Southwest Connecticut Reliability Project

Southwest Connecticut Reliability Project

SOUTHWEST CONNECTICUT RELIABILITY PROJECT BY THE CONNECTICUT LIGHT AND POWER COMPANY DOING BUSINESS AS EVERSOURCE ENERGY VOLUME 4: PLANNING JUNE 2016 Connecticut Siting Council – Application SWCT Reliability Project Note: This page is intentionally left blank Connecticut Siting Council – Application SWCT Reliability Project INDEX VOLUME 4: PLANNING EX 1: ISO-NE, “Southwest Connecticut Area Transmission 2022 Needs Assessment,” June 2014, Redacted to secure Confidential Energy Infrastructure Information (CEII) EX 2: ISO-NE, “Southwest Connecticut Area Transmission 2022 Solutions Study Report,” February 2015, Redacted to secure Confidential Energy Infrastructure Information (CEII) EX 3: ISO-NE “Transmission Planning Technical Guide,” March 2, 2016 EX 4: London Economics “Analysis of the Feasibility and Practicality of Non-Transmission Alternatives (NTAs),” March 2015 Connecticut Siting Council – Application SWCT Reliability Project Note: This page is intentionally left blank Connecticut Siting Council – Application SWCT Reliability Project EXHIBIT 1: ISO-NE, “SOUTHWEST CONNECTICUT AREA TRANSMISSION 2022 NEEDS ASSESSMENT,” JUNE 2014, REDACTED TO SECURE CONFIDENTIAL ENERGY INFRASTRUCTURE INFORMATION (CEII) Connecticut Siting Council – Application SWCT Reliability Project Note: This page is intentionally left blank Connecticut Siting Council – Application SWCT Reliability Project Southwest Connecticut Area Transmission 2022 Needs Assessment REDACTED —PUBLIC VERSION © ISO New England Inc. June 2014 Table of Contents Section 1 Executive Summary ...................................................................................... 8 1.1 Study Objective ....................................................................................................................................... 8 1.2 Method and Criteria ................................................................................................................................. 8 1.3 Study Assumptions .................................................................................................................................. 9 1.4 Specific Areas of Concern ..................................................................................................................... 10 1.4.1 Frost Bridge – Naugatuck Valley Subarea Thermal and Voltage Needs ..................................... 10 1.4.2 Housatonic Valley / Norwalk – Plumree Subarea Thermal and Voltage Needs .......................... 11 1.4.3 Bridgeport Subarea Thermal and Voltage Needs ........................................................................ 11 1.4.4 New Haven - Southington Subarea Thermal and Voltage Needs ................................................ 12 1.4.5 Glenbrook – Stamford Subarea Thermal and Voltage Needs ...................................................... 12 1.4.6 Short Circuit Test Results ............................................................................................................ 12 1.4.7 Results of Generation Re-Dispatch Analysis ............................................................................... 13 1.5 Statements of Need ................................................................................................................................ 13 1.6 NERC Compliance Statement ............................................................................................................... 14 Section 2 Introduction and Background Information ............................................... 15 2.1 Study Objective ..................................................................................................................................... 15 2.2 Areas Studied ........................................................................................................................................ 15 2.3 Study Horizon ........................................................................................................................................ 18 2.4 Analysis Description ............................................................................................................................. 18 Section 3 Study Assumptions .................................................................................... 20 3.1 Steady State Model Assumptions .......................................................................................................... 20 3.1.1 Study Assumptions ...................................................................................................................... 20 3.1.2 Source of Power Flow Models ..................................................................................................... 20 3.1.3 Transmission Topology Changes ................................................................................................. 20 3.1.4 Generation Additions & Retirements ........................................................................................... 21 3.1.5 Explanation of Future Changes Not Included .............................................................................. 22 3.1.6 Forecasted Load ........................................................................................................................... 23 3.1.7 Load Levels Studied .................................................................................................................... 25 3.1.8 Load Power Factor Assumptions ................................................................................................. 26 3.1.9 Transfer Levels ............................................................................................................................ 26 3.1.10 Generation Dispatch Scenarios .................................................................................................. 27 3.1.11 Reactive Dispatch Assumptions ................................................................................................ 29 3.1.12 Demand Resources ..................................................................................................................... 30 3.1.13 Protection and Control System Devices Included in the Study Area ......................................... 30 3.1.14 Explanation of Operating Procedures and Other Modeling Assumptions ................................. 32 3.2 Stability Modeling Assumptions ........................................................................................................... 33 3.3 Short Circuit Model ............................................................................................................................... 33 3.3.1 Study Assumptions ...................................................................................................................... 33 Southwest Connecticut Area Transmission 2022 – Needs Assessment Report ISO New England Inc. ii 3.3.2 Short Circuit Model ..................................................................................................................... 33 3.3.3 Generation Additions & Retirements ........................................................................................... 33 3.3.4 Generation and Transmission System Configurations ................................................................. 34 3.3.5 Boundaries ................................................................................................................................... 34 3.3.6 Other Relevant Modeling Assumptions ....................................................................................... 34 3.3.7 Other System Studies ................................................................................................................... 34 Section 4 Analysis Methodology ................................................................................ 35 4.1 Planning Standards and Criteria ............................................................................................................ 35 4.2 Performance Criteria ............................................................................................................................. 35 4.2.1 Steady-state Criteria ..................................................................................................................... 35 4.2.1.1 Thermal and Voltage Limits .................................................................................................. 35 4.2.1.2 Solution Parameters ............................................................................................................... 36 4.2.2 Stability Performance Criteria ..................................................................................................... 36 4.2.3 Short Circuit Performance Criteria .............................................................................................. 37 4.3 System Testing ...................................................................................................................................... 37 4.3.1 System Conditions Tested ............................................................................................................ 37 4.3.2 Steady-State Contingencies / Faults Tested ................................................................................. 37 4.3.3 Generation Re-Dispatch Testing .................................................................................................. 39 4.3.4 Critical Load Level (CLL) Analysis ............................................................................................ 39 4.3.5 Stability Contingencies / Faults Tested

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    346 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us