Pre-Feasibility Report

Pre-Feasibility Report

PRE-FEASIBILITY REPORT “Proposed Expansion of Sugarcane Crushing Capacity from 9000 TCD to 15000 TCD, Distillery Capacity from 60 KLPD to 90 KLPD and Establishing 21MW Co-generation Power Plant based on Bagasse and 5 MW from incineration boiler” At Dattanagar, Tal. Shirol, Dist. Kolhapur in Maharashtra State, by M/s. Shree Datta Shetkari Sahakari Sakhar Karkhana Limited. Report Prepared By: DR. SUBBARAO’S ENVIRONMENT CENTER ‘Arundhati’, Opp. Sahyognagar, MSEB Road, Vishrambag, Sangli-416415 Phone: 0233-2301857, (M) 9372109522, 9890992118 QCI-NABET Accredited EIA Consultant Organization Certificate No. NABET/EIA/1619/RA0057 NABL Quality Assurance Laboratory Accreditation Certificate No. TC-6121 Shree Datta Shetakari Sahakari Sakhar Karkhana Ltd Pre-feasibility report CONTENTS CONTENTS ................................................................................................................................................... i LIST OF FIGURES ..................................................................................................................................... iv LIST OF TABLES ........................................................................................................................................ v LIST OF ABBREVIATIONS ...................................................................................................................... vi 1. EXECUTIVE SUMMARY................................................................................................................... 1 2. INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION .................................... 4 2.1. Identification of Project and Project proponent ................................................................................ 4 2.1.1. Project Proponent .......................................................................................................................... 5 2.1.2. Project Consultant ......................................................................................................................... 6 2.2. A brief description of the nature of the project ................................................................................. 6 2.2.1. Environmental Clearance of existing Sugar and Distillery Plants ................................................ 7 2.2.2. Consent to Operate of existing Sugar and Distillery Plants .......................................................... 7 2.3. Need for the project and its importance to the country and or region ............................................... 7 2.4. Demand-Supply Gap ......................................................................................................................... 8 2.5. Imports vs. Indigenous products ....................................................................................................... 8 2.6. Export possibility .............................................................................................................................. 8 2.7. Domestic / Export markets ................................................................................................................ 8 2.8. Employment Generation (Direct and Indirect) due to the project ..................................................... 8 3. PROJECT DESCRIPTION ................................................................................................................... 8 3.1. Type of project including interlinked and interdependent projects, if any. ...................................... 8 3.2. Location with coordinates ................................................................................................................. 9 3.3. Details of alternate sites considered and the basis of selecting the proposed site (particularly the environmental considerations gone into should be highlighted) ................................................................. 14 3.4. Size or magnitude of the operation ................................................................................................. 15 3.5. Project description with process details .......................................................................................... 15 3.5.1. Process Details ............................................................................................................................ 15 3.5.1.1. White Sugar Manufacturing Process ....................................................................................... 15 Manufacturing Process ................................................................................................................................ 16 3.5.1.2. Distillery Process .................................................................................................................... 17 Process for the manufacture of alcohol: ...................................................................................................... 17 3.5.1.3. Cogeneration Power Plant ....................................................................................................... 24 Page | i Shree Datta Shetakari Sahakari Sakhar Karkhana Ltd Pre-feasibility report 3.6. Raw material required along with estimated quantity, likely source, marketing area of the final product, Mode of transport of raw material and finished product. ............................................................. 26 3.7. Resource optimization/recycling and reuse envisaged in the project should be briefly outlined. .. 26 3.8. Availability of water its source, Energy / Power requirement and source ...................................... 26 3.9. The quantity of waste to be generated (liquid and solid) and scheme for their Management/Disposal ................................................................................................................................. 27 4. SITE ANALYSIS ............................................................................................................................... 28 4.1. Background of the Site Location .................................................................................................... 28 4.2. Connectivity .................................................................................................................................... 28 4.3. Land Form, Land use and Land ownership ..................................................................................... 28 4.4. Topography (along with a map) ...................................................................................................... 29 4.5. Existing Infrastructure..................................................................................................................... 29 4.6. Soil Classification ........................................................................................................................... 29 4.7. Climatic data from stationary sources ............................................................................................. 29 4.8. Social Infrastructure available ........................................................................................................ 29 5. PLANNING BRIEF ............................................................................................................................ 30 5.1. Planning Concept (a type of industries, facilities, transportation etc.) Town and country planning / Development authority Classification ......................................................................................................... 30 5.2. Population Projection ...................................................................................................................... 30 5.3. Land use planning (breakup along with green belt etc) .................................................................. 30 5.4. Assessment of Infrastructure Demand (Physical and Social) ......................................................... 30 5.5. Amenities / Facilities ...................................................................................................................... 30 6. PROPOSED INFRASTRUCTURE .................................................................................................... 30 6.1. Industrial Area (Processing Area) ................................................................................................... 30 6.2. Residential Area (Non-Processing Area) ........................................................................................ 30 6.3. Greenbelt ......................................................................................................................................... 31 6.4. Social Infrastructure ........................................................................................................................ 31 6.5. Connectivity (Traffic and Transportation Road/Rail/Metro/Waterways etc.) ................................ 31 6.6. Drinking Water Management (Source and Supply of water) .......................................................... 31 6.7. Sewerage System ............................................................................................................................ 31 6.8. Industrial Waste Management ........................................................................................................ 31 6.9. Solid Waste Management ............................................................................................................... 31 6.10. Power requirement & Supply / Source ......................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    41 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us