SL NO Short Text Unit Quantity 1 CAPX-I/18-20 TPT RSA

SL NO Short Text Unit Quantity 1 CAPX-I/18-20 TPT RSA

SL NO Short Text Unit Quantity 1 CAPX-I/18-20 TPT RSA SU 1 2 MAHARASHTRA - MONOLITH-FRONTLIT SU 1 3 Operation & maintenance of PMCC Oct'18 SU 7 4 PIPELINE REPAIR WORK SU 1 5 002_12.07.18_Air gauge & Compressor SU 5 6 01_HOARDING BOARDS @ Lakshmi KSK SU 1 7 10 KL TANK EA 234 8 100 MMD X 6 M L COMP. HOSE B/E 4IN FLA( SU 46 9 118235- T-M--HANUMAPPA-FILLING-STATION EA 5794 10 14.2 KG STP DONE SU 31 11 185721 PCM PETROLEU - 17 M HMS - Inland SU 1 12 2 hoardings and Poles Tirupati FS Biswa SU 20 13 20 Desktop PC SU 11 14 20 kl tank installtion SU 1 15 20 kl tank Reaplacement at kargil f/s SU 1 16 24Hrs-Security w&wAlliedServices-24Hrs SU 229 17 272761 KUMAR AGENCIES-Backlit Section SU 6 18 425 KG FACILITY AT JAIPUR BP SU 16 19 A Site for 2nd Year-178460 SRI M.K.R. A SU 2 20 A SITE KSK_AGARKHED_4816483 (Non PM) EA 705 21 AC - 3 phase, Variable Frequency Drive TO 252.5 22 ADDITIVE 5014 SU 1 23 Addl vehicle for training SU 17 24 ADDL DU INSTLN AT JK MAKAKVI _KHANAPUR SU 2 25 Adjoining road-Civil works SU 4 26 ADO-CAT-B SET 95 27 alarm annunciator panel for Hi & HiHi l SU 8 28 Anand Petroleum SU 1 29 Ankleshwar Taluka-CP Upgradation SU 513 30 ausgram station SU 196 31 Automation of ABINAV FUEL CENTER SU 14 32 Automation of Aman Fuel Thole road SU 9 33 Automation of new ROs SU 2 34 Automation of new ROs(navodya f.s ) SU 4 35 Automation of new ROs-Delhi DO SU 1 36 AUTOMATION UPS WORK AT JAIN PETROLEUM SU 1 37 AUTOMATION UPS WORK AT SANWALIA PATIDAR SU 9 38 Automation works at shahid prakash pati SU 33 39 B Site for 1st Year-307696 MARUDHAN AGE SU 128 40 B Site-133505 ILAHI AGENCIES (LOCK NO - SU 114 41 B Site-222098 STAR FILLING STATION SU 6 42 B To A Srinivas petroleum-Nandikoor_Mec SU 3 43 BANGALADESH EXPORT SU 10 44 Bharati petroleum KSK EA 30 45 BOMBAY DYEING BATH TOWEL EA 30 46 BOMBAY DYEING HAND TOWEL SU 59 47 BRAVURA FUEL STATION-252535 SU 5 48 Bucket Filling Line 2.21 SU 3 49 canopy (8x6) SU 2 50 Capex 0-30 Lacs Kolkata DO SU 1 51 CAT - 1 ALTERATION TO MANHOLE WORK DHIG SU 1 52 CAT II- GDO LED Light at Vijayanand Hig EA 60 53 CCOE APPROVED 2 " EMERGENCY SHUTOFF VA SU 3 54 CLEANING & REPL OF CHECK VALVE AT OUR L SU 2 55 CONSTRUCTION OF APPROACH, GANGAI SU 1 56 CONSTRUCTION OF COMPOUND WALL, DEVELOPM SU 1 57 Construction of Restroom for TT crew&CL SU 1 58 CONSULTANCY SERVICES FOR EIA STUD SU 1 59 CONVERSION OF 02 Nos SKO TANK TO IFRVT KG 2725 60 CS WELDING FILLER ROD TIG - 1.6 MM SU 1 61 CVT STABLIZER AT VEER SAWARKAR EA 525 62 cvt verifier as per tender specificatio EA 41555540 63 CYLINDER , LPG , 14.2 KG EA 3222 64 CYLINDER , LPG , 14.2 KG ( Defective) EA 664653 65 CYLINDER , LPG , 14.2 KG ( Rejected) EA 6240 66 CYLINDER , LPG , 14.2 KG (OK) EA 12858 67 CYLINDER , LPG , 14.2 KG (REJECTED) EA 183195 68 CYLINDER , LPG , 14.2 KG (Sound) EA 2621 69 CYLINDER , LPG , 14.2 KG Ok EA 14421 70 CYLINDER , LPG , 14.2 KG REJ EA 3466 71 CYLINDER , LPG , 14.2 KG Reject EA 750 72 CYLINDER , LPG , 14.2 KG rejected EA 602 73 CYLINDER , LPG , 14.2 KG- REJECTED EA 37171 74 CYLINDER , LPG , 14.2 KG(Rejected) EA 9023 75 CYLINDER , LPG , 14.2 KG;HR OK EA 68000 76 CYLINDER , LPG , 14.2 KG;PAINTING EA 334171 77 CYLINDER , LPG , 14.2 KG;STP OK EA 1380460 78 CYLINDER , LPG , 14.2 KG-OK EA 160446 79 CYLINDER , LPG , 14.2 KG-Rejected EA 700 80 CYLINDER , LPG , 14.2 KG-VENDOR REJECT EA 1000 81 CYLINDER , LPG , 19.0 KG;PAINTING EA 25000 82 CYLINDER , LPG , 5.0 KG;PAINTING SU 2 83 D & R AGENCIES, ORATHANADU - NON CIVIL SU 3 84 DESIGN, SUPPLY, INSTALLATION, TESTING & EA 5840150 85 DGCC (LPG)-- BLUE BOOK SU 1 86 DGR security SU 62 87 DIVINE FULES -SPREADERS SU 1 88 DOUBLE SIDE HOARDING AT MATESHWARI F/S EA 82 89 Drive unit complete in all respects con SU 25 90 Driveway at M/s.Sujatha Petrol FS,Isnap SU 1 91 Driveway at ro Harbans lal &Sons SU 2 92 DS Filling center-Inv: GE/18-19/97 SU 2 93 DU INSTALLATION AT OM MAA SHANTI KSK SU 1 94 du replacement - archana petroleum amod SU 16 95 ECURITY SERVICES - WDO-MAY'19 SU 1 96 ELETRICAL AUDIT WORK SU 7 97 Emergency car for Plant CAR 590048 98 ERVO LONG LIFE GREASE-20 X 1/2 KG SU 1 99 ESC WEGES AMC CHAIN CONVEYOR SU 3 100 Fine Filter Complete Assembly suitable SU 63 101 FLEX AT SREEDURGA MILENIUM SU 14 102 FRB SIGNAGE-SAIBABA FP-NZB/079 SU 1 103 galvinium sheet SU 1 104 GDO CONFERENCE HALL PAINTING AT IOCL SU 2 105 General Shift Car Services @ Feb'19 SU 1 106 ghelabhai gopalji - du installation SU 2 107 Glow Sign Board SU 3 108 Green Belt contract SU 3 109 GSCS - tank installation SU 1 110 H/HK contract works at Trichy Tl JUL'18 SU 1 111 Haulage Contract under PDO:Mar18 SU 4 112 HEERA &SONS DRIVEWAY MAYANK CONSTRU SU 1 113 HEERA &SONS TOILET BLOCK MAYANK CONSTRU SU 3 114 HOARDING (60X10).Sidhadev KSK Moradabad SU 37 115 HOUSEKEEPING ( 01.04.18 TO 31.08.18) SU 1 116 Housekeeping Sewee-II SU 1 117 Housekeeping work( Feb - Mar19) SU 4 118 HYDROTESTING & PIPELINE WRK AT SANTOSH SU 4 119 Installation Earthing work SU 1 120 installation of Du at Rashpion fs SU 1 121 installation of Du at Baweja Brosthers SU 1 122 installation of Du at bhayana oil SU 1 123 installation of Du at Darla Ss SU 1 124 installation of Du at Gagan fs SU 1 125 installation of Du at Jai Hind Fs SU 1 126 installation of Du at kinfed fs SU 1 127 installation of Du at lala Badri Prasad SU 1 128 Installation of DU at M/s Dharampal FS, SU 1 129 Installation of DU at M/s Ganesh KSK,Bh SU 1 130 installation of Du at Modern Fs Kangra SU 1 131 installation of Du at Pabbar Valley SS EA 134 132 Intermediate Sleeve SU 46 133 JUNCTION BOX WORKS FOR AUTOMATION SYSTE SU 1 134 KAPP EMPLOYEES CONSUMER -DU Replacement EA 26 135 LaserJet Printer for Vijayawada AO SU 7 136 LAY OF CABLE@MAHALAXMI FS-147 SU 13 137 LAY OF CABLE@MY NATION GAS STATION-145 SU 1 138 Lube new tank, Paragon SU 8 139 M&R WORK AT GL-TPL(JV) KHANNA SU 1 140 Maa Ashapuree Petroleum,- Pipeline work SU 2 141 MAHAVIR AUTOM TANK INSTALLATION MILIND SU 2 142 MAHAVIR AUTOMOBILE TANK INSTALLATION SU 6 143 MANHOLE ALTERATION ;ALLIED JOB AT ABHAY SU 7 144 MANHOLE ALTERATION ;ALLIED JOB AT K.G.N SU 5 145 MANHOLE ALTERATION ;ALLIED JOB AT RAVIT SU 5 146 MANHOLE ALTERATION ;ALLIED JOB AT SHAHI SU 5 147 MANHOLE ALTERATION AT CHOUDHARY HI-TECH SU 2 148 MANHOLE ALTERATION;ALLIED JOB AT AJIT S SU 2 149 MANHOLE ALTERATION;ALLIED JOB AT BHAGWA SU 5 150 MANHOLE ALTERATION;ALLIED JOB AT JYOTI SU 1 151 MANHOLE ALTERATION;ALLIED JOB AT MOTIPU SU 3 152 MANHOLE ALTERATION;ALLIED JOB AT RAM KS SU 23 153 MANHOLE MODI. AVANEESH PETROLEUM SU 5 154 MANHOLE WORKS AT THE GDO ROS SU 1 155 MATIN FIL&FLY CVT & Stablizers MUNNALAL SU 10 156 MCB FIXING&WIRING@COCO VEMPA S-163 SU 10 157 MCB FIXING&WIRING@DEVI FS SABBAVA S-190 SU 1 158 MDO CAT A(0-2Lacs) BADAUN SU 3 159 MDO CAT A(0-2Lacs) Najibabad EA 284 160 Mechanical Seal Assy EA 10 161 MIDBACK REVOLVING CHAIR SU 1 162 Misc. work GB Company, Sikka, Dist.Jam SU 4 163 MISC. WORKS SU 2 164 MOD B TO A SHIVA SAI FS KSK -P/M SU 2 165 Monolith foundation at BHUVANESHWAR SS SU 27 166 Monolith-Backlit-177029 KAMALA ENTERPRI SU 100 167 NASAR AGENCIES CHANGED BHAVANI AGY SU 1 168 NDO-CAPEX CAT A SU 2 169 NEW B SITE KSK AT TIRLA DIST DHAR SU 2 170 New CP Ashoka Buildcon SU 1 171 New CP at JKM, Forbesganj SU 1 172 NEW CP- Shivalaya Construction SU 1 173 NEW CP- Sunil Hitech Vadhona SU 1 174 New KSK at Sarai Bujurg, Dist:Kaushambi SU 384 175 NRO, Chikkarampalayam-Column Cladding EA 23182 176 OK CYLINDER , LPG , 14.2 KG EA 18962 177 OK STP CYLINDER , LPG , 14.2 KG SU 1 178 om sai darshan - du shifting SU 1 179 Operation & maintenance of PMCC SEP'18 SU 1 180 Operation and maintenance of PMCC jun'1 SU 1 181 Operation and maintenance-PMCC JUL'18 SU 4 182 P/F VETRIFIED TILES ELECT WRK PAINTING EA 3282 183 Packing , Forwarding and freight SU 1 184 PAINTING WORKS SU 4 185 PAINTING WORK SU 4 186 PART-A fab,erect,testingandcomm 3X600MT SU 1 187 PC071*18.05.18,Electrical work SU 1 188 PCC Concreting SU 6 189 Phadtare Krushi seva kendra SU 1 190 PICKUP VAN TN45BM6918 FOR NOV'18 SU 1 191 PICKUP VAN TN45BM7106 FOR NOV'18 SU 1 192 PIPE LINE WORK PUNJAB MOTORS HSD SITE SU 1 193 PIPELINE WORK TO 1015.75 194 PL,CS,IS 2062,GRADE B,8 MM, 2000X6300MM SU 2 195 Plant & Mach.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    745 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us