Supports 4 Section 26 05 31 – Junction Boxes 2 Section 26 05 34 – Conduits 5 Section 26 08 00 – Electrical Testing 15 Section 26 24 16 – Panelboard 4 Section 26 27 26 – Wiring Devices 3 Section 26 28 23 – Unfused Disconnect Switches 2 Section 26 50 00 – Lighting Equipment 4 DIVISION 28 — ELECTRONIC SAFETY AND SECURITY Section 28 31 00 – Fire Alarm Systems 7 APPENDIX A mottLAB – Expanded Rapidship Program for University of Toronto SIF Projects 27 PREFABRICATED ROOFTOP UNIT UNIVERSITY PROJECT NUMBER: P009-16-140 10 KING’S COLLEGE ROAD, TORONTO DATE ISSUED: SEPTEMBER 29, 2017 UNIVERSITY OF TORONTO TABLE OF CONTENTS PREFABRICATED ROOFTOP UNIT TECHNICAL SPECIFICATIONS MORRISON HERSHFIELD: 1170118.00 PAGE 3 OF 3 CONRACT DRAWINGS As listed on Drawing A-000 END OF SECTION PREFABRICATED ROOFTOP UNIT UNIVERSITY PROJECT NUMBER: P009-16-140 10 KING’S COLLEGE ROAD, TORONTO DATE ISSUED: SEPTEMBER 29, 2017 University of Toronto 02 41 00 Prefabricated Rooftop Unit DEMOLITION AND SALVAGE September 29, 2017 – Issued for Tender Page 1 PART 1 - GENERAL 1.1. SUMMARY 1.1.1. Section Includes: Provide demolition and salvage including but not limited to following: 1.1.1.1. selective demolition to accommodate alterations. 1.1.1.2. new openings. 1.1.1.3. Obtain all necessary permits and pay all fees related to demolition, disposal of materials, disconnecting existing services, and other aspects of the Work. 1.1.2. Related Sections: Following description of work is included for reference only and shall not be presumed complete: 1.1.2.1. Section 07 52 16 Modified Bituminous roofing. 1.1.2.2. Demolition and removal of mechanical equipment services designated for removal on Drawings and as required by Work. Disconnecting and capping prior to authorizing removal: Division 21, Fire Suppression, Division 22, Plumbing and Division 23 Heating, Ventilating and Air Conditioning. 1.1.2.3. Demolition and removal of electrical equipment services designated for removal on Drawings and as required by Work. Disconnecting and capping prior to authorizing removal: Division 26, Electrical, Division 27, Communications and Division 28, Electronic Safety and Security. 1.2. REFERENCES 1.2.1. Definitions: 1.2.1.1. Hand Demolition: Systematic demolition of structures by workers using hand-held tools. 1.2.1.2. Hazardous Materials: dangerous substances, dangerous goods, hazardous commodities and hazardous products, may include but not limited to: poisons, corrosive agents, flammable substances, ammunition, explosives, radioactive substances, or other material that can endanger human health or well being or environment if handled improperly. 1.2.1.3. Mechanical Demolition: Systematic demolition of structures using powered equipment. 1.2.1.4. Systematic Demolition: Methodical dismantling of structure piece by piece, usually carried out in reverse order of construction. 1.2.2. Reference Standards: 1.2.2.1. CSA S350-M80(03) - Code of Practice for Safety in Demolition of Structures 1.2.2.2. OPSS 1001-05 - Material Specifications for Aggregates - General 1.2.2.3. OPSS 1010-04 - Material Specification for Aggregates – Base, Subbase, Select Subgrade, and Backfill Material Kasian Architecture Ontario Incorporated Project No. P009-16-140 University of Toronto 02 41 00 Prefabricated Rooftop Unit DEMOLITION AND SALVAGE September 29, 2017 – Issued for Tender Page 2 1.2.2.4. Ontario Regulation 278/05 Designated Substance — Asbestos on Construction Projects and in Buildings and Repair Operations. 1.2.2.5. Gasoline Handling Act, 1980 1.3. ADMINISTRATIVE REQUIREMENTS 1.3.1. Pre-Demolition Meeting: 1.3.1.1. Prior to start of work, arrange for site meeting of all parties associated with work of this Section. Presided over by Consultant, meeting shall include Contractor, demolition Subcontractor, testing company's representative and structural engineer. 1.3.1.2. Review Specification for work included under this Section and determine complete understanding of requirements and responsibilities relative to work included, storage and handling of materials, inspection of construction to be demolished, methods to be used, sequence and quality control, Project staffing, restrictions due to environmental protection requirements and other matters affecting demolition, to permit compliance with intent of this Section. Review structural load limitations of existing structures. Review and finalize building demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays. Review and finalize protection requirements. 1.3.2. Scheduling: 1.3.2.1. Where practicable, remove or neutralize hazardous or toxic materials identified in Environmental Report before demolition begins. 1.3.2.2. Demolition and removal of mechanical and electrical equipment and services designated for removal on Drawings and as required by Work. Disconnecting and capping prior to authorizing removal: Division 26. 1.4. SUBMITTALS 1.4.1. Plan of Action: 1.4.1.1. Submit in accordance with Section 01 30 00. 1.4.1.2. Submit "Plan of Action" immediately after award of Contract for review by Consultant. 1.4.1.3. Submit demolition, cutting, patching and finishing schedule showing timing and sequencing of the work in the various areas of the existing building. Deviation from schedule will not be permitted without approval. 1.4.1.4. Complete demolition as indicated on Drawings and as otherwise required to accommodate new construction. 1.5. SITE CONDITIONS 1.5.1. Ambient Conditions: 1.5.1.1. Demolition performed on this Project in areas which may be partially occupied. Take care and provisions for protection of workers on site and occupants during progress of work. Kasian Architecture Ontario Incorporated Project No. P009-16-140 University of Toronto 02 41 00 Prefabricated Rooftop Unit DEMOLITION AND SALVAGE September 29, 2017 – Issued for Tender Page 3 1.5.1.2. Do not close or obstruct roads, streets, sidewalks, passageways without permits. Do not place or store materials in streets or passageways. Conduct operations with minimum interference with roads, streets, driveways and passageways. PART 2 - PRODUCTS 2.1. MATERIALS 2.1.1. Regulatory Requirements: 2.1.1.1. Conform to The Occupational Health and Safety Act and Regulation for Construction Projects 2.1.1.2. Conform to OBC, especially Division C, Part 1, Article 1.2.2.3 as applicable. 2.1.1.3. Conform to Fire Code, Regulation under Fire Marshal Act especially Part 8. 2.1.1.4. Conform to requirements of Section 01 50 00 in particular, Article on engineering requirements for Temporary Construction. 2.1.2.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    365 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us