Hampton Roads District

Hampton Roads District

THE VIRGINIA TRANSPORTATION HamPTon RoaDS DiSTRiCT 2011 – 2016 fT DRA kING OR W Commonwealth Transportation Board Virginia Department of Transportation Virginia Department of Rail and Public Transportation 05/19/10 243 This Page Is Intentionally Left Blank 244 05/19/10 FY11 DRAFT SYIP FY2011-2016 Six-Year Improvement Program HAMPTON ROADS DISTRICT Funding Allocation Summary (000's) HAMPTON ROADS DISTRICT System Fund Source Name FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Totals Interstate Interstate Federal $802 $13,196 $47,336 $77,401 $91,284 $328 $230,346 State Match 201 3,172 9,100 12,790 17,558 36 42,857 Residue Parcel Revenue State 347 0 0 0 0 0 347 Total $1,350 $16,368 $56,436 $90,191 $108,842 $364 $273,550 Primary Bond Match State Bond Match $2,152 $2,451 $2,415 $5,717 $1,030 $383 $14,148 Bridge Replacement Federal 1,008 1,797 2,209 996 3,680 1,531 11,221 CMAQ Federal 0 0 528 616 616 0 1,760 State Match 0 0 132 154 154 0 440 Demonstration Funds Federal 1,237 0 0 0 0 0 1,237 Federal STP Federal 0 1,858 2,575 19,460 438 0 24,331 Maintenance Funds Statewide 0 0 4,500 0 0 0 4,500 Minimum Guarantee Federal 7,601 6,150 4,878 2,412 0 0 21,041 National Highway System Allocations Federal 0 10,814 15,496 15,426 458 0 42,194 State Match 0 2,703 3,874 3,857 115 0 10,549 Residue Parcel Revenue State 6 0 0 0 0 0 6 RSTP (STP Regional) Federal 2,160 2,160 2,160 2,160 2,080 0 10,720 State Match 540 540 540 540 520 0 2,680 Toll Facilities Toll Facilities Revolving 11,000 0 0 0 0 0 11,000 Total $25,704 $28,473 $39,307 $51,338 $9,091 $1,913 $155,827 Secondary Bond Match State Bond Match $417 $0 $53 $337 $891 $655 $2,353 Bridge Replacement Federal 167 0 213 1,350 2,468 2,618 6,816 Federal STP Federal 237 0 0 0 1,096 0 1,333 Minimum Guarantee Federal 1,265 0 0 0 0 0 1,265 Residue Parcel Revenue Secondary Formula State 871 864 864 864 864 864 5,190 Total $2,957 $864 $1,130 $2,551 $5,319 $4,136 $16,958 Urban Bond Match State Bond Match $4,718 $4,958 $7,498 $6,588 $658 $0 $24,420 05/19/10 245 FY11 DRAFT SYIP FY2011-2016 Six-Year Improvement Program HAMPTON ROADS DISTRICT Funding Allocation Summary (000's) HAMPTON ROADS DISTRICT - cont. System Fund Source Name FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Totals Bridge Replacement Federal 10,633 15,283 12,783 10,256 212 0 49,167 CMAQ Federal 3,515 5,037 3,649 1,096 1,106 0 14,402 State Match 879 1,259 912 274 276 0 3,600 Federal STP Federal 1,306 2,132 17,209 16,095 2,421 0 39,163 Highway Safety Improvements Federal 1,122 0 0 0 0 0 1,122 State Match 125 0 0 0 0 0 125 Local Project Contributions Local 8,056 16,053 8,222 4,638 0 0 36,968 Minimum Guarantee Federal 3,643 2,418 0 0 0 0 6,062 National Highway System Allocations Federal 642 13,425 2,686 0 0 0 16,754 State Match 161 3,356 672 0 0 0 4,188 Residue Parcel Revenue State 6 0 0 0 0 0 6 RSTP (STP Regional) Federal 8,320 8,110 9,219 9,289 9,440 0 44,379 State Match 2,080 2,027 2,305 2,322 2,360 0 11,095 Total $45,205 $74,059 $65,154 $50,558 $16,474 $0 $251,450 Transit CMAQ Federal $8,144 $4,349 $5,818 $8,074 $7,643 $0 $34,028 State Match 1,995 1,087 1,454 2,018 1,911 0 8,466 RSTP (STP Regional) Federal 8,767 7,540 7,586 7,633 7,680 0 39,206 State Match 2,192 1,885 1,897 1,908 1,920 0 9,802 Total $21,098 $14,862 $16,755 $19,633 $19,154 $0 $91,502 Other CMAQ Federal $464 $2,873 $2,459 $2,799 $3,419 $12,986 $25,001 State Match 157 718 615 700 855 3,247 6,291 CMAQ TERMS Federal 400 0 0 0 0 0 400 State Match 100 0 0 0 0 0 100 RSTP (STP Regional) Federal 42 1,950 1,078 1,250 1,426 20,922 26,669 State Match 10 487 270 313 356 5,231 6,667 Total $1,173 $6,029 $4,421 $5,062 $6,056 $42,386 $65,128 Grand Total $97,487 $140,655 $183,203 $219,334 $164,936 $48,800 $854,415 246 05/19/10 FY11 DRAFT SYIP Interstate FY2011-2016 Six-Year Improvement Program HAMPTON ROADS DISTRICT District-wide PROJECT FO PROGRAM/SYSTEM MPO Area UPC NO.: 70618 HAMPTON ROADS INTERSTATE Interstate Hampton Roads DISTRICTWIDE SIGNS DESCRIPTION: VARIOUS ROUTES REQUIRED ALLOCATIONS (000's) REQ'D AFTER Fund Sources Prev. Alloc FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 2016 Interstate: Federal 175 0 0 0 0 0 0 Interstate: State Match 19 0 0 0 0 0 0 Total 194 0 0 0 0 0 0 ROUTE: 0044 PROJECT FO PROGRAM/SYSTEM MPO Area UPC NO.: 19005 I-264/LYNNHAVEN INTERCHANGE Interstate Hampton Roads IMPROVEMENTS (PHASE II) REPORT NOTE: Partial PE only. MPO Project. Revised schedule required based on available funding. STREET NAME: ESTIMATED COST (000's) SCHEDULE JURISDICTION: Virginia Beach PE 11,230 Underway DESCRIPTION: LYNNHAVEN RW 11,744 N/A CN 96,406 N/A SCOPE OF WORK: NEW CONSTRUCTION - SURFACE TREATMENT TO 119,380 PROJECT LENGTH: 0.0000 MI REQUIRED ALLOCATIONS (000's) REQ'D AFTER Fund Sources Prev. Alloc FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 2016 CMAQ (Congestion Mitigation and Air 400 0 0 0 0 0 0 Quality): Federal Interstate: Federal 2,066 0 0 0 0 0 0 Interstate: State Match 263 0 0 0 0 0 0 Non-Formula: Statewide 132 0 0 0 0 0 0 Priority Transportation Funds: State 4,343 0 0 0 0 0 0 RSTP (STP Regional): Federal 528 0 0 0 0 0 0 Urban Formula: State Match 100 0 0 0 0 0 0 Total 7,832 0 0 0 0 0 0 111,547 ROUTE: 0044 PROJECT FO PROGRAM/SYSTEM MPO Area UPC NO.: 52305 RTE 44/264 - SURFACE REPAIR & Interstate Hampton Roads REHABILITATION OF ROADWAY REPORT NOTE: Revised schedule required. STREET NAME: ESTIMATED COST (000's) SCHEDULE JURISDICTION: Virginia Beach PE DESCRIPTION: RW CN 16,500 FY2012 SCOPE OF WORK: RESTORATION & REHAB TO 16,500 PROJECT LENGTH: 0.0000 MI REQUIRED ALLOCATIONS (000's) REQ'D AFTER Fund Sources Prev. Alloc FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 2016 Interstate: Federal 0 0 0 0 5,175 5,175 328 Interstate: State Match 0 0 0 0 575 575 36 (M) Maintenance Funds: Statewide 4,636 0 0 0 0 0 0 Total 4,636 0 0 0 5,750 5,750 364 0 05/19/10 247 FY11 DRAFT SYIP Interstate FY2011-2016 Six-Year Improvement Program HAMPTON ROADS DISTRICT ROUTE: 0064 PROJECT FO PROGRAM/SYSTEM MPO Area UPC NO.: 12379 RTE 64 - WIDENING TO 6 LANES WITH HOV Interstate Hampton Roads LANES STREET NAME: ESTIMATED COST (000's) SCHEDULE JURISDICTION: Chesapeake PE 6,375 Complete DESCRIPTION: FROM: 1.17 MILES EAST BATTLEFIELD BLVD TO: RW 6,662 Complete 0.87 MILE WEST SOUTHBOUND I-464 (3.1200 MI) CN 116,789 Complete SCOPE OF WORK: MAJOR WIDENING TO 129,826 PROJECT LENGTH: 3.1200 MI REQUIRED ALLOCATIONS (000's) REQ'D AFTER Fund Sources Prev. Alloc FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 2016 General Fund: Federal 2,148 0 0 0 0 0 0 Interstate: Federal 100,472 0 0 0 0 0 0 Interstate: State Match 24,322 0 0 0 0 0 0 Priority Transportation Funds: State 2,884 0 0 0 0 0 0 Total 129,826 0 0 0 0 0 0 0 ROUTE: 0064 PROJECT FO PROGRAM/SYSTEM MPO Area UPC NO.: 12834 HAMPTON ROADS THIRD CROSSING - (PE Interstate NonMPO ONLY) REPORT NOTE: HRTA Project. Partial PE funding only. Estimate includes all segments of 3rd crossing. STREET NAME: THIRD CROSSING ESTIMATED COST (000's) SCHEDULE JURISDICTION: Hampton PE 929,861 Underway DESCRIPTION: FROM: I-64 (HAMPTON COLISEUM) TO: I-564 RW 81,343 FY2014 CN 3,824,324 FY2018 SCOPE OF WORK: NEW CONSTRUCTION TO 4,835,528 PROJECT LENGTH: 0.0000 KM REQUIRED ALLOCATIONS (000's) REQ'D AFTER Fund Sources Prev. Alloc FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 2016 Demonstration Funds: Federal 7,194 0 0 0 0 0 0 Interstate: Federal 2,400 0 0 0 0 0 0 Interstate: State Match 600 0 0 0 0 0 0 Total 10,194 0 0 0 0 0 0 4,825,334 ROUTE: 0064 PROJECT FO PROGRAM/SYSTEM MPO Area UPC NO.: 16042 RTE 64 - TRAFFIC MANAGEMENT SYSTEM Interstate Hampton Roads STREET NAME: ESTIMATED COST (000's) SCHEDULE JURISDICTION: Hampton PE 342 Complete DESCRIPTION: FROM: MAGRUDER BOULEVARD TO: ROUTE RW 199(INCLUDES NEWPORT NEWS, HAMPTON & CN 35,889 Complete YORK COUNTY) SCOPE OF WORK: SAFETY/TRAFFIC OPERS/TSM TO 36,230 PROJECT LENGTH: 0.0000 MI REQUIRED ALLOCATIONS (000's) REQ'D AFTER Fund Sources Prev.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    182 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us